Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 179 ]
�
� |
Proposed of revision of Recommendation ITU-R 311-12 - Addition to formatted table for the phase function characteristics of vegetation effect
�
� |
Korea (Republic of)
� |
� |
2006-10-09 |
|
[ 178 ]
�
+Ann.1-14� |
Chairman's Report - Geneva, 28 Sep. - 6 Oct. 2006
�
� |
Chairman, WP 3M
� |
� |
2006-10-09 |
|
[ 177 ]
�
� |
Final List of Participants - Working Party 3M (Geneva, 28 September - 6 October 2006)
�
� |
Director, BR
� |
� |
2006-10-05 |
|
[ 176 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2006-09-27 |
|
[ 175 ]
�
� |
Test of methods for predicting the tail ofthe multipath fading distribution
�
� |
TELENOR AS
� |
204/3
� |
2006-09-21 |
|
[ 174 ]
�
� |
Updated handbook "Radiowave propagation information for designing terrestrial point-to-point links"
�
� |
TELENOR AS
� |
� |
2006-09-21 |
|
[ 173 ]
�
� |
Contribution to the propagation databanks - Measurements of rain event duration in Madrid
�
� |
Spain
� |
� |
2006-09-22 |
|
[ 172 ]
�
� |
Database to test prediction methods of slant path attenuation statistics
�
� |
Italy - ESA - France
� |
� |
2006-09-21 |
|
[ 171 ]
�
� |
An updated test variable for the assessment of attenuation statistical prediction methods
�
� |
France, Italy, ESA
� |
� |
2006-09-21 |
|
[ 170 ]
�
� |
Test variables relevant to the validation of statistical prediction methods
�
� |
Italy - ESA - France
� |
� |
2006-09-21 |
|
[ 169 ]
�
� |
Proposal for a new table in DBSG3 for statistics of instantaneous frequency scaling
�
� |
Italy-ESA-France
� |
� |
2006-09-21 |
|
[ 168 ]
�
� |
Proposal for a new table in DBSG3 for time diversity statistics
�
� |
Italy -ESA -France
� |
� |
2006-09-21 |
|
[ 167 ]
�
� |
A rain attenuation time series syntheser at Ku-, Ka- and Q/V-bands for slant paths
�
� |
France
,
ESA
,
Italy
� |
206/3, 201/3
� |
2006-09-21 |
|
[ 166 ]
�
� |
Contribution to the propagation data banks - Cloud cover measurements in Spain
�
� |
Spain
� |
� |
2006-09-20 |
|
[ 165 ]
�
� |
An evaluation of the proposal contained in Document 3M/82 to use global maps of ducting statistics to model �0 in Recommendation ITU-R P.452
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2006-09-19 |
|
[ 164 ]
�
� |
Information paper - Modelling multiple interference signals
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2006-09-20 |
|
[ 163 ]
�
� |
Testing of an amendment proposed in Document 3M/112 to the sub-model blending procedure of Recommendation ITU-R P.452-12
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2006-09-20 |
|
[ 162 ]
�
� |
Information document on using Recommendation ITU-R P.452 in the frequency range 30 MHz to 3 000 MHz: a candidate for a deterministic Point-To-Area model
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
203/3
� |
2006-09-19 |
|
[ 161 ]
�
� |
Information document on the comparison of two of the candidate Sub-Group 3K-1 deterministic point to area prediction methods with ITU-R P.452
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2006-09-20 |
|
[ 160 ]
�
� |
Information document - Work towards the development of a point-to-area propagation model for frequencies above 3 GHz
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
203/3
� |
2006-09-19 |
|
[ 159 ]
�
� |
Information paper: Investigation of a new fixed-link planning method based on joint signal-level probability distributions
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2006-09-19 |
|
[ 158 ]
�
� |
Draft modification to Recommendation ITU-R P.311-12 - Potential new Table III-3 - Joint signal-level probability distributions
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2006-09-20 |
|
[ 157 ]
�
� |
An evaluation of the proposal contained in Document 3M/112 to revise the blending in Recommendation ITU-R P.452
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
208/3
� |
2006-09-19 |
|
[ 156 ]
�
� |
Physical prediction model for unbalanced site diversity configurations
�
� |
Greece
� |
206/3
� |
2006-09-19 |
|
[ 155 ]
�
� |
Physical prediction model for differential rain - Attenuation distribution of converging terrestrial links
�
� |
Greece
� |
� |
2006-09-19 |
|
[ 154 ]
�
� |
Validation examples for prediction methods in Recommendation ITU-R P.530
�
� |
Greece
� |
204/3
� |
2006-09-19 |
|
[ 153 ]
�
� |
Contribution for the ITU-R data banks - Point rainfall rate and rain attenuation measurements on terrestrial links in the 23 GHz band
�
� |
Brazil (Federative Republic of)
� |
� |
2006-09-18 |
|
[ 152 ]
�
� |
Proposed modification to Recommendation ITU-R P.530-11 - Propagation data and prediction methods required for the design of terrestrial line-of-sight systems
�
� |
Brazil (Federative Republic of)
� |
204/3
� |
2006-09-18 |
|
[ 151 ]
�
� |
Statistics of duration of Slant-Path rain attenuation events measured in Brazil
�
� |
Brazil (Federative Republic of)
� |
206/3
� |
2006-09-18 |
|
[ 150 ]
�
� |
Contribution for the ITU-R data banks - Rainfall rate measurements in an equatorial region
�
� |
Brazil (Federative Republic of)
� |
201/3
� |
2006-09-18 |
|
[ 149 ]
�
� |
Real time measurements of visibility and signal transmission in FOG and HAZE conditions in FAR- MID- and NEAR-IR free space optical links
�
� |
Brazil (Federative Republic of)
� |
228/3
� |
2006-09-18 |
|
[ 148 ]
�
� |
Dynamic aspects of rainfall in equatorial Brazil
�
� |
Brazil (Federative Republic of)
� |
206/3
� |
2006-09-18 |
|
[ 147 ]
�
� |
Microsoft Excel implementation of the clear-air portion of Recommendation ITU-R P.452-12
�
� |
United States of America
� |
208/3
� |
2006-09-18 |
|
[ 146 ]
�
� |
Revision of Recommendation ITU-R P.1144-3 - Guide to the application of the propagation methods of Radiocommunication Study Group 3
�
� |
Chairman, SG 3
� |
� |
2006-09-18 |
|
[ 145 ]
�
� |
Contribution to ITU-R data banks - Statistics of rain attenuation and rain fade event duration
�
� |
Japan
� |
201/3
� |
2006-09-15 |
|
[ 144 ]
�
� |
Information related to Recommendation ITU-R P.530-11 - Characteristics of millimetre wave rain fade duration
�
� |
Japan
� |
204/3
� |
2006-09-15 |
|
[ 143 ]
�
� |
Recommendations to be brought to the attention of Working Party 3M
�
� |
BR Study Group Department
� |
� |
2006-09-12 |
|
[ 142 ]
�
� |
Liaison statement to Working Parties 3M and 3J regarding the use of local data and the global reference model in Recommendation ITU-R P.676-6
�
� |
WP 4-9S
� |
� |
2006-09-12 |
|
[ 141 ]
�
� |
Liaison statement to Working Party 3M - Application of Recommendation Itu-R P.1623 to the
estimation of outage intensity performance for satellite digital paths
�
� |
WP 4B
� |
201/3
� |
2006-09-08 |
|
[ 140 ]
�
� |
Liaison statement to WP 3M (copy to WP 3K for information) - Frequency-related matters for the future development of IMT-2000 and IMT-Advanced related to WRC-07 Agenda item 1.4 - Sharing study between IMT-Advanced systems and radars in the 2 700-2 900 MHz band and the 3 400-3 700 MHz band
�
� |
WP 8F
� |
� |
2006-09-08 |
|
[ 139 ]
�
� |
Calculation method of the multipath fading depth statistics on line-of-sight links
�
� |
Russian Federation
� |
� |
2006-09-04 |
|
[ 138 ]
�
� |
Proposed revision of Question ITU-R 226-2/3 - Ionospheric and tropospheric characteristics along satellite-to-satellite paths
�
� |
Chairman, WP 3L
� |
226/3
� |
2006-08-20 |
|
[ 137 ]
�
� |
Liaison statement to Working party 8F - Frequency-related matters for the future development of IMT-2000 and systems beyond IMT-2000 related to WRC-07 Agenda Item 1.4
�
� |
Chairman, WP 3M
� |
� |
2006-08-16 |
|
[ 136 ]
�
� |
Liaison statement to Working Party 8F - Frequency-related matters for the future development of IMT-2000 and systems beyond IMT-2000 related to WRC-07 Agenda Item 1.4
�
� |
Chairman, WP 3M
� |
� |
2006-08-18 |
|
[ 135 ]
�
� |
Liaison statement to WP's 3J, 3K and 3M future status of Question ITU-R 122/9
�
� |
WP 9A
� |
� |
2006-07-26 |
|
[ 134 ]
�
� |
Proposed modifications to Recommendation ITU-R P.618-8 - Propagation data and prediction methods required for the design of Earth-space telecommunication systems
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
206/3
� |
2006-07-14 |
|
[ 133 ]
�
� |
Liaison statement to Working Parties 3J and 3M, copy to Working Party 1A and ITU-T Study Group 15 - Fixed service applications using frequency bands above 3 000 GHz
�
� |
WP 9B
� |
� |
2006-07-24 |
|
[ 132 ]
�
� |
Liaison statement to Working Party 3M - Frequency-related matters for the future development
of IMT 2000 and systems beyond IMT-2000 related to WRC-07 Agenda item 1.4 - Sharing study between systems beyond IMT-2000 and radars in the ARNS and meteorological service in the 2 700-2 900 MHz band
�
� |
WP 8F
� |
� |
2006-06-19 |
|
[ 131 ]
�
� |
Liaison statement to Working Party 3M - Frequency-related matters for the future development
of IMT 2000 and systems beyond IMT-2000 related to WRC-07 Agenda item 1.4 - Sharing study between IMT-Advanced systems and radars in the 3 400-3 700 MHz band
�
� |
WP 8F
� |
� |
2006-06-19 |
|
[ 130 ]
�
� |
ITU-R Study Group 1 Question to be brought to the attention of Working Parties 3M, 4A, 6S, 7B, 7C and 8D
�
� |
BR Study Group Department
� |
� |
2006-05-02 |
Resultados :229 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):