Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-R : WP4B : Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-R�WP4B� C�

UIT-R�WP4B

Sistemas, interfaces radioel�ctricas, objetivos de calidad de funcionamiento y de disponibilidad para el SFS, SRS y SMS, con inclusi�n de aplicaciones basadas en el IP y el periodismo electr�nico por sat�lite

Resultados :205 documentos
Resultados :� Anterior�-� 1 - 2 - 3 - 4 - 5 �-�Siguiente Next
Contribuciones��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 155 ]
Liaison statement to Working Party 4B - Proposed revisions of SNG series Recommendations � WP 6B 2010-11-15
[ 154 ]
Liaison statement to Working Party 4B - Proposed editorial revision of Recommendation ITU-R BO.1130-4 - Systems for digital satellite broadcasting to vehicular, portable and fixed receivers in the bands allocated to BSS (sound) in the frequency range 1 400-2 700 MHz � WP 6B 2010-11-15
[ 153 ]
Liaison statement to Working Party 4B - Proposed treatment of BO series of Recommendations and Reports � WP 6B 2010-11-15
[ 152 ]
Liaison statement to Working Party 4C (for information to Working Parties 4A, 4B, 5A, 5D and 6B) - Preliminary draft new Report ITU-R M.[SAT-IMT-ADVANCED], titled "Vision and requirements for the satellite radio interface(S) of IMT-Advanced" � WP 6A 2010-11-05
[ 151 ]
Possible review of Recommendation ITU-R BO.600 - Standardized set of test conditions and measurement procedures for the subjective and objective determination of protection ratios for television in the terrestrial broadcasting and the broadcasting-satellite services � Australia 2010-10-11
[ 150 ]
Note from the Chairman of Study Group 4 to the Chairmen of Study Group 5 and Working Party 5D (copy to Working Parties 4B and 4C) - Satellite component of IMT � SG 4 2010-09-13
[ 149 ]
Liaison statement to Working Party 4B - Former Working Party 6S Questions jointly attributed to Working Parties 4A and 4B and not yet incorporates into Study Group 4 � WP 4A 2010-07-26
[ 148 ]
+Ann.1-11
Report on the twenty ninth meeting of Working Party 4B (Geneva, 5 - 9 July 2010) � Chairman, WP 4B 2010-07-08
[ 147 ]
(Rev.1)
Final List of participants - Working Party 4B (Geneva, 5-9 July 2010) � Director, BR 2010-07-09
[ 146 ]
Liaison statement to Working Parties 4A, 4B, 6A, 6B, 6C - Activities on satellite radio interface technology of IMT-ADVANCED � WP 4C 2010-07-08
[ 145 ]
List of documents issued � BR Study Group Department 2010-07-02
[ 144 ]
Liaison statement to Study Groups 4, 5, 6 and 7 and interested Working Parties - Protection of Radiocommunication services using digital modulation against interference caused by radiation from industrial, scientific and medical (ISM) equipment � WP 1A 2010-06-29
[ 143 ]
Preliminary draft new Report ITU-R S.[MULTI-CARRIER] - Multi-carrier based transmission techniques for satellite systems � Canada , Korea (Republic of) 46-3/4, 73-2/4 2010-06-25
[ 142 ]
Proposed liaison statement to Working Party 6B - Broadcasting of multimedia and data applications for mobile reception � France 2010-06-27
[ 141 ]
Comments on liaison statement from Working Party 6B on proposed revisions of SNG series Recommendations � Japan 2010-06-21
[ 140 ]
Preliminary draft new Report ITU-R S.[IPQOS-RPT] - Quality of service (QoS) architectures, mechanisms and their provisioning in IP-based satellite networks � Japan 263-1/4 2010-06-21
[ 139 ]
Draft new Recommendation ITU-R S.[MULTI-CARRIER] - Multi-carrier based transmission techniques for satellite systems � Canada , Korea (Republic of) 73-2/4, 46-3/4 2010-06-21
[ 138 ]
Proposed modification to working document - Terminology used for networks using both satellite and terrestrial links � Korea (Republic of) 2010-06-21
[ 137 ]
Liaison statement - New versions of the access network transport (ANT) standardization overview and work plan � ITU-T SG 15 2010-06-22
[ 136 ]
Liaison statement - Consent of Recommendation G.9971 "Requirements of transport functions in IP home networks" � ITU-T SG 15 2010-06-22
[ 135 ]
Liaison statement to Working Party 4B on the treatment of BO Series Recommendations (copy to Working Party 4A for information) - Response to comments on the proposed treatment of Recommendation of former Working Party 6S � WP 6B 2010-05-20
[ 134 ]
Liaison statement to Working Party 4B on the PDRR ITU-R BO.789-2 (copy to Working Party 4A for information) - Proposed revisions to the working document towards a preliminary draft revision of Recommendation ITU-R BO.789-2 - Service requirements for digital sound broadcasting to vehicular portable and fixed receivers for broadcasting-satellite service (sound) in the frequency... � WP 6B 23/6 2010-05-20
[ 133 ]
Liaison statement to Working Party 4B - Broadcasting of multimedia and data applications for mobile reception � WP 6B 2010-05-20
[ 132 ]
Liaison statement to Working Party 4B on proposed revisions of SNG Series Recommendations � WP 6B 2010-05-20
[ 131 ]
Liaison statement to Study Group 6 (copy to Working Party 4B) - Proposed definitions for "Integrated MSS system" and "Hybrid satellite/terrestrial system" � Chairman, CCV 2010-05-13
[ 130 ]
Liaison statement to Working Party 4A on WRC-12 Agenda item 1.13 (copy to Working Parties 3M, 4B, 5A, 5C, 6A and 7D for information) � WP 6B 2010-05-04
[ 129 ]
Liaison statement to Working Parties 5C and 6B for action and to Working Parties 3M, 4B, 5A, 6A and 7D for information on WRC-12 Agenda item 1.13 � WP 4A 2010-04-14
[ 128 ]
Liaison statement to Study Group 6 and Working Party 6A with copy to Working Party 4B for information - Response to comments on the proposed treatment of Recommendations of former Working Party 6S � WP 4A 2010-04-13
[ 127 ]
+Ann.1-18
Report on the twenty eighth meeting of Working Party 4B (Bangalore, 22-26 March 2010) � Chairman, WP 4B 2010-04-07
[ 126 ]
List of documents issued � BR Study Group Department 2010-03-26
[ 125 ]
Final list of participants (Working Party 4B, Bangalore, India, 22-26 March 2010) � Director, BR 2010-03-26
[ 124 ]
Working document towards a preliminary draft new Recommendation on cross layer based QoS provisioning in IP-based satellite terrestrial networks in the next generation network environment � United States of America 2010-03-15
[ 123 ]
Working document towards a preliminary draft revision of Recommendation ITU-R BO.789-2 - Service for digital sound broadcasting to vehicular portable and fixed receivers for broadcasting-satellite service (sound) in the frequency range 1 400-2 700 MHz � France 23/6 2010-03-15
[ 122 ]
Working document towards a preliminary draft new Recommendation - Impact of adaptive coding and modulation on availability objectives � Canada 73-2/4 2010-03-15
[ 121 ]
Preliminary draft new Recommendation ITU-R S.[MULTI-CARRIER] - Multi-carrier based transmission techniques for satellite systems � Canada 73-2/4 2010-03-15
[ 120 ]
Working document towards a preliminary draft new Report ITU-R M.[IP-MSS] - Quality of service performance of IP packet applications over operating or planned systems in the mobile-satellite service � France 287/4 2010-03-15
[ 119 ]
Preliminary draft new Recommendation ITU-R S.[MULTI-CARRIER] - Multi-carrier based transmission techniques for satellite systems � Korea (Republic of) 46/4 2010-03-05
[ 118 ]
Proposed modification to working document - Terminology used for networks using both satellite and terrestrial links � Korea (Republic of) 2010-03-05
[ 117 ]
Comments on the proposed treatment of recommendations of former Working Party 6S � BR Study Group Department 2010-03-03
[ 116 ]
Emergency and disaster relief telecommunications in Haiti � United States of America 2010-03-01
[ 115 ]
ITU/IDA Workshop on the efficient use of the spectrum/orbit resource (Singapore, 16-17 June 2010) � Director, BR 2010-03-01
[ 114 ]
Liaison statement on draft ITU-T Recommendation G.9971 (Ghntreq) "Requirements of transport functions in IP home network" � ITU-T SG 15 2010-01-26
[ 113 ]
Liaison statement to Working Party 4B - Study Group 4 SNG series of Recommendations � WP 6B 2009-12-08
[ 112 ]
Liaison statement - Response to comments from WP 4B about G.hntreq � ITU-T SG 15 2009-10-27
[ 111 ]
New versions of the Access Network Transport (ANT) Standardization Plan and Work Plan � ITU-T SG 15 2009-10-21
[ 110 ]
ABU views on WRC-12 Agenda items 1.4, 1.13, 1.19, 1.22, 1.25 � Asia-Pacific Broadcasting Union (ABU) 2009-09-29
[ 109 ]
+Ann.1-12
Report on the twenty seventh meeting of Working Party 4B - (Geneva, 7 - 14 September 2009) � Chairman, WP 4B 2009-09-14
[ 108 ]
Final List of Participants - Geneva, 7-11 September 2009 � Director, BR 2009-09-11
[ 107 ]
Liaison statement to Working Parties 4A and 4B - Draft new Recommendation ITU-R M.[MOBDIS] and draft new Report ITU-R M.[REP-MOBDIS] - Use of mobile-satellite service (MSS) in disater reponse and relief � WP 4C 2009-09-09
[ 106 ]
List of documents issued � BR Study Group Department 2009-09-04
Resultados :205 documentos
Resultados :� Anterior�-� 1 - 2 - 3 - 4 - 5 �-�Siguiente Next
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� Coordenador de Web UIT-R
Actualizado el :�2011-04-26