Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 242 ]
�
� |
Impact of T-MPLS on a carrier operations group
�
� |
Cisco Systems
� |
Q14/15, Q12/15, Q11/15, Q9/15
� |
2006-10-20 |
|
[ 241 ]
�
� |
Two customer needs of 10GbE LAN PHY transport: one can be fulfilled by using existing standards and the other needs new standards
�
� |
Japan
� |
Q11/15
� |
2006-10-20 |
|
[ 240 ]
�
� |
Engagement of ITU-T SG15 with IEEE 802.3 Higher Speed Study Group (802.3 HSSG) in consideration of current 802.3 HSSG efforts to define objectives for Higher Speed Ethernet
�
� |
AT&T
,
Sprint Nextel
,
Verizon
� |
Q12/15, Q11/15, Q9/15, Q6/15
� |
2006-10-20 |
|
[ 239 ]
�
� |
Proposal of wavelength-selective-switch-based photonic cross-connect for transparent optical network systems in G.otf
�
� |
NTT
� |
Q6/15
� |
2006-10-20 |
|
[ 238 ]
�
� |
Proposals for Definitions and Appendix to support revision of G.666 (ex G.PMDC)
�
� |
Alcatel
� |
Q7/15
� |
2006-10-20 |
|
[ 237 ]
�
� |
Proposal to discuss on OSNR sensitivity data at applications for narrow spectral excursion at new G.dapp2
�
� |
Alcatel
� |
Q6/15
� |
2006-10-20 |
|
[ 236 ]
�
� |
Proposals for application code with wide spectral excursion at G.dapp2
�
� |
Alcatel
� |
Q6/15
� |
2006-10-20 |
|
[ 235 ]
�
� |
Ethernet protection and physical constraints
�
� |
BT
� |
Q9/15
� |
2006-10-20 |
|
[ 234 ]
�
(Rev.1)� |
All-Japan interoperability trial of full-transparent 10GbE LAN PHY transport
�
Rev1: Correction of a template issue causing the seventh contact not to appear
� |
Japan
� |
Q11/15
� |
2006-10-20 |
|
[ 233 ]
�
� |
Proposal for T-MPLS MIP Identification
�
� |
Alcatel
� |
Q12/15, Q9/15
� |
2006-10-20 |
|
[ 232 ]
�
� |
100 Gbit/s interface
�
� |
Alcatel
� |
Q11/15, Q9/15
� |
2006-10-20 |
|
[ 231 ]
�
� |
Multi-layer T-MPLS network architecture and layer network signal formats
�
� |
Alcatel
� |
Q12/15, Q11/15
� |
2006-10-20 |
|
[ 230 ]
�
� |
Comments on and proposals for G.650.2
�
� |
Deutsche Telekom
� |
Q5/15
� |
2006-10-20 |
|
[ 229 ]
�
� |
Definitions in G.666
�
� |
Deutsche Telekom
� |
Q7/15
� |
2006-10-20 |
|
[ 228 ]
�
� |
Work Load of Q12/15 - Proposal for advanced working methods
�
� |
Alcatel
� |
Q12/15
� |
2006-10-20 |
|
[ 227 ]
�
� |
Protocol extension for automatic discovery in OTN networks
�
� |
ETRI
� |
Q14/15
� |
2006-10-20 |
|
[ 226 ]
�
� |
Time distribution in synchronization networks
�
� |
Nortel Networks (USA)
� |
Q13/15
� |
2006-10-20 |
|
[ 225 ]
�
� |
SSM behaviour for packet networks
�
� |
Nortel Networks (USA)
� |
Q13/15
� |
2006-10-20 |
|
[ 224 ]
�
� |
Network limits for 1544 kbit/s interface description in G.8261
�
� |
USA
� |
Q13/15
� |
2006-10-20 |
|
[ 223 ]
�
� |
Additional Information on Virtual Synchronous Ethernet Method
�
� |
Adtran
� |
Q13/15
� |
2006-10-20 |
|
[ 222 ]
�
� |
SBS measurement: Proposal for text in G.650.2, Appendix II.5
�
� |
Corning Incorporated
� |
Q5/15
� |
2006-10-20 |
|
[ 221 ]
�
� |
Relationship of bend radius to reliability
�
� |
Corning Incorporated
� |
Q10/15
� |
2006-10-20 |
|
[ 220 ]
�
� |
G.VDSL2: Proposal on INM functionality for G.993.2 Amendment 1
�
� |
Ikanos Communications
,
Conexant Systems
� |
Q4/15
� |
2006-10-20 |
|
[ 219 ]
�
� |
Supporting Time synchronization (time-of-day) across a transmission network
�
� |
Tellabs Oy
� |
Q13/15
� |
2006-10-20 |
|
[ 218 ]
�
� |
Proposed mechanisms of Loop Free Ethernet Rings Protection
�
� |
NTT
� |
Q9/15
� |
2006-10-20 |
|
[ 217 ]
�
� |
The influence of loops on frame forwarding
�
� |
NTT
� |
Q9/15
� |
2006-10-20 |
|
[ 216 ]
�
� |
Comparison of Y.1731with IEEE802.1ag
�
� |
NTT
� |
Q9/15
� |
2006-10-20 |
|
[ 215 ]
�
� |
Proposal for Initial Draft of Ethernet Rings Protection
�
� |
NTT
� |
Q9/15
� |
2006-10-20 |
|
[ 214 ]
�
� |
Proposal of operation scenarios for VCAT and LCAS management in ASON
�
� |
NTT
� |
Q12/15
� |
2006-10-20 |
|
[ 213 ]
�
� |
Proposal of amendments for flexible connection release in G.7713
�
� |
NTT
� |
Q14/15
� |
2006-10-20 |
|
[ 212 ]
�
� |
Proposal of the modifications of description on the usage of SDH overhead for automatic discovery in G.707
�
� |
NTT
� |
Q11/15
� |
2006-10-20 |
|
[ 211 ]
�
� |
Inconsistent issue between G.959.1 and draft version G.667(ex-G.adc)
�
� |
ZTE Corporation
� |
Q7/15, Q6/15
� |
2006-10-20 |
|
[ 210 ]
�
� |
Impact of cascaded ONEs on line system channel uniformity in G.otf
�
� |
ZTE Corporation
� |
Q6/15
� |
2006-10-20 |
|
[ 209 ]
�
� |
Definition of SNP states in LRM
�
� |
ZTE Corporation
� |
Q12/15
� |
2006-10-20 |
|
[ 208 ]
�
� |
Comments on G.695 further revision
�
� |
ZTE Corporation
� |
Q6/15
� |
2006-10-20 |
|
[ 207 ]
�
� |
Combination of protection and restoration in G.8080
�
� |
ZTE Corporation
� |
Q12/15
� |
2006-10-20 |
|
[ 206 ]
�
� |
Classification of Maximum (residual) chromatic dispersion in G.dapp.2
�
� |
ZTE Corporation
� |
Q6/15
� |
2006-10-20 |
|
[ 205 ]
�
� |
Application of G.otf in optical networks
�
� |
ZTE Corporation
� |
Q6/15
� |
2006-10-20 |
|
[ 204 ]
�
� |
A Proposal for T-MPLS Tandem Connection Monitoring Mechanism
�
� |
ZTE Corporation
� |
Q9/15
� |
2006-10-20 |
|
[ 203 ]
�
� |
A proposal for T-MPLS support of the Diff-Serv
�
� |
ZTE Corporation
� |
Q12/15
� |
2006-10-20 |
|
[ 202 ]
�
� |
A Proposal for T-MPLS Loopback to G.8121
�
� |
ZTE Corporation
� |
Q9/15
� |
2006-10-20 |
|
[ 201 ]
�
� |
The corrigendum for G.8080 and G.7713
�
� |
ZTE Corporation
� |
Q14/15, Q12/15
� |
2006-10-20 |
|
[ 200 ]
�
� |
Some concerns on the new-type control plane for circuit & packet transport network
�
� |
ZTE Corporation
� |
Q14/15, Q12/15
� |
2006-10-20 |
|
[ 199 ]
�
� |
Proposals to start Directory Service research work
�
� |
ZTE Corporation
� |
Q14/15
� |
2006-10-20 |
|
[ 198 ]
�
� |
Proposals to add directory service component into G.8080
�
� |
ZTE Corporation
� |
Q12/15
� |
2006-10-20 |
|
[ 197 ]
�
� |
Proposal for the study of Ethernet OAM ME in G.984.4
�
� |
ZTE Corporation
� |
Q2/15
� |
2006-10-20 |
|
[ 196 ]
�
� |
Proposal on dispersion parameters in G.otf
�
� |
ZTE Corporation
� |
Q6/15
� |
2006-10-20 |
|
[ 195 ]
�
� |
Proposal for ROADM examples in G.otf Appendix I
�
� |
ZTE Corporation
� |
Q6/15
� |
2006-10-20 |
|
[ 194 ]
�
� |
Proposal for Physical Parameter Values in G.dapp2
�
� |
ZTE Corporation
� |
Q6/15
� |
2006-10-20 |
|
[ 193 ]
�
� |
Proposal for Measurement of OSNR penalty in G.dapp2
�
� |
ZTE Corporation
� |
Q6/15
� |
2006-10-20 |
Resultados :263 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5 -
6
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):