Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-R : WP-7A : Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-R�WP-7A� C�

UIT-R�WP-7A

Emisiones de Frecuencias Patr�n y de Se�ales Horarias

Resultados :76 documentos
Resultados :� Anterior�-� 1 - 2
Contribuciones��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 26 ]
Liaison statement to Working Parties 3K, 3L, 3M, 5A, 5B, 5C and 6A (copied for information to Working Parties 7A and 7D) - WRC-23 agenda item 1.12 � WP 7C AI1.12 2021-04-23
[ 25 ]
+Ann.1-2
Report of the meeting of Working Party 7A (19-23 April 2021, e-Meeting) � Chairman, WP 7A 2021-04-23
[ 24 ]
Final list of participants Working Party 7A (19-23 April 2021) � Director, BR 2021-04-23
[ 23 ]
List of documents issued (Documents 7A/13 - 7A/23) � BR Study Groups Department 2021-04-19
[ 22 ]
Response to WRC � IERS 2021-04-12
[ 21 ]
Proposed revisions to working document towards a preliminary draft new Report ITU-R TF. [UTC] � United States of America 2021-04-12
[ 20 ]
Proposed revision to working document towards a preliminary draft new Report ITU-R TF.[UTC] � France 2021-04-08
[ 19 ]
Proposed revision to preliminary draft new Report ITU-R TF.[SFTS PROTECTION CRITERIA] � France 2021-04-06
[ 18 ]
Proposals to draft liaison statement to CISPR (subcommittees B and H): Update to standard frequency and time signal services protection requirements in the CISPR radio services database � France 2021-04-06
[ 17 ]
Proposals to working document towards the preliminary draft new Report ITU-R TF.[UTC] � Russian Federation 2021-03-26
[ 16 ]
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Study Group 5 WP 1/5 and ITU-R Working Parties 1A, 1C, 4A, 5A, 5B, 5C, 5D, 6A, 7A and 7B on strategies and policies concerning human exposure to EMF � ITU-D SG 2 2020-10-23
[ 15 ]
Communication Note from TSB to ITU-R Working Party 4C and Working Party 7A - Publications of a technical Report "TP-GSTR-GNSS - Considerations on the use of GNSS as a primary time reference in telecommunications" � Telecommunication Standardization Bureau 2020-10-13
[ 14 ]
Reply liaison statement to Working Party 1A (copy for information to ITU-R Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B and 7C) - Liaison between ITU-R and CISPR on the protection of radio services in the 6-40 GHz frequency range � WP 7D 2020-09-21
[ 13 ]
+Ann.1-4
Report of the meeting of Working Party 7A (e-Meeting, 14-18 September 2020) � Chairman, WP 7A 2020-09-18
[ 12 ]
Final list of participants - Working Party 7A (e-Meeting, 14-18 September 2020) � Director, BR 2020-09-18
[ 11 ]
List of Documents issued (Documents 7A/1 - 7A/11) � BR Study Groups Department 2020-09-14
[ 10 ]
Proposal for modification of working document towards the preliminary draft new Report ITU-R TF.[UTC] - Content and structure of time signals to be disseminated by radiocommunication systems and various aspects of current and potential future reference time scales, including their impacts and applications in radiocommunication � Japan 2020-09-07
[ 9 ]
Proposed draft new Question: Timing applications and the definition of the second � United States of America 2020-09-07
[ 8 ]
Proposed revision to working document towards a preliminary draft new Report ITU-R TF.[SFTS PROTECTION CRITERIA] � United States of America 2020-09-07
[ 7 ]
Proposed revisions to working document towards a preliminary draft new Report ITU-R TF.[UTC] � United States of America 2020-09-07
[ 6 ]
Working document towards a preliminary draft new Report ITU-R TF.[UTC] - Content and structure of time signals to be disseminated by radiocommunication systems and various aspects of current and potential future reference time scales, including their impacts and applications in radiocommunication � France 2020-09-03
[ 5 ]
Proposed draft revision of the Handbook: Selection and use of precise frequency and time systems � Germany (Federal Republic of) 2020-08-24
[ 4 ]
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups) � Chairman, CCV 2020-07-14
[ 3 ]
Outcome of the sixteenth meeting of the Chairmen and Vice-Chairmen of the Radiocommunication Study Groups, Working Parties and other Subordinate Groups � Director, BR 2020-06-25
[ 2 ]
Contribution to Working Parties 7A, 7B, 7C and 7D on relevant agenda item of WRC-23 � Iran (Islamic Republic of) 2020-03-23
[ 1 ]
Documents to be carried over from the 2015-2019 study period � WP 7A 2019-10-31
Resultados :76 documentos
Resultados :� Anterior�-� 1 - 2
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� Coordenador de Web UIT-R
Actualizado el :�2023-07-21