Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 727 ]
�
� |
PTP GM performance specification in ITU-T
�
� |
Iometrix, Inc.
,
Orange
� |
Q13/15
� |
2014-03-11 |
|
[ 726 ]
�
� |
Notion of Quality Level of local clock in G.8265.1 during master selection
�
� |
Iometrix, Inc.
� |
Q13/15
� |
2014-03-11 |
|
[ 725 ]
�
� |
Review of G.8275.1 Latest Draft
�
� |
Iometrix, Inc.
� |
Q13/15
� |
2014-03-11 |
|
[ 724 ]
�
� |
Use of G.8265.1 telecom profile for Assisted Partial Timing Support
�
� |
Iometrix, Inc.
� |
Q13/15
� |
2014-03-11 |
|
[ 723 ]
�
� |
Considerations on independence of each single protection switching in G.MDSP
�
� |
China Unicom
� |
Q9/15
� |
2014-03-11 |
|
[ 722 ]
�
� |
Clarification of PTP unicast communication for G.8275.1, G.8275.2 and G.8265.1 - modification of frequencyTraceable flag, timeTraceable flag, and clockClass
�
� |
Iometrix, Inc.
� |
Q13/15
� |
2014-03-11 |
|
[ 721 ]
�
� |
Comments on methods 1 and 2 for PDV tolerance testing in G.8263
�
� |
Iometrix, Inc.
� |
Q13/15
� |
2014-03-11 |
|
[ 720 ]
�
� |
Clarification of PTP unicast communication for G.8275.2 and G.8265.1 - use of all 1's for targetPortIdentity
�
� |
Iometrix, Inc.
� |
Q13/15
� |
2014-03-11 |
|
[ 719 ]
�
� |
Proposal to update the definition of terms for submarine cable system in G.972
�
� |
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
� |
Q8/15
� |
2014-03-11 |
|
[ 718 ]
�
� |
Proposal to update G.977 considering ROADM and 100G application
�
� |
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
� |
Q8/15
� |
2014-03-11 |
|
[ 717 ]
�
� |
Proposal to update G.973.1 considering 100G application
�
� |
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
� |
Q8/15
� |
2014-03-11 |
|
[ 716 ]
�
� |
Proposal to add XPolM effect in G.697
�
� |
China Unicom
,
ZTE Corporation
� |
Q6/15
� |
2014-03-11 |
|
[ 715 ]
�
� |
MFD distribution of G.652 fibre in China Unicom
�
� |
China Unicom
� |
Q5/15
� |
2014-03-11 |
|
[ 714 ]
�
(Rev.1)� |
ONU power levelling for NG-PON2: TC layer issues
�
� |
Electronics and Telecommunications Research Institute (ETRI)
,
Ericsson-LG
,
SK Telecom
� |
Q2/15
� |
2014-03-11 |
|
[ 713 ]
�
� |
Proposed parameters for WDM1r in G.984.5
�
� |
China Telecommunications Corporation
,
ZTE Corporation
� |
Q2/15
� |
2014-03-11 |
|
[ 712 ]
�
� |
Experimental results of EVM related parameters of QPSK transmitter
�
� |
China Unicom
,
ZTE Corporation
� |
Q6/15
� |
2014-03-11 |
|
[ 711 ]
�
� |
Proposal for Preconfigured Backup Channel Attributes
�
� |
China Telecommunications Corporation
,
ZTE Corporation
� |
Q2/15
� |
2014-03-11 |
|
[ 710 ]
�
� |
Considerations about Addition of the Generic DSP Demodulation Flow in G.sup39
�
� |
China Unicom
,
ZTE Corporation
� |
Q6/15
� |
2014-03-11 |
|
[ 709 ]
�
� |
Comments on Clause 13 of G.989.3
�
� |
China Telecommunications Corporation
,
Futurewei Technologies US R&D Center
,
Verizon Communication Corporation
,
ZTE Corporation
� |
Q2/15
� |
2014-03-11 |
|
[ 708 ]
�
� |
Proposal of starting a new work item or modify the existing recommendations on optical layer protection
�
� |
China Unicom
,
FiberHome Technologies Group
� |
Q9/15
� |
2014-03-11 |
|
[ 707 ]
�
� |
G.hn: Text Proposal for low power mechanism
�
� |
China Telecommunications Corporation
,
ZTE Corporation
� |
Q18/15
� |
2014-03-11 |
|
[ 706 ]
�
� |
NG-PON2 Type B Protection
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q2/15
� |
2014-03-11 |
|
[ 705 ]
�
� |
1588 PTP into OTUk overhead via GFP
�
� |
ZTE Corporation
,
China Telecommunications Corporation
,
Ministry of Industry and Information Technology (MIIT)
� |
Q11/15
� |
2014-03-11 |
|
[ 704 ]
�
� |
Withdrawn by submitter
�
� |
N/A
� |
� |
2014-03-11 |
|
[ 703 ]
�
� |
Withdrawn by submitter
�
� |
N/A
� |
� |
2014-03-11 |
|
[ 702 ]
�
� |
Boundary Clock and Transparent Clock functional model of 1588 over OTN
�
� |
ZTE Corporation
,
Ministry of Industry and Information Technology (MIIT)
� |
Q11/15
� |
2014-03-11 |
|
[ 701 ]
�
� |
Transparent clock model of 1588 over OTN
�
� |
ZTE Corporation
,
Ministry of Industry and Information Technology (MIIT)
� |
Q13/15, Q11/15
� |
2014-03-11 |
|
[ 700 ]
�
� |
Requirement of 1588 Transparent Clock function in OTN
�
� |
China Mobile Communications Corporation
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
� |
Q13/15, Q11/15
� |
2014-03-11 |
|
[ 699 ]
�
� |
Withdrawn by submitter
�
� |
N/A
� |
Q13/15
� |
2014-03-11 |
|
[ 698 ]
�
(Rev.1)� |
Components interaction for virtualization in Transport SDN
�
� |
China Mobile Communications Corporation
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
� |
Q14/15, Q12/15
� |
2014-03-11 |
|
[ 697 ]
�
� |
G.hn: Discussion on method for creating a secure G.hn domain
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
� |
Q18/15
� |
2014-03-11 |
|
[ 696 ]
�
� |
Self-configuration requirement of CCN in Transport SDN
�
� |
China Mobile Communications Corporation
,
China Mobile Communications Corporation
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
� |
Q14/15, Q12/15
� |
2014-03-11 |
|
[ 695 ]
�
� |
Withdrawn by submitter
�
� |
N/A
� |
� |
2014-03-11 |
|
[ 694 ]
�
� |
Withdrawn by submitter
�
� |
N/A
� |
Q14/15
� |
2014-03-11 |
|
[ 693 ]
�
� |
Hierarchy architecture of Transport SDN based on G.8080 components
�
� |
ZTE Corporation
� |
Q14/15, Q12/15
� |
2014-03-11 |
|
[ 692 ]
�
� |
Interworking requirement of CCN in Transport SDN
�
� |
China Mobile Communications Corporation
,
China Mobile Communications Corporation
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
� |
Q14/15, Q12/15
� |
2014-03-11 |
|
[ 691 ]
�
� |
proposal for TWDM PON Protection in G.989.1
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
� |
Q2/15
� |
2014-03-11 |
|
[ 690 ]
�
(Rev.1)� |
G.hn: New Power Saving Mechanism
�
� |
China Telecommunications Corporation
,
ZTE Corporation
� |
Q18/15
� |
2014-03-11 |
|
[ 689 ]
�
� |
Proposed new content for L.53
�
� |
China Telecommunications Corporation
� |
Q17/15
� |
2014-03-11 |
|
[ 688 ]
�
� |
Optical layer protection requirement of Metro DWDM system
�
� |
China Unicom
,
Ericsson Canada, Inc.
� |
Q9/15
� |
2014-03-11 |
|
[ 687 ]
�
� |
Consideration for 1588 over OTN by ESC
�
� |
Calnex Solutions Limited
,
China Unicom
,
Huawei Technologies Co. Ltd.
� |
Q13/15, Q11/15
� |
2014-03-11 |
|
[ 686 ]
�
� |
Suggestions for time interface connection between OTN and Package Switching / Transport Network
�
� |
Calnex Solutions Limited
,
China Unicom
� |
Q13/15, Q11/15
� |
2014-03-11 |
|
[ 685 ]
�
� |
Test and analysis about PTP over OTN by transparent mode
�
� |
Calnex Solutions Limited
,
China Unicom
,
Huawei Technologies Co. Ltd.
� |
Q13/15, Q11/15
� |
2014-03-11 |
|
[ 684 ]
�
� |
Editorial comments on draft G.8131
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/15
� |
2014-03-11 |
|
[ 683 ]
�
� |
Proposed text for Clause 9.3 of draft G.8131
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/15
� |
2014-03-11 |
|
[ 682 ]
�
� |
Rogue ONU consideration for TWDM-PON
�
� |
ZTE Corporation
� |
Q2/15
� |
2014-03-11 |
|
[ 681 ]
�
� |
China Comments and Proposals for C0441 "draft text of G.8131"
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q9/15
� |
2014-03-11 |
|
[ 680 ]
�
� |
Considerations for PTP over OTN network
�
� |
Ministry of Industry and Information Technology (MIIT)
,
China Telecommunications Corporation
,
China Unicom
� |
Q13/15
� |
2014-03-11 |
|
[ 679 ]
�
� |
Withdrawn, duplicate of C-0734
�
� |
N/A
� |
� |
2014-03-11 |
|
[ 678 ]
�
� |
The SDN controller model forAlarm and Performance Information Obtaining
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q14/15, Q12/15
� |
2014-03-11 |
Results:337 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):