International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 5 : WP 3/5�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 5� C�(2014-05-19)�

ITU-T�SG 5

Environment and climate change

Study Period 2013

Meeting� from 2014-05-19 to 2014-05-23

held in Switzerland [Geneva]

Other Meetings : 2017-11-202017-05-152016-10-102016-04-202015-10-122014-12-082014-07-232013-12-022013-01-29

Results:85 total items.
Result page:� Previous�-� 1 - 2
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 255 ]
(Rev.1)
Life-cycle management of ICT equipment: New section "2.4 Definitions" � Nokia Solutions and Networks Gmbh & Co. KG Q13/5 2014-05-05
[ 254 ]
(Rev.1-2)
Annex: Sourcing of materials � Nokia Solutions and Networks Gmbh & Co. KG Q13/5 2014-05-05
[ 253 ]
Proposal for recommendation L.RBS_assesment � Huawei Technologies Co. Ltd. Q17/5 2014-05-05
[ 252 ]
Reliability consideration of L.performance � Nippon Telegraph and Telephone Corporation (NTT) Q19/5 2014-05-04
[ 251 ]
Proposal on the scope of L.performance � Nippon Telegraph and Telephone Corporation (NTT) Q19/5 2014-05-04
[ 250 ]
Proposal on issues with connecting distributed power source to power feeding system and items of L.renewable � Nippon Telegraph and Telephone Corporation (NTT) Q19/5 2014-05-04
[ 249 ]
Proposed modification for Fresh water use and Land use reporting in joint LCA document � Nokia Solutions and Networks Gmbh & Co. KG Q18/5 2014-05-04
[ 248 ]
Proposals for the LC-comments of L.1002 � Ministry of Industry and Information Technology (MIIT) Q13/5 2014-05-04
[ 247 ]
(Rev.1)
Proposal for improving the part B of the sub-clause 8.2.1 of ITU-T L.1440 (a.k.a L.methodology_ICT in Cities) � Electronics and Telecommunications Research Institute (ETRI) Q18/5 2014-05-03
[ 246 ]
(Rev.1)
Proposal for improving the clause 11.2 of ITU-T L.1410rev � Electronics and Telecommunications Research Institute (ETRI) Q18/5 2014-05-03
[ 245 ]
Proposal for new text in clause 5.2 with link to new Appendix X � Huawei Technologies Co. Ltd. Q18/5 2014-05-02
[ 244 ]
Proposal for new text in Annex E for B1.1.10 and Note 6 � Huawei Technologies Co. Ltd. Q18/5 2014-05-02
[ 243 ]
Proposal for new text in Annex D for G2. Electricity � Huawei Technologies Co. Ltd. Q18/5 2014-05-02
[ 242 ]
Proposal for new Appendix X - Summary of Requirements � Huawei Technologies Co. Ltd. Q18/5 2014-05-02
[ 241 ]
Proposal of new text in Appendix V - Examples of Allocation Procedures � Huawei Technologies Co. Ltd. Q18/5 2014-05-02
[ 240 ]
A handset manufacturer's perspectives on mobile device eco-rating � Huawei Technologies Co. Ltd. Q16/5 2014-05-02
[ 239 ]
Development of Use Stage Scenario calculation in Basic LCA Specification in Mobile Phone Eco-Rating by adding message and video communication parameters � Huawei Technologies Co. Ltd. Q16/5 2014-05-02
[ 238 ]
Proposal for Recommendations L.NET_Infra_assessment � Huawei Technologies Co. Ltd. Q17/5 2014-05-02
[ 237 ]
(Rev.1)
Proposal for editorial improvements of ITU-T L.1300Rev (for Consent) � Electronics and Telecommunications Research Institute (ETRI) Q17/5 2014-05-02
[ 236 ]
Proposal on use cases, additional data items and additional requirements for L.DC_minimum set � Hitachi, Ltd. , Nippon Telegraph and Telephone Corporation (NTT) Q17/5 2014-05-01
[ 235 ]
Proposed text for L.DC_minimum set � Hitachi, Ltd. , Nippon Telegraph and Telephone Corporation (NTT) Q17/5 2014-05-01
[ 234 ]
(Rev.1)
Proposal for improving the clause 6 of ITU-T L.adaptation of countries � Korea (Rep. of) Q15/5 2014-05-01
[ 233 ]
(Rev.1)
Proposal for improvement of the article 7.3.5 in L.1300 Rev � Korea (Rep. of) Q17/5 2014-05-01
[ 232 ]
(Rev.1)
Used mobile phones collection in Korea � Korea (Rep. of) Q13/5 2014-05-01
[ 231 ]
(Rev.1)
Proposal for the new draft Recommendation on " Reference operational model and interface for improving energy efficiency of ICT network devices " � Korea (Rep. of) Q17/5 2014-05-01
[ 230 ]
(Rev.1)
Motivation for initiating standardization of reference operational model and interface for improving energy efficiency of ICT network devices � Korea (Rep. of) Q17/5 2014-05-01
[ 229 ]
(Rev.1)
Proposal for a new work item on a communication method to provide rare metals information of ICT goods � Korea (Rep. of) Q13/5 2014-05-01
[ 228 ]
Proposal on arrangement of scopes of energy efficiency metrics related to work items in Q17 � Nippon Telegraph and Telephone Corporation (NTT) Q19/5, Q17/5 2014-05-01
[ 227 ]
Energy Efficient Telecommunication Access Networks for the Smart Grids � CNIT , Telecom Italia Q17/5 2014-05-01
[ 226 ]
Position of Japan in developing ITU/ETSI joint LCA standard � Japan Q18/5 2014-04-30
[ 225 ]
A new text for 'Eight items to consider' � Japan Q18/5 2014-04-30
[ 224 ]
Proposal to add metrics for Converged packet optical equipment in L.1310 � Japan Q17/5 2014-04-30
[ 223 ]
Boundary definitions for cities � Nokia Solutions and Networks Gmbh & Co. KG Q18/5 2014-04-21
[ 222 ]
Case study: Rwanda policy development on e-waste management � Rwanda Q13/5 2014-04-21
[ 221 ]
Due diligence for supply chains of minerals from conflict areas � Democratic Republic of the Congo Q13/5 2014-04-18
Results:85 total items.
Result page:� Previous�-� 1 - 2
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-25