Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 574 ]
�
� |
Information on alternative modulation formats for revision of sup.39
�
� |
Alcatel-Lucent
� |
Q6/15
� |
2007-05-25 |
|
[ 573 ]
�
� |
Proposal for 43Gb/s application at G.dapp2 considering PSBT (ODB) modulation format for 100GHz and for 50 GHz channel spacing.
�
� |
Alcatel-Lucent
� |
Q6/15
� |
2007-05-25 |
|
[ 572 ]
�
� |
Proposal for revision of G.671 to extend the wavelength range of chromatic dispersion compensating components
�
� |
Alcatel-Lucent
� |
Q7/15
� |
2007-05-25 |
|
[ 571 ]
�
� |
G.paclock document structure
�
� |
Zarlink
� |
Q13/15
� |
2007-05-25 |
|
[ 570 ]
�
� |
G.paclock - editorial/clarifications
�
� |
Zarlink
� |
Q13/15
� |
2007-05-25 |
|
[ 569 ]
�
� |
G.paclock - Clause 5.7.4.1 - Phase discontinuity for EEC-Option 1
�
� |
Zarlink
� |
Q13/15
� |
2007-05-25 |
|
[ 568 ]
�
� |
G.paclock - Clause 5.7.3 - Phase response to input signal interruptions
�
� |
Zarlink
� |
Q13/15
� |
2007-05-25 |
|
[ 567 ]
�
� |
G.paclock - Figure 14
�
� |
Zarlink
� |
Q13/15
� |
2007-05-25 |
|
[ 566 ]
�
� |
Synchronous Ethernet - jitter requirements
�
� |
Zarlink
� |
Q13/15
� |
2007-05-25 |
|
[ 565 ]
�
� |
G.paclock - Clause 5.4.3 Jitter
�
� |
Zarlink
� |
Q13/15
� |
2007-05-25 |
|
[ 564 ]
�
� |
G.paclock - Clause 5.5.2 Jitter Tolerance
�
� |
Zarlink
� |
Q13/15
� |
2007-05-25 |
|
[ 563 ]
�
� |
Line timing in Synchronous Ethernet
�
� |
Zarlink
� |
Q13/15
� |
2007-05-25 |
|
[ 562 ]
�
� |
G.7713, SP34 - interlayer description
�
� |
Nortel Networks (Canada)
� |
Q14/15
� |
2007-05-25 |
|
[ 561 ]
�
� |
ASON Call Routing
�
� |
Nortel Networks (Canada)
� |
Q14/15, Q12/15
� |
2007-05-25 |
|
[ 560 ]
�
� |
Link Aggregation
�
� |
Nortel Networks (Canada)
� |
Q9/15
� |
2007-05-25 |
|
[ 559 ]
�
� |
RPR for G.8021
�
� |
Nortel Networks (Canada)
� |
Q9/15
� |
2007-05-25 |
|
[ 558 ]
�
� |
G.8261 Appendix IX Use Cases Transport Requirements
�
� |
Nortel Networks (Canada)
� |
Q13/15
� |
2007-05-25 |
|
[ 557 ]
�
� |
G.8261 Appendix IX clarifications
�
� |
Nortel Networks (Canada)
� |
Q13/15
� |
2007-05-25 |
|
[ 556 ]
�
� |
ERP Interactions with Layer 2 Network Control Protocols
�
� |
Nortel Networks (Canada)
� |
Q9/15
� |
2007-05-25 |
|
[ 555 ]
�
� |
Ethernet - Shared Protection Ring (E-SPRing)
�
� |
Nortel Networks (Canada)
� |
Q9/15
� |
2007-05-25 |
|
[ 554 ]
�
� |
E-SPRing Handling of Multiple Failures
�
� |
Nortel Networks (Canada)
� |
Q9/15
� |
2007-05-25 |
|
[ 553 ]
�
� |
E-SPRing Failure Propagation
�
� |
Nortel Networks (Canada)
� |
Q9/15
� |
2007-05-25 |
|
[ 552 ]
�
� |
Specification of point to multipoint in G.8121 amendment 1
�
� |
Nortel Networks (Canada)
� |
Q9/15
� |
2007-05-25 |
|
[ 551 ]
�
� |
Updates to G.8080 LRM and TAP components to support packet switching
�
� |
Nortel Networks (Canada)
� |
Q12/15
� |
2007-05-25 |
|
[ 550 ]
�
� |
Ethernet services
�
� |
Nortel Networks (Canada)
� |
Q9/15, Q11/15
� |
2007-05-25 |
|
[ 549 ]
�
� |
WITHDRAWN - See C397
�
� |
N/A (no se aplica)
� |
� |
N/A |
|
[ 548 ]
�
� |
G.vdsl: Comparison between improved Logging and Histograms
�
� |
Alcatel-Lucent Bell
� |
Q4/15
� |
2007-05-25 |
|
[ 547 ]
�
� |
G.VDSL, G.ploam: Improved Impulse Noise Logging: Proposed Working Text
�
� |
Alcatel-Lucent Bell
� |
Q4/15
� |
2007-05-25 |
|
[ 546 ]
�
� |
G.vdsl: Calculations and impact of non-consecutive impulse noise
�
� |
Alcatel-Lucent Bell
� |
Q4/15
� |
2007-05-25 |
|
[ 545 ]
�
� |
G.ploam: Full Proposed Text for Equalized FEXT UPBO method in VDSL2
�
� |
Alcatel-Lucent Bell
� |
Q4/15
� |
2007-05-25 |
|
[ 544 ]
�
� |
G.vdsl: Single Method for FEXT Cancellation
�
� |
Alcatel-Lucent Bell
� |
Q4/15
� |
2007-05-25 |
|
[ 543 ]
�
� |
G.vdsl: Information required for decision on FEXT cancellation
�
� |
Alcatel-Lucent Bell,
,
Ericsson
,
Nokia Siemens Networks,
� |
Q4/15
� |
2007-05-25 |
|
[ 542 ]
�
� |
G.vdsl: Impact of a disorderly leaving event on a precoded VDSL2 system
�
� |
Alcatel-Lucent Bell
� |
Q4/15
� |
2007-05-25 |
|
[ 541 ]
�
� |
G.vdsl: Need for backward compatibility with respect to FEXT cancellation methods
�
� |
Alcatel-Lucent Bell
� |
Q4/15
� |
2007-05-25 |
|
[ 540 ]
�
� |
G.vdsl: On the tracking speed required for changing crosstalk channels
�
� |
Alcatel-Lucent Bell
� |
Q4/15
� |
2007-05-25 |
|
[ 539 ]
�
� |
G.vdsl: Information required for decision on FEXT cancellation : method based on reporting of Hchannel(f)
�
� |
Alcatel-Lucent Bell
� |
Q4/15
� |
2007-05-25 |
|
[ 538 ]
�
� |
G.vdsl: Information required for decision on FEXT cancellation : method based on reporting of Error(f)
�
� |
Alcatel-Lucent Bell
� |
Q4/15
� |
2007-05-25 |
|
[ 537 ]
�
� |
Considerations of FEC using 32 byte interleaved RS(255,239) codecs for OTU4 in G.709
�
� |
ETRI
� |
Q11/15
� |
2007-05-26 |
|
[ 536 ]
�
� |
G.VDSL: Improved Impulse Noise Logging: Overview
�
� |
Alcatel-Lucent Bell
� |
Q4/15
� |
2007-05-25 |
|
[ 535 ]
�
� |
Proposal on state transition tables for T-MPLS linear protection switching
�
� |
ETRI,
,
Huawei Technologies
� |
Q9/15
� |
2007-05-25 |
|
[ 534 ]
�
� |
Proposal to study Ethernet transparency over OTN
�
� |
NTT
� |
Q11/15
� |
2007-05-25 |
|
[ 533 ]
�
� |
Items under study in Q12
�
� |
BT
� |
Q12/15
� |
2007-05-25 |
|
[ 532 ]
�
� |
Proposed clarification of GFP mapping for OSI protocols
�
� |
Tellabs Oy
� |
Q11/15
� |
2007-05-25 |
|
[ 531 ]
�
� |
Support of 1 Gbps and 10Gbps Ethernet remote failures via GFP CMF/CSF
�
� |
Tellabs Oy
� |
Q11/15, Q9/15
� |
2007-05-25 |
|
[ 530 ]
�
� |
Proposal to continue consideration of OTU4 bit rate
�
� |
NTT
� |
Q6/15, Q11/15
� |
2007-05-25 |
|
[ 529 ]
�
� |
Proposal to clarify the characteristics of Ethernet transport over OTN
�
� |
NTT
,
NEC
,
Mitsubishi
,
NICT
,
KDDI
� |
Q11/15
� |
2007-05-25 |
|
[ 528 ]
�
� |
WITHDRAWN - See C527
�
� |
N/A (no se aplica)
� |
� |
N/A |
|
[ 527 ]
�
� |
Spectral excursion measurements with NRZ-DPSK modulation format
�
� |
Alcatel-Lucent, Germany
� |
Q6/15
� |
2007-05-25 |
|
[ 526 ]
�
� |
Comments on G.SUP42
�
� |
Mitsubishi electric Corp.
� |
Q1/15
� |
2007-05-25 |
|
[ 525 ]
�
� |
Proposal for Ethernet Rings Protection Switching Mechanisms
�
� |
NTT
,
Nokia Siemens Networks GmbH & Co. KG
� |
Q9/15
� |
2007-05-25 |
Resultados :332 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5 -
6 -
7
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):