International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 16 : Meeting�2009-01-27�: Temporary Documents� Recently posted�-� Search Meeting Documents
ITU-T�SG 16� TD-PLEN�(2009-01-27)�

ITU-T�SG 16

Multimedia terminals, systems and applications

Study Period 2009

Meeting� from 2009-01-27 to 2009-02-06

held in Switzerland [Geneva]

Other Meetings : 2012-04-302011-11-212011-03-142010-07-192009-10-262009-07-102009-06-26� [ 2009-01-27 ]�

Results:89 total items.
Result page:� Previous�-� 1 - 2
Temporary Documents �(PLEN) ��Documents / Contributions

Number
Title Source AI/Question
Date
[ 39-PLEN ]
(Rev.1)
Draft revised H.323 Implementors' Guide (for Approval) � Editor H.323 IG Q2/16 2009-02-02
[ 38-PLEN ]
A.5 justification information for draft new G.711.1 (2008) Amd.2 � Editor G.711.1 Amd.2 Q10/16 2009-02-02
[ 37-PLEN ]
Documentation of interest for SG 9 (Geneva, 2-6 February 2009) and SG 16 (Geneva, 27 January - 6 February 2009) � TSB QALL/16 2009-02-02
[ 36-PLEN ]
Draft revised ITU-T Rec. H.248.42 "Gateway control protocol: DCME interworking package" (for Consent) � Editor H.248.42 Amd.1 Q3/16 2009-02-02
[ 35-PLEN ]
Agenda for Joint SG 9 and SG 16 plenary sessions � Chairmen SG 9 and SG 16 QALL/16 2009-02-02
[ 34-PLEN ]
(Rev.1)
Draft new ITU-T Rec. H.248.61 (ex H.248.ipocs) "Gateway control protocol: Packages for network level H.248 statistics" for Consent � Editor H.248.61 Q3/16 2009-02-02
[ 33-PLEN ]
(Rev.1)
Draft new ITU-T Rec. H.248.56 Corrigendum 1 "Gateway control protocol: Packages for virtual private network support: VLAN package clarifications" (for Consent) � Editor H.248.56 Cor.1 Q3/16 2009-02-02
[ 32-PLEN ]
Draft revised ITU-T Rec. H.248.14 "Gateway control protocol: Inactivity timer package" (for Consent) � Editor H.248.14 Q3/16 2009-02-02
[ 31-PLEN ]
Draft new ITU-T Rec. H.248.60 (ex H.248.CCI) "Gateway control protocol: Identification of content of communication" (for Consent) � Editor H.248.60 Q3/16 2009-02-02
[ 30-PLEN ]
A.5 justification information for draft new H.248.65 (ex H.248.RSVP) � Editor H.248.65 Q3/16 2009-02-02
[ 29-PLEN ]
Draft new ITU-T Rec. H.248.65 (ex H.248.RSVP) "Gateway control protocol: Support of the resource reservation protocol" (for Consent) � Editor H.248.65 Q3/16 2009-02-02
[ 28-PLEN ]
A.5 justification information for draft new G.719 (2008) Amd.2 � Editor G.719 Q10/16 2009-02-02
[ 27-PLEN ]
Report of the ITU Workshop on: "Including Accessibility and Human Factors in the Universalization of the Internet - How to reach persons with disabilities, the 10% of the next billion" (Hyderabad, India, 4 December 2008) � Rapporteur Q26/16 Q26/16 2009-01-30
[ 26-PLEN ]
Report of the first meeting of the Dynamic Coalition on Accessibility and Disability (DCAD) (Hyderabad, India, 6 December 2008) � Rapporteur Q26/16 Q26/16 2009-01-30
[ 25-PLEN ]
Draft revised Recommendation H.242 "System for establishing communication between audiovisual terminals using digital channels up to 2 Mbit/s" (for Consent) � Editor H.242 Q1/16 2009-01-29
[ 24-PLEN ]
Draft revised Recommendation H.230 "Frame-synchronous Control and Indication Signals for Audiovisual Systems" (for Consent) � Editor H.230 Q1/16 2009-01-29
[ 23-PLEN ]
Draft revised Recommendation H.221 "Frame structure for a 64 to 1920 kbit/s channel in audiovisual teleservices" (for Consent) � Editor H.221 Q1/16 2009-01-29
[ 22-PLEN ]
+Add.1
Draft new ITU-T Rec. H.222.0 (2006) | ISO/IEC 13818-1:2007 Amendment 3 "Information technology - Generic coding of moving pictures and associated audio information: Systems: Transport of scalable video over ITU-T Rec. H.222.0 | ISO/IEC 13818-1" (for Consent) � ISO/IEC JTC 1/SC 29 Q1/16 2009-01-29
[ 21-PLEN ]
+Add.1
Draft new ITU-T Rec. H.222.0 (2006) | ISO/IEC 13818-1:2007 Cor.2 "Information technology - Generic coding of moving pictures and associated audio information: Systems: Correction of transfer rate Rxn in the T-STD model" (for Consent) � ISO/IEC JTC 1/SC 29 Q1/16 2009-01-29
[ 20-PLEN ]
+Add.1
Draft ETSI Document on harmonised relay services - ES 202975 � Rapporteur Q26/16 Q26/16 2009-01-27
[ 19-PLEN ]
Draft agenda and documentation for Q26/16 (Accessibility to multimedia systems and services) � Rapporteur Q26/16 Q26/16 2009-01-27
[ 18-PLEN ]
Agenda for Q20/16 (Geneva, 27 January - 6 February 2009) � Rapporteur Q20/16 Q20/16 2009-01-27
[ 17-PLEN ]
(Rev.1)
Collaboration with SG 9 � Chairman SG 16 QALL/16 2009-01-26
[ 16-PLEN ]
Final list of participants � TSB QALL/16 2009-01-26
[ 15-PLEN ]
Report of ISO/IEC JTC1 SWG-A (Special WG on Accessibility) teleconference meeting (15 January 2009) � Liaison officer JTC1/SWG-A Q26/16 2009-01-23
[ 14-PLEN ]
Report of Promotion Activities for SG 16 � TSB QALL/16 2009-01-12
[ 13-PLEN ]
New ITU-R Question 229-2/5 "Future development of the terrestrial component of IMT" � TSB QALL/16 2009-01-09
[ 12-PLEN ]
(Rev.1-2)
Draft updated list of ITU-T SG 16 Liaison Officers � TSB QALL/16 2009-01-08
[ 11-PLEN ]
Call for papers - Second ITU-T Kaleidoscope "Innovations for Digital Inclusion" � TSB QALL/16 2009-01-08
[ 10-PLEN ]
Report of TSB Director's Ad Hoc Group on Intellectual Property Rights (IPR) (Geneva, 26-27 June 2008) � TSB QALL/16 2009-01-08
[ 9-PLEN ]
Provisional schedule for the ITU-T SG 16 meeting (Geneva, 27 January - 6 February 2009) � TSB QALL/16 2009-01-08
[ 8-PLEN ]
List of Implementors' Guides for Study Group 16 � TSB QALL/16 2009-01-08
[ 7-PLEN ]
Work programme for Study Group 16 � TSB QALL/16 2009-01-08
[ 6-PLEN ]
Status of texts Consented at previous meetings � TSB QALL/16 2009-01-08
[ 5-PLEN ]
(Rev.1-2)
List of IPR information received between May 2008 and January 2009 for ITU-T SG 16 Recommendations � TSB QALL/16 2009-01-08
[ 4-PLEN ]
Lists of Reports and Contributions and of initial Temporary Documents for the Study Group16 Meeting (Geneva, 27 January - 6 February 2009) � TSB QALL/16 2009-01-08
[ 3-PLEN ]
+Add.1
Summary of WTSA-08 decisions with impact on SG 16 work � TSB QALL/16 2009-01-08
[ 2-PLEN ]
(Rev.1)
Proposed SG 16 Structure and Chairmanship assignments � TSB QALL/16 2009-01-08
[ 1-PLEN ]
(Rev.1)
Information for Study Group 16 Meeting (Geneva, 27 January-6 February 2009) � TSB QALL/16 2009-01-08
Results:89 total items.
Result page:� Previous�-� 1 - 2
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-11