Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2163 ]
�
(Rev.1)� |
G.8272.1 Holdover
�
� |
ADVA Optical Networking
,
Microsemi Corp
� |
Q13/15
� |
2016-09-06 |
|
[ 2162 ]
�
� |
G.fast: identifying and completing missing elements in the SRA procedure in G.9701 Corrigendum 3
�
� |
Sckipio Technologies S.I. Ltd.
� |
Q4/15
� |
2016-09-06 |
|
[ 2161 ]
�
� |
G.8271.2 Burst limit
�
� |
Nokia Solutions and Networks GmbH & Co. KG
� |
Q13/15
� |
2016-09-06 |
|
[ 2160 ]
�
� |
G.fast: Clarification on bitswap constraints
�
� |
Broadcom Corporation
� |
Q4/15
� |
2016-09-06 |
|
[ 2159 ]
�
� |
G.ploam: Corrigendum item to G.997.2
�
� |
Broadcom Corporation
� |
Q4/15
� |
2016-09-06 |
|
[ 2158 ]
�
� |
Document withdrawn
�
� |
N/A
� |
� |
2016-09-06 |
|
[ 2157 ]
�
� |
Upstream dual-rate coexistence PMD reference design examples for TWDM PON
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2016-09-06 |
|
[ 2156 ]
�
+Corr.1� |
Proposal to modify procedural agreement between Q11 and Q6 regarding strong HD-FEC
�
� |
Deutsche Telekom AG
,
Acacia
,
Alcatel-Lucent USA
,
China Unicom
,
Cisco
,
Comcast
,
Coriant
,
Fujitsu
,
Inphi
,
Juniper
,
LM Ericsson
,
NTT
,
Orange
,
Telecom Italia
,
Telefon AB
,
Telefonica
� |
Q6/15, Q11/15
� |
2016-09-06 |
|
[ 2155 ]
�
� |
G.ploam: Working text to support Annex T of G.9701
�
� |
ADTRAN
,
AT&T, Inc.
,
Sckipio Technologies S.I. Ltd.
� |
Q4/15
� |
2016-09-06 |
|
[ 2154 ]
�
� |
G.fast: Working text for Annex T
�
� |
ADTRAN
,
AT&T, Inc.
,
Sckipio Technologies S.I. Ltd.
� |
Q4/15
� |
2016-09-06 |
|
[ 2153 ]
�
� |
G.fast: Update of working for Annex S (NT software upgrade)
�
� |
ADTRAN
,
AT&T, Inc.
,
Sckipio Technologies S.I. Ltd.
� |
Q4/15
� |
2016-09-06 |
|
[ 2152 ]
�
� |
G.fast: Update of coax cable configurations working text for Annex X
�
� |
ADTRAN
,
AT&T, Inc.
,
Sckipio Technologies S.I. Ltd.
� |
Q4/15
� |
2016-09-06 |
|
[ 2151 ]
�
� |
G.fast: Wideband transmit power for profile 212a
�
� |
Intel Corporation
,
Sckipio Technologies S.I. Ltd.
� |
Q4/15
� |
2016-09-06 |
|
[ 2150 ]
�
(Rev.1)� |
Prysmian Group view on consent of ITU-T Recs. G.652 and G.657
�
� |
Prysmian SpA
� |
Q5/15
� |
2016-09-06 |
|
[ 2149 ]
�
� |
Comment to the Link Design Analysis for cabled fibre optic attenuation
�
� |
Prysmian SpA
� |
Q5/15
� |
2016-09-06 |
|
[ 2148 ]
�
(Rev.1-2)� |
Staircase FEC as a candidate for Standard OTU4 MV IaDI Metro application
�
� |
Deutsche Telekom AG
,
Acacia
,
China Unicom
,
Cisco
,
Comcast
,
Coriant
,
Fujitsu
,
Inphi
,
Juniper
,
LM Ericsson
,
NTT
,
Orange
,
Telecom Italia
,
Telefon AB
,
Telefonica
� |
Q6/15, Q11/15
� |
2016-09-06 |
|
[ 2147 ]
�
� |
Comment about the length dependence of cut-off wavelength and impacts on system performance
�
� |
Prysmian SpA
� |
Q5/15
� |
2016-09-06 |
|
[ 2146 ]
�
(Rev.1)� |
G.fast: A framework for seamless reconfiguration
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
,
Intel Corporation
� |
Q4/15
� |
2016-09-06 |
|
[ 2145 ]
�
� |
G.fast: communicating DTA_enable and DTA_max_Mds from the FTU-O to the FTU-R for DTA operation
�
� |
Sckipio Technologies S.I. Ltd.
� |
Q4/15
� |
2016-09-06 |
|
[ 2144 ]
�
� |
Test of EVM scripts for draft revised G.698.2
�
� |
Huawei Technologies Co., Ltd.
� |
Q6/15
� |
2016-09-06 |
|
[ 2143 ]
�
� |
Considerations on optical transceiver module for G.metro
�
� |
China Unicom
,
Huawei Technologies Co., Ltd.
� |
Q6/15
� |
2016-09-06 |
|
[ 2142 ]
�
� |
Revision of the description of cross-polarization modulation
�
� |
Huawei Technologies Co., Ltd.
,
Orange
� |
Q7/15
� |
2016-09-06 |
|
[ 2141 ]
�
� |
Comments on Table 9-1/G.8021
�
� |
NEC Corporation
,
Huawei Technologies Co., Ltd.
� |
Q9/15, Q14/15, Q10/15
� |
2016-09-06 |
|
[ 2140 ]
�
� |
Comments to the latest draft of G.Sup-ELPDNI
�
� |
Electronics and Telecommunications Research Institute (ETRI)
,
Huawei Technologies Co., Ltd.
� |
Q9/15
� |
2016-09-06 |
|
[ 2139 ]
�
� |
Use of bridges and selectors in the latest draft of G.Sup-ELPDNI
�
� |
Electronics and Telecommunications Research Institute (ETRI)
,
Huawei Technologies Co., Ltd.
� |
Q9/15
� |
2016-09-06 |
|
[ 2138 ]
�
� |
Draft Recommendation: Generic architecture of home networks for energy management
�
� |
Fujitsu Limited
,
Mitsubishi Electric Corporation
,
Oki Electric Industry Company Ltd. (OKI)
,
Panasonic Corporation
� |
Q15/15
� |
2016-09-06 |
|
[ 2137 ]
�
� |
Rate Compensation block Alignment in 400 GBASE-R
�
� |
Xilinx Incorporation
� |
Q11/15
� |
2016-09-06 |
|
[ 2136 ]
�
� |
Evolution of G.hn: Interoperability with current bandplans - Update
�
� |
Marvell Semiconductor Inc.
� |
Q18/15
� |
2016-09-06 |
|
[ 2135 ]
�
� |
G.fast: a corrigendum item for correcting some typos in clause 11.2.2.13 ("PMD test parameter read commands and responses") of G.9701
�
� |
Sckipio Technologies S.I. Ltd.
� |
Q4/15
� |
2016-09-06 |
|
[ 2134 ]
�
� |
Comments on Draft New Recommendation G.808
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/15
� |
2016-09-06 |
|
[ 2133 ]
�
� |
Evolution of G.hn: Proposal for new bandplans
�
� |
Marvell Semiconductor Inc.
� |
Q18/15
� |
2016-09-06 |
|
[ 2132 ]
�
� |
Comments on Draft Amendment 1 to Recommendation G.8032 (08/2015)
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/15
� |
2016-09-06 |
|
[ 2131 ]
�
� |
Evolution of G.hn: Discussion on bandplan combinations
�
� |
Marvell Semiconductor Inc.
� |
Q18/15
� |
2016-09-06 |
|
[ 2130 ]
�
� |
G.hn: Centralized coordination - Proposal of measurement process
�
� |
Marvell Semiconductor Inc.
� |
Q18/15
� |
2016-09-06 |
|
[ 2129 ]
�
� |
G.hn- Implementation of the LCMP data model
�
� |
Marvell Semiconductor Inc.
� |
Q18/15
� |
2016-09-06 |
|
[ 2128 ]
�
� |
Proposal of framework of G.RoF Recommendation
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q2/15
� |
2016-09-06 |
|
[ 2127 ]
�
� |
Proposal to add a new information model controller component to G.cca
�
� |
ZTE Corporation
� |
Q14/15, Q12/15
� |
2016-09-06 |
|
[ 2126 ]
�
� |
Proposal to enhance the description of the NOSM in G.872
�
� |
ZTE Corporation
� |
Q6/15, Q12/15
� |
2016-09-06 |
|
[ 2125 ]
�
� |
G.fast: 212 MHz profile considerations
�
� |
Telecom Italia S.p.A.
� |
Q4/15
� |
2016-09-06 |
|
[ 2124 ]
�
� |
G.fast: proposal to add a 159MHz profile to the main body of G.9701
�
� |
Sckipio Technologies S.I. Ltd.
� |
Q4/15
� |
2016-09-06 |
|
[ 2123 ]
�
� |
Proposal to add more details on ToD (GNSS Status Message Payload) interface definition
�
� |
Orange
� |
Q13/15
� |
2016-09-06 |
|
[ 2122 ]
�
� |
Informational contribution on ionospheric effects during PRTC measurement
�
� |
Orange
� |
Q13/15
� |
2016-09-06 |
|
[ 2121 ]
�
� |
High Performance atomic clock stability from the perspective of ePRTC.
�
� |
Orange
� |
Q13/15
� |
2016-09-06 |
|
[ 2120 ]
�
� |
T-BC requirements for the case where syncE input is lost.
�
� |
Orange
� |
Q13/15
� |
2016-09-06 |
|
[ 2119 ]
�
� |
3GPP recent work on network assisted synchronization (NAS) for cellular networks.
�
� |
Orange
� |
Q13/15
� |
2016-09-06 |
|
[ 2118 ]
�
� |
Additional table for phase/time requirements for cluster-based synchronization (G.8271).
�
� |
ADVA Optical Networking
,
Orange
� |
Q13/15
� |
2016-09-06 |
|
[ 2117 ]
�
� |
Interoperability between EEC and eEEC (G.8262.1 and G.8262 clocks).
�
� |
Huawei Technologies Co., Ltd.
,
Orange
� |
Q13/15
� |
2016-09-06 |
|
[ 2116 ]
�
� |
HRMs for cluster-based synchronization (G.8271.1).
�
� |
Huawei Technologies Co., Ltd.
,
Orange
� |
Q13/15
� |
2016-09-06 |
|
[ 2115 ]
�
� |
Use case for G.8271.2
�
� |
Orange
� |
Q13/15
� |
2016-09-06 |
|
[ 2114 ]
�
� |
Preliminary fronthaul requirements for 5G.
�
� |
Orange
� |
Q13/15
� |
2016-09-06 |
Results:2210 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):