International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG11 : Meeting�2024-02-07�: Temporary Documents� Recently posted�-� Search Meeting Documents
ITU-T�SG11� TD-WP1�(2024-02-07)�

ITU-T�SG11

Protocols and test specifications

Study Period 2022

Meeting� from 2024-02-07 to 2024-02-07

held in E-Meeting

Other Meetings : 2024-05-01� [ 2024-02-07 ]� 2023-10-102023-05-102022-12-072022-07-06

Results:73 total items.
Result page:� Previous�-� 1 - 2
Temporary Documents �(WP1) ��Documents / Contributions

Number
Title Source AI/Question
Date
[ 113-WP1 ]
LS on the consent of draft new Recommendation ITU-T Y.3061 (ex Y.AN-Arch-fw) "Autonomous Networks - Architecture Framework" [from ITU-T SG13] � ITU-T Study Group 13 Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2023-11-30
[ 112-WP1 ]
LS on SG13 activity ad-hoc on "Future ICT Evolution for emerging Web Era" [from ITU-T SG13] � ITU-T Study Group 13 Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2023-11-30
[ 111-WP1 ]
LS on work progress on Quantum Key Distribution (QKD) network in SG13 (as of November 2023) [from ITU-T SG13] � ITU-T Study Group 13 Q2/11 2023-11-30
[ 110-WP1 ]
LS/r on the new work item ITU-T Q.TSCA which defines procedure for issuing digital certificates for signalling security (SG11-LS62) [from ITU-T SG2] � ITU-T Study Group 2 Q2/11 2023-11-29
[ 109-WP1 ]
LS/r on Coordination for Identity Management (SG17-LS68) [from ITU-T SG2] � ITU-T Study Group 2 Q2/11 2023-11-29
[ 108-WP1 ]
LS/r on Proposed new draft Recommendation "Signalling requirements and procedures for bypassing network elements of IMS" (SG11-LS43) [from 3GPP SA WG2] � 3GPP SA WG2 Q3/11 2023-11-29
[ 107-WP1 ]
(Rev.1)
Draft Report of Working Party 1/11 "Signalling requirements and protocols for emerging telecommunications networks" (virtual, 7 February 2024) � Chair WP1/11 Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2023-11-23
[ 106-WP1 ]
Draft Report of interim RGM meeting Q5/11 "Signalling requirements and protocols for border network gateway in the context of network virtualization and intelligentization" (virtual, 29 January - 6 February 2024) � Rapporteur Q5/11 Q5/11 2023-11-23
[ 105-WP1 ]
(Rev.1)
Draft Report of interim RGM meeting Q4/11 "Protocols for control, management and orchestration of network resources" (virtual, 29 January - 6 February 2024) � Rapporteur Q4/11 Q4/11 2023-11-23
[ 104-WP1 ]
Draft Report of interim RGM meeting Q3/11 "Signalling requirements and protocols for emergency telecommunications" (virtual, 29 January - 6 February 2024) � Rapporteur Q3/11 Q3/11 2023-11-23
[ 103-WP1 ]
Draft Report of interim RGM meeting Q2/11 "Signalling requirements and protocols for services and applications in telecommunication environments" (virtual, 29 January - 6 February 2024) � Rapporteur Q2/11 Q2/11 2023-11-23
[ 102-WP1 ]
(Rev.1)
Draft Report of interim RGM meeting Q1/11 "Signalling and protocol architectures for telecommunication networks and guidelines for implementations" (virtual, 29 January - 6 February 2024) � Rapporteur Q1/11 Q1/11 2023-11-23
[ 101-WP1 ]
RGM and WPs TD templates (virtual, 29 January - 7 February 2024) � TSB Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2023-11-23
[ 100-WP1 ]
New work items (WP1/11 meeting, virtual, 7 February 2024) � TSB Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2023-11-23
[ 99-WP1 ]
List of supplements proposed for agreement (WP1/11 meeting, virtual, 7 February 2024) � TSB Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2023-11-23
[ 98-WP1 ]
(Rev.1)
List of outgoing liaison statements of WP1/11 (virtual, 7 February 2024) � TSB Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2023-11-23
[ 97-WP1 ]
List of incoming liaison statements for WP1/11 (virtual, 7 February 2024) � TSB Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2023-11-23
[ 96-WP1 ]
Guidelines for remote participation at the interim Rapporteur Group Meetings and interim WP1/11, WP2/11, WP3/11 and WP4/11 meetings, (virtual, 29 January - 7 February 2024) � TSB Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2023-11-23
[ 95-WP1 ]
Meeting facilities and electronic working methods (interim Rapporteur Group Meetings and interim WP1/11, WP2/11, WP3/11 and WP4/11 meetings, virtual, 29 January - 7 February 2024) � TSB Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2023-11-23
[ 94-WP1 ]
WP1/11 leadership, Rapporteurs, Associate Rapporteurs and Acting Rapporteurs of related Questions � TSB Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2023-11-23
[ 93-WP1 ]
(Rev.1)
List of participants of Interim RGM and WP1/11, WP2/11, WP3/11 and WP4/11 (virtual, 29 January - 7 February 2024) � TSB Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2023-11-23
[ 92-WP1 ]
(Rev.1-10)
Draft time plan of interim Rapporteur Group Meetings and interim WP1/11, WP2/11, WP3/11 and WP4/11 meetings (virtual, 29 January - 7 February 2024) � TSB Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2023-11-10
[ 91-WP1 ]
(Rev.1)
Draft agenda for Working Party 1/11 "Signalling requirements and protocols for emerging telecommunications networks" (virtual, 7 February 2024) � WP1/11 Chair Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2023-11-10
Results:73 total items.
Result page:� Previous�-� 1 - 2
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-26