Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 848 ]
�
� |
Concepts and references of client/server/administrative contexts
�
� |
ZTE Corporation (China)
� |
Q14/15, Q12/15
� |
2023-11-07 |
|
[ 847 ]
�
� |
Updates to clause 15 of G.7702
�
� |
ZTE Corporation (China)
� |
Q14/15, Q12/15
� |
2023-11-07 |
|
[ 846 ]
�
� |
Inconsistent specification of server layer for IMP mapping in G.709 and G.798, and impacts on G.874
�
� |
Nokia Shanghai Bell Co. Ltd. (China)
,
Nokia USA (United States)
� |
Q14/15, Q11/15
� |
2023-11-07 |
|
[ 845 ]
�
(Rev.1)� |
Beyond-800G OTN
�
� |
Nokia USA (United States)
� |
Q12/15, Q11/15
� |
2023-11-07 |
|
[ 844 ]
�
(Rev.1)� |
Model for FlexO regeneration
�
� |
Nokia USA (United States)
� |
Q12/15, Q11/15
� |
2023-11-07 |
|
[ 843 ]
�
� |
Characteristic information for Ethernet to FlexO mapping
�
� |
Nokia USA (United States)
� |
Q12/15, Q11/15
� |
2023-11-07 |
|
[ 842 ]
�
� |
Comments on draft G.709 Amd 3 (TD233/P)
�
� |
Nokia USA (United States)
� |
Q11/15
� |
2023-11-07 |
|
[ 841 ]
�
� |
Discussion of general requirements of semi-active WDM system
�
� |
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
,
ZTE Corporation (China)
� |
Q2/15
� |
2023-11-07 |
|
[ 840 ]
�
� |
Updates to TAP binding states in G.7701
�
� |
ZTE Corporation (China)
� |
Q14/15, Q12/15
� |
2023-11-07 |
|
[ 839 ]
�
� |
Proposal to restructure the OPM description in G.807
�
� |
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
� |
Q12/15
� |
2023-11-07 |
|
[ 838 ]
�
� |
Media channel and Media subnetwork model
�
� |
ZTE Corporation (China)
� |
Q14/15
� |
2023-11-07 |
|
[ 837 ]
�
� |
Discussions on the scope of management and control Recommendations
�
� |
ZTE Corporation (China)
� |
Q14/15, Q12/15
� |
2023-11-07 |
|
[ 836 ]
�
� |
Comments on G.876 Data Dictionary
�
� |
ZTE Corporation (China)
� |
Q14/15
� |
2023-11-07 |
|
[ 835 ]
�
� |
Proposed use case of small cell xhaul over TDM-PON for G.Sup.PONLatency
�
� |
China Information Communication Technologies Group
� |
Q2/15
� |
2023-11-07 |
|
[ 834 ]
�
� |
Considerations of wavelength range of B400G DWDM applications
�
� |
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
� |
Q6/15
� |
2023-11-07 |
|
[ 833 ]
�
� |
Considerations of ring structure in metro network for coherent P2MP and P2P applications
�
� |
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
� |
Q6/15
� |
2023-11-07 |
|
[ 832 ]
�
� |
Baseline text of revised ITU-T G.695 for 4�100G PAM4 interfaces of OTN for short-reach applications
�
� |
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
� |
Q6/15
� |
2023-11-07 |
|
[ 831 ]
�
� |
Proposal to revise G.695 for 4�100G PAM4 interfaces of OTN for short-reach applications
�
� |
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
,
ZTE Corporation (China)
� |
Q6/15
� |
2023-11-07 |
|
[ 830 ]
�
� |
G.988: additions for OMCI secure mutual authentication
�
� |
Huawei Technologies Co., Ltd. (China)
,
Nokia Corporation (Finland)
� |
Q2/15
� |
2023-11-07 |
|
[ 829 ]
�
(Rev.1)� |
Considerations on SyncOAM standardization
�
R1 only adds Q14/15 as a related Question
� |
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
� |
Q14/15, Q13/15
� |
2023-11-07 |
|
[ 828 ]
�
� |
Proposed new work item on "Non-metallic flame-retardant optical cables for application in electrical power systems"
�
� |
Beijing University of Posts and Telecommunications (China)
,
Hengtong Optic-electric Co., Ltd. (China)
,
State Grid Corporation of China
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
� |
Q5/15
� |
2023-11-07 |
|
[ 827 ]
�
� |
G.988: additions for IEEE802.1X secure mutual authentication
�
� |
Huawei Technologies Co., Ltd. (China)
,
Nokia Corporation (Finland)
� |
Q2/15
� |
2023-11-07 |
|
[ 826 ]
�
(Rev.1)� |
Proposals for G.781 Annex B
�
R1 only adds Q14/15 as a related Question
� |
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
� |
Q14/15, Q13/15
� |
2023-11-07 |
|
[ 825 ]
�
� |
Comments on G.8312 Amendment 2
�
� |
ZTE Corporation (China)
� |
Q11/15
� |
2023-11-07 |
|
[ 824 ]
�
� |
Requirement of network-level management in transport network
�
� |
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q14/15
� |
2023-11-07 |
|
[ 823 ]
�
� |
Propose to start discussion on hollow core fibre technologies
�
� |
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Hengtong Optic-electric Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q5/15
� |
2023-11-07 |
|
[ 822 ]
�
� |
Proposals to the new drafted recommendation L.pcc
�
� |
China Information Communication Technologies Group
� |
Q7/15
� |
2023-11-07 |
|
[ 821 ]
�
� |
Proposals of detail revision to ITU-T G.978 and update A.1
�
� |
China Mobile Communications Co. Ltd.
,
China Unicom
,
Jiangsu Zhongtian Technology Co.,Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q8/15
� |
2023-11-07 |
|
[ 820 ]
�
� |
Considerations on future smart operating of optical access system
�
� |
China Telecommunications Corporation
� |
Q2/15
� |
2023-11-07 |
|
[ 819 ]
�
� |
Proposals to the revised recommendation ITU-T L.104
�
� |
China Information Communication Technologies Group
� |
Q5/15
� |
2023-11-07 |
|
[ 818 ]
�
� |
Appendix proposal of upstream physical layer overhead time for G.FIN-PHY
�
� |
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
� |
Q3/15
� |
2023-11-07 |
|
[ 817 ]
�
� |
Proposal of standardizing distributed optical fiber sensing (DOFS) schemes for integrating sensing and communication of optical networks.
�
� |
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q6/15
� |
2023-11-07 |
|
[ 816 ]
�
� |
Considerations of interface extension requirements in G.7701
�
� |
China Mobile Communications Co. Ltd.
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q14/15, Q12/15
� |
2023-11-07 |
|
[ 815 ]
�
� |
Proposal of initiating the revision of Recommendation L.361
�
� |
China Information Communication Technologies Group
,
China Unicom
,
Hengtong Optic-electric Co., Ltd. (China)
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q7/15
� |
2023-11-07 |
|
[ 814 ]
�
� |
Proposal of extended C and L band WDM for B400G WDM
�
� |
China Information Communication Technologies Group
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
� |
Q6/15
� |
2023-11-07 |
|
[ 813 ]
�
� |
Analysis of CBR services' bidirectional delay difference of differential protection in power grid communication network
�
� |
Ministry of Industry and Information Technology (MIIT) (China)
,
State Grid Corporation of China
� |
Q13/15, Q11/15
� |
2023-11-07 |
|
[ 812 ]
�
� |
Discussion of network infrastructure sharing from both technical and management perspective
�
� |
China Mobile Communications Co. Ltd.
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q7/15
� |
2023-11-07 |
|
[ 811 ]
�
� |
Proposals of management requirements for fgOTN
�
� |
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
� |
Q14/15
� |
2023-11-07 |
|
[ 810 ]
�
� |
Considerations on the advanced performance management in G.7710
�
� |
China Information Communication Technologies Group
� |
Q14/15
� |
2023-11-07 |
|
[ 809 ]
�
� |
New work item for G.7716 revision
�
� |
Bahrain Network (BNET)
,
China Information Communication Technologies Group
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q14/15
� |
2023-11-07 |
|
[ 808 ]
�
� |
Considerations on study next generation of Fronthaul and proper WDM solution
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
� |
Q6/15
� |
2023-11-07 |
|
[ 807 ]
�
� |
Proposals to add MTNP PM model in G.8350 Amd.1
�
� |
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q14/15
� |
2023-11-07 |
|
[ 806 ]
�
� |
Latest draft of chapter 9 of technical report "Optical fibres, cables and systems"
�
� |
MIIT
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
� |
Q7/15
� |
2023-11-07 |
|
[ 805 ]
�
� |
Proposals to update MTNP DM requirements and UML model in G.8350 Amd.1
�
� |
China Information Communication Technologies Group
� |
Q14/15
� |
2023-11-07 |
|
[ 804 ]
�
� |
Considerations on metro 400G interfaces
�
� |
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
� |
Q6/15
� |
2023-11-07 |
|
[ 803 ]
�
� |
Requirements of fgMTN crossing domain scenario
�
� |
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
� |
Q11/15
� |
2023-11-07 |
|
[ 802 ]
�
� |
G.fin-PHY: remote powering of G.fin SFU
�
� |
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q3/15
� |
2023-11-07 |
|
[ 801 ]
�
� |
Ubiquitous Precision Time (G.8271, G.8271.1)
�
� |
Calnex Solutions plc. (United Kingdom)
,
Huawei Technologies Co., Ltd. (China)
� |
Q13/15
� |
2023-11-07 |
|
[ 800 ]
�
� |
Propose to start a technical report on use case and network requirements of fiber to power distribution and substation
�
� |
Huawei Technologies Co., Ltd. (China)
,
State Grid Corporation of China
,
ZTE Corporation (China)
� |
Q3/15
� |
2023-11-07 |
|
[ 799 ]
�
� |
B400G transmitter quality metric based on transmitter constellation closure (TCC)
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q6/15
� |
2023-11-07 |
Results:291 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):