Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1110 ]
�
� |
G.9700 Out of band noise requirements
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q4/15
� |
2014-11-11 |
|
[ 1109 ]
�
� |
Comment on Intra-OLT duplex modes of type B protection in G.989.1Amd1
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2014-11-11 |
|
[ 1108 ]
�
� |
G.VDSL: Immunity of VDSL2 to out of band interference from G.fast
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q4/15
� |
2014-11-11 |
|
[ 1107 ]
�
� |
G.8275.1 & G.8275.2 : Mapping between ClockClass and Quality level
�
� |
ADVA Optical Networking
� |
Q13/15
� |
2014-11-11 |
|
[ 1106 ]
�
� |
G.8275.2: Requirement for an Accurate T3 Value
�
� |
ADVA Optical Networking
,
Calnex Solutions Limited
� |
Q13/15
� |
2014-11-11 |
|
[ 1105 ]
�
� |
G.8275.2 : A-BMCA
�
� |
ADVA Optical Networking
� |
Q13/15
� |
2014-11-11 |
|
[ 1103 ]
�
� |
G.8272: PRTC Testing using GNSS Simulators
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2014-11-11 |
|
[ 1102 ]
�
� |
8271.2 : HRM & PDV Network Limits for Partial Timing Support
�
� |
ADVA Optical Networking
� |
Q13/15
� |
2014-11-11 |
|
[ 1101 ]
�
� |
G.hn: Unloaded Supported sub-carriers LFSR seeds
�
� |
Marvell Semiconductor Inc.
� |
Q18/15
� |
2014-11-11 |
|
[ 1100 ]
�
� |
Filter Architectures for wavelength-filtered ODN
�
� |
ADVA Optical Networking
,
Coriant GmbH & Co. KG
� |
Q2/15
� |
2014-11-11 |
|
[ 1099 ]
�
� |
G.hs, G.fast: Handshake tones for G.fast
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q4/15
� |
2014-11-11 |
|
[ 1098 ]
�
� |
G.989.3 CT resilience and PtP ONU silent start
�
� |
Vodafone Group Services Ltd.
� |
Q2/15
� |
2014-11-11 |
|
[ 1097 ]
�
� |
G.hn: Alignment of G.9963 to the latest changes in G.9961
�
� |
Marvell Semiconductor Inc.
� |
Q18/15
� |
2014-11-11 |
|
[ 1096 ]
�
� |
G.hn: Update of the versioning and capabilities exchange mechanism
�
� |
Marvell Semiconductor Inc.
� |
Q18/15
� |
2014-11-11 |
|
[ 1095 ]
�
� |
G.9979 homework 2: Test vectors
�
� |
Marvell Semiconductor Inc.
� |
Q18/15
� |
2014-11-11 |
|
[ 1094 ]
�
� |
G.9979 LCC homework 1
�
� |
Marvell Semiconductor Inc.
� |
Q18/15
� |
2014-11-11 |
|
[ 1093 ]
�
� |
Request to consent OTUCn/ODUCn specification
�
No file provided
� |
Deutsche Telekom AG Standardization
� |
Q11/15
� |
2014-11-11 |
|
[ 1092 ]
�
� |
Proposal for simplified B100G interfaces of packet switches
�
No file provided
� |
Deutsche Telekom AG Standardization
� |
Q11/15
� |
2014-11-11 |
|
[ 1091 ]
�
� |
Proposed Annex A of Rec. A.1 for optical fibre cables for direct surface application with its Draft ITU-T Recommendation
�
� |
Global Plan Inc.
� |
Q16/15
� |
2014-11-11 |
|
[ 1090 ]
�
� |
Withdrawn
�
Duplicate of C-1091
� |
N/A
� |
� |
2014-11-11 |
|
[ 1089 ]
�
� |
FEC for B100G IrDI
�
� |
Applied Micro Circuits Corporation (AMCC)
� |
Q11/15
� |
2014-11-11 |
|
[ 1088 ]
�
� |
Transparent transport for PtP WDM to meet mobile fronthaul jitter requirements
�
� |
ADVA Optical Networking
,
Coriant GmbH & Co. KG
� |
Q2/15
� |
2014-11-11 |
|
[ 1087 ]
�
� |
Performance monitoring, supervision and defects management for PtP WDM
�
� |
ADVA Optical Networking
,
Coriant GmbH & Co. KG
� |
Q2/15
� |
2014-11-11 |
|
[ 1086 ]
�
� |
Wavelength refreshing for PtP WDM
�
� |
ADVA Optical Networking
,
Coriant GmbH & Co. KG
� |
Q2/15
� |
2014-11-11 |
|
[ 1085 ]
�
� |
G.989.3 PSBu Preamble Lengths
�
� |
Vodafone Group Services Ltd.
� |
Q2/15
� |
2014-11-11 |
|
[ 1084 ]
�
� |
Preliminary results on MPI measurements on commercial bend insensitive fibres and patch cords and considerations related to practical applications in the network
�
� |
Telecom Italia S.p.A.
� |
Q7/15, Q6/15, Q5/15
� |
2014-11-11 |
|
[ 1083 ]
�
� |
Reduced-Power-Budget Classes for NG-PON2 for filtered ODN
�
� |
ADVA Optical Networking
,
Coriant GmbH & Co. KG
� |
Q2/15
� |
2014-11-11 |
|
[ 1082 ]
�
� |
Simulations on reliability of unidirectional OTDR acceptance limits for splices
�
� |
Telecom Italia S.p.A.
� |
Q5/15
� |
2014-11-11 |
|
[ 1081 ]
�
� |
Discussion on specifying pilot tone related parameters at reference point SS
�
� |
ADVA Optical Networking
,
China Mobile Communications Corporation
,
China Unicom
,
Huawei Technologies Co. Ltd.
� |
Q6/15
� |
2014-11-11 |
|
[ 1080 ]
�
� |
Proposal for proceeding with the revision on G.697
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q6/15
� |
2014-11-11 |
|
[ 1079 ]
�
� |
Considerations on control information communications from HEE to TEE
�
� |
China Unicom
,
Huawei Technologies Co. Ltd.
� |
Q6/15
� |
2014-11-11 |
|
[ 1078 ]
�
� |
G.8262: Option II Wander Transfer
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2014-11-11 |
|
[ 1077 ]
�
� |
Clarification regarding G.8121 series Study Point 12
�
� |
Cisco Systems, Inc.
� |
Q14/15, Q10/15
� |
2014-11-11 |
|
[ 1076 ]
�
� |
Thoughts on the separation of resource database from control components
�
� |
Huawei Technologies Co. Ltd.
� |
Q14/15, Q12/15
� |
2014-11-11 |
|
[ 1075 ]
�
� |
Correction to G.8260, Figure 9
�
� |
Calnex Solutions Limited
,
China Unicom
� |
Q13/15
� |
2014-11-11 |
|
[ 1074 ]
�
� |
Clarifications for G.8121 series Study Point 10
�
� |
Cisco Systems, Inc.
� |
Q14/15, Q10/15
� |
2014-11-11 |
|
[ 1073 ]
�
� |
Appendix to Recommendation ITU-T L.64, "Central Office and Data Centre Experience: Physical Layer Management system for the management of connectivity within a telecommunications network"
�
� |
Tyco Electronics Raychem bvba
� |
Q17/15, Q16/15
� |
2014-11-11 |
|
[ 1072 ]
�
� |
Editorial Issues in Gsup.ethpm
�
� |
Cisco Systems, Inc.
� |
Q14/15, Q10/15
� |
2014-11-11 |
|
[ 1071 ]
�
� |
Additional content for Gsup.ethpm
�
� |
Cisco Systems, Inc.
� |
Q14/15, Q10/15
� |
2014-11-11 |
|
[ 1070 ]
�
� |
Structure of Gsup.ethpm
�
� |
Cisco Systems, Inc.
� |
Q14/15, Q10/15
� |
2014-11-11 |
|
[ 1069 ]
�
� |
Clarifications on Expected Defects in G.8021
�
� |
Cisco Systems, Inc.
� |
Q10/15
� |
2014-11-11 |
|
[ 1068 ]
�
� |
Clarifications on Bandwidth Notifications in G.8021
�
� |
Cisco Systems, Inc.
� |
Q10/15
� |
2014-11-11 |
|
[ 1067 ]
�
� |
Editorial corrections in G.8013 clause 2
�
� |
Cisco Systems, Inc.
� |
Q10/15
� |
2014-11-11 |
|
[ 1066 ]
�
� |
Use of MCC for EDM PDUs
�
� |
Cisco Systems, Inc.
� |
Q10/15
� |
2014-11-11 |
|
[ 1065 ]
�
� |
Adding reference to MEF46 in G.8013
�
� |
Cisco Systems, Inc.
� |
Q10/15
� |
2014-11-11 |
|
[ 1064 ]
�
� |
Status of references to MEF IAs in G.8011
�
� |
Cisco Systems, Inc.
� |
Q10/15
� |
2014-11-11 |
|
[ 1063 ]
�
� |
G8266:T-GM Scope Defintion
�
� |
Orange
� |
Q13/15
� |
2014-11-11 |
|
[ 1062 ]
�
(Rev.1)� |
Considerations about Terminology in G.mdsp
�
� |
Electronics and Telecommunications Research Institute (ETRI)
,
Huawei Technologies Co. Ltd.
,
Telecom Italia S.p.A.
� |
Q9/15
� |
2014-11-11 |
|
[ 1061 ]
�
� |
Considerations about Network Objectives in G.mdsp
�
� |
Electronics and Telecommunications Research Institute (ETRI)
,
Huawei Technologies Co. Ltd.
,
Telecom Italia S.p.A.
� |
Q9/15
� |
2014-11-11 |
|
[ 1060 ]
�
� |
Editorial Comments to the current text for BNM in draft G.8021
�
� |
Huawei Technologies Co. Ltd.
� |
Q10/15
� |
2014-11-11 |
Results:382 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):