Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 117 ]
�
� |
Modification to the working document towards a preliminary draft new Recommendation - Power line high data rate telecommunications systems
�
� |
NABA
� |
221/1
� |
2006-09-22 |
|
[ 116 ]
�
� |
Information for the effects of radio frequency (RF) lighting device noise on the performance of 802.11B wireless local area network (WLAN) in the 2.4 GHz ISM band
�
� |
Korea (Republic of)
� |
� |
2006-09-22 |
|
[ 115 ]
�
� |
Recommendation ITU-R SM.1056 - Limitation of radiation from industrial, scientific and medical (ISM) equipment
�
� |
Korea (Republic of)
� |
70/1
� |
2006-09-22 |
|
[ 114 ]
�
� |
Recommendation to be brought to the attention of WPs 1A and 6E
�
� |
BR Study Group Department
� |
� |
2006-09-21 |
|
[ 113 ]
�
� |
Recommendations to be brought to the attention of Working Party 1A
�
� |
BR Study Group Department
� |
� |
2006-09-20 |
|
[ 112 ]
�
(Rev.1)� |
Proposal of a new study Question
�
� |
Germany (Federal Republic of)
� |
� |
2006-09-20 |
|
[ 111 ]
�
� |
Liaison statement to Task Group 1/9 and Working Party 1A - Mathematical inconsistency when linking the FSS OoB domain mask of Annex 5 of Recommendation ITU-R SM.1541 and the FSS spurious emission limit of RR Appendix 3
�
� |
WP 4A
� |
� |
2006-09-11 |
|
[ 110 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R SM.1134
�
� |
Russian Federation
� |
� |
2006-07-25 |
|
[ 109 ]
�
� |
Overview of FM modulator interference to broadcast services
�
� |
North American Broadcasters Association
� |
32/6
� |
2006-08-08 |
|
[ 108 ]
�
� |
Liaison statement to Working Parties 3J and 3M, copy to Working Party 1A and ITU-T Study Group 15 - Fixed service applications using frequency bands above 3 000 GHz
�
� |
WP 9B
� |
� |
2006-07-24 |
|
[ 107 ]
�
� |
Liaison statement to WP's 1A, 1B, 4A, 4-9S, 6E, 6M, 6S, 7B, 7C, 7D, 8A, 8B, 8D and 8F and TG 1/9, and to JTG 6-8-9 - Revision of Recommendation ITU-R F.1336
�
� |
WP 9D
� |
� |
2006-07-19 |
|
[ 106 ]
�
� |
Liaison statement to Working Parties 1A and 1C - Working party 8B rapporteur and Co-Chairman of JRG-1A/1C/8B
�
� |
WP 8B
� |
� |
2006-05-01 |
|
[ 105 ]
�
� |
LS to WP 1A - Coordination of an Earth station in studies on frequency sharing and coordination criteria
�
� |
WP 8D
� |
� |
2006-03-17 |
|
[ 104 ]
�
� |
Liaison statement to WP 1A - Bands between 275 and 3 000 GHz, and above
�
� |
WP 9B
� |
� |
2005-12-22 |
|
[ 103 ]
�
� |
Liaison statement to WPs 1A, 1B, 4A, 6E, 6M, 6S, 7B, 7C, 7D, 8A, 8B, 8D and 8F and to TG 1/9 and to JTG 6-8-9 - Revision of Recommendation ITU-R F.1336
�
� |
WP 9D
� |
� |
2005-12-21 |
|
[ 102 ]
�
� |
Draft Liaison statement to WP 1A and TG 1/9 - Comments regarding the use of the OoB domain masks in Recommendation ITU-R SM.1541 within the compatibility analyses conducted within Task Group 1/9 (Agenda item 1.20)
�
� |
WP 4A
� |
� |
2005-12-09 |
|
[ 101 ]
�
� |
Response to liaison statement from Working Party 1A - Necessary bandwidth of standard frequency and time signals
�
� |
WP 7A
� |
� |
2005-11-22 |
|
[ 100 ]
�
� |
Liaison statement to Working Party 1A - Bands between 275 and 3 000 GHz
�
� |
WP 7D
� |
� |
2005-11-22 |
|
[ 99 ]
�
� |
Liaison statement to Working Party 1A - Impact of cable and power line telecommunications systems on radiocommunications systems operating in the LF, MF, HFand VHF bands below 80 MHz
�
� |
WP 7A
� |
� |
2005-11-22 |
|
[ 98 ]
�
� |
Liaison statement to Working Parties 1A and 9C and ITU-T Study Group 5 - Draft New Recommendation - Protection requirements for broadcasting systems operating in the LF, MF, HF and VHF bands below 80 MHz against the impact of power line telecommunication (PLT) systems
�
� |
WP 6E
� |
� |
2005-10-18 |
|
[ 97 ]
�
� |
Liaison statement to WPs 1A and 8B - Compatibility studies between aeronautical mobile telemetry systems and systems operating under primary radiocommunication services in 4 500-4 800 MHz and 5 925-6 700 MHz bands identified as candidates for further study
�
� |
WP 3M
� |
� |
2005-10-11 |
|
[ 96 ]
�
� |
Liaison statement to WP 1A - Response to the liaison statement concerning bands between 275 and 3 000 GHz
�
� |
WPs 3J and 3M
� |
� |
2005-10-11 |
|
[ 95 ]
�
+Ann.1-15� |
Chairman's report - Meeting 26-30 September 2005
�
� |
Chairman, WP 1A
� |
� |
2005-10-11 |
|
[ 94 ]
�
� |
Liaison statement to WPs 1A, 3J, 3K and 3M - Compatibility studies between aeronautical mobile telemetry systems and systems operating under primary radiocommunication services in 4 500-4 800 MHz and 5 925-6 700 MHz bands identified as candidates for further study
�
� |
WP 8B
� |
� |
2005-09-29 |
|
[ 93 ]
�
� |
Final List of Participants - Working Party 1A
�
� |
Director, BR
� |
� |
2005-09-29 |
|
[ 92 ]
�
� |
Liaison statement from ITU-D Study Group 2 to the next meeting of ITU-R Radiocommunication Advisory Group (RAG) and to ITU-R Study Group 1 Working Party 1A (31 October - 4 November 2005)
�
� |
ITU-D SG 2
� |
� |
2005-09-27 |
|
[ 91 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2005-09-23 |
|
[ 90 ]
�
� |
Text for revision of Recommendation ITU-R SM.337-4 - Frequency and distance separations
�
� |
Korea (Republic of)
� |
� |
2005-09-22 |
|
[ 89 ]
�
� |
Proposal of deletion of Question ITU-R Q.211/1 (1997)
�
� |
France
� |
� |
2005-09-16 |
|
[ 88 ]
�
� |
Proposal of Revision SM.1235 (1997)
�
� |
France
� |
� |
2005-09-16 |
|
[ 87 ]
�
� |
Proposal of suppression of Recommendation SM. 669-1 (1993)
�
� |
France
� |
� |
2005-09-16 |
|
[ 86 ]
�
� |
Proposed amendments of Recommendation ITU-R SM.328-10 - Spectra and bandwidth of emissions
�
� |
Korea (Republic of)
� |
76/1
� |
2005-09-19 |
|
[ 85 ]
�
� |
Proposal of activation of the SG 1 Group of Redaction
�
� |
SG 1 Rapporteur to the CCV
� |
� |
2005-09-19 |
|
[ 84 ]
�
� |
Impact of high-speed data rate telecommunication systems using electrical power lines on broadcasting receivers and other systems
�
� |
Brazil (Federative Republic of)
� |
� |
2005-09-20 |
|
[ 83 ]
�
� |
Draft revision to working document toward a preliminary draft Report on the consideration of the use of frequencies between 275 and 3 000 GHz
�
� |
United States of America
� |
� |
2005-09-20 |
|
[ 82 ]
�
� |
Energy problems and prevention of global warming (Question ITU-R 210/1)
�
� |
Japan Aerospace Exploration Agency (JAXA)
� |
210/1
� |
2005-09-16 |
|
[ 81 ]
�
� |
Proposal of the extension regardin gthe termination year of Question ITU-R 210/1 to 2010 from 2005 - A response to Question ITU-R 210/1 and interference analyses between SSPS in the ISM bands and existing radio services
�
� |
Japan Aerospace Exploration Agency (JAXA)
� |
210/1
� |
2005-09-16 |
|
[ 80 ]
�
� |
Liaison statement to Working Parties 1A, 4A and 8D - Comments regarding the use of the OOB domain masks in Recommendation ITU-R SM.1541 within the compatibility analyses conducted within Task Group 1/9 (Agenda item 1.20)
�
� |
TG 1/9
� |
� |
2005-09-19 |
|
[ 79 ]
�
� |
ITU-R SM. Series Recommendations under responsibility of WP 1A
�
� |
France
� |
� |
2005-08-02 |
|
[ 78 ]
�
� |
Questions assigned to Study Group 1 and corresponding ITU-R SM.series Recommendation in force
�
� |
France
� |
� |
2005-08-02 |
|
[ 77 ]
�
� |
Joint Rapporteur Group - Report of the Second Meeting, May 24-26, 2004
�
� |
JRG 1A-1C-8B
� |
� |
2005-07-28 |
|
[ 76 ]
�
� |
Proposed amendments to Recommendation ITU-R SM.328-10 - Spectra and bandwidth of emissions
�
� |
Russian Federation
� |
� |
2005-07-27 |
|
[ 75 ]
�
� |
Liaison statement to Working Parties 1A, 7D, 8A, 8B and 9D
�
� |
IPG
� |
� |
2005-07-22 |
|
[ 74 ]
�
� |
Liaison statement to Working Party 1A (Copy to study Group 7) - Bands above 275 GHz
�
� |
WP 8A
� |
� |
2005-05-16 |
|
[ 73 ]
�
� |
Liaison statement to Working Party 1A - Protection criteria for fixed service systems below 30 MHz from high data rate telecommunication systems using electricity power supply distribution wiring
�
� |
WP 9C
� |
221/1
� |
2005-05-16 |
|
[ 72 ]
�
� |
Liaison statement to Working Parties 1A, 1B, 4A, 6E, 6M, 6S, 7B, 7C, 7D, 8A, 8B, 8D and 8F and to Task Groups 1/8 and 1/9, and Joint Task Group 6-8-9 - Revision of Recommendation ITU-R F.1336
�
� |
WP 9D
� |
� |
2005-05-02 |
|
[ 71 ]
�
� |
Draft Revision of Recommendation ITU-R BS.1660-1 - Technical basis for planning of terrestrial digital sound broadcasting in the VHF band
�
� |
WP 6E
� |
56/6
� |
2005-04-29 |
|
[ 70 ]
�
� |
Liaison statement to Working Party 1A - Protection requirements of broadcasting systems against interference caused by wired telecommunication systems, using an electric power supply
�
� |
WP 6E
� |
32/6
� |
2005-04-21 |
|
[ 69 ]
�
� |
Liaison statement to WP 1A - Proposal of OoB domain emission limits for ISDB-T system to be included in Recommendation ITU-R SM.1541-1, Annex 6
�
� |
WP 6E
� |
� |
2005-04-12 |
|
[ 68 ]
�
� |
Liaison statement to WPs 1A, 3L and 6E - Impact of cable and power line telecommunications systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz
�
� |
WP 7D
� |
221/1
� |
2005-03-29 |
Resultados :167 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):