Temporary Documents
�(PLEN)
�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 39-PLEN ]
�
(Rev.1)� |
Draft revised H.323 Implementors' Guide (for Approval)
�
� |
Editor H.323 IG
� |
Q2/16
� |
2009-02-02 |
|
[ 38-PLEN ]
�
� |
A.5 justification information for draft new G.711.1 (2008) Amd.2
�
� |
Editor G.711.1 Amd.2
� |
Q10/16
� |
2009-02-02 |
|
[ 37-PLEN ]
�
� |
Documentation of interest for SG 9 (Geneva, 2-6 February 2009) and SG 16 (Geneva, 27 January - 6 February 2009)
�
� |
TSB
� |
QALL/16
� |
2009-02-02 |
|
[ 36-PLEN ]
�
� |
Draft revised ITU-T Rec. H.248.42 "Gateway control protocol: DCME interworking package" (for Consent)
�
� |
Editor H.248.42 Amd.1
� |
Q3/16
� |
2009-02-02 |
|
[ 35-PLEN ]
�
� |
Agenda for Joint SG 9 and SG 16 plenary sessions
�
� |
Chairmen SG 9 and SG 16
� |
QALL/16
� |
2009-02-02 |
|
[ 34-PLEN ]
�
(Rev.1)� |
Draft new ITU-T Rec. H.248.61 (ex H.248.ipocs) "Gateway control protocol: Packages for network level H.248 statistics" for Consent
�
� |
Editor H.248.61
� |
Q3/16
� |
2009-02-02 |
|
[ 33-PLEN ]
�
(Rev.1)� |
Draft new ITU-T Rec. H.248.56 Corrigendum 1 "Gateway control protocol: Packages for virtual private network support: VLAN package clarifications" (for Consent)
�
� |
Editor H.248.56 Cor.1
� |
Q3/16
� |
2009-02-02 |
|
[ 32-PLEN ]
�
� |
Draft revised ITU-T Rec. H.248.14 "Gateway control protocol: Inactivity timer package" (for Consent)
�
� |
Editor H.248.14
� |
Q3/16
� |
2009-02-02 |
|
[ 31-PLEN ]
�
� |
Draft new ITU-T Rec. H.248.60 (ex H.248.CCI) "Gateway control protocol: Identification of content of communication" (for Consent)
�
� |
Editor H.248.60
� |
Q3/16
� |
2009-02-02 |
|
[ 30-PLEN ]
�
� |
A.5 justification information for draft new H.248.65 (ex H.248.RSVP)
�
� |
Editor H.248.65
� |
Q3/16
� |
2009-02-02 |
|
[ 29-PLEN ]
�
� |
Draft new ITU-T Rec. H.248.65 (ex H.248.RSVP) "Gateway control protocol: Support of the resource reservation protocol" (for Consent)
�
� |
Editor H.248.65
� |
Q3/16
� |
2009-02-02 |
|
[ 28-PLEN ]
�
� |
A.5 justification information for draft new G.719 (2008) Amd.2
�
� |
Editor G.719
� |
Q10/16
� |
2009-02-02 |
|
[ 27-PLEN ]
�
� |
Report of the ITU Workshop on: "Including Accessibility and Human Factors in the Universalization of the Internet - How to reach persons with disabilities, the 10% of the next billion" (Hyderabad, India, 4 December 2008)
�
� |
Rapporteur Q26/16
� |
Q26/16
� |
2009-01-30 |
|
[ 26-PLEN ]
�
� |
Report of the first meeting of the Dynamic Coalition on Accessibility and Disability (DCAD) (Hyderabad, India, 6 December 2008)
�
� |
Rapporteur Q26/16
� |
Q26/16
� |
2009-01-30 |
|
[ 25-PLEN ]
�
� |
Draft revised Recommendation H.242 "System for establishing communication between audiovisual terminals using digital channels up to 2 Mbit/s" (for Consent)
�
� |
Editor H.242
� |
Q1/16
� |
2009-01-29 |
|
[ 24-PLEN ]
�
� |
Draft revised Recommendation H.230 "Frame-synchronous Control and Indication Signals for Audiovisual Systems" (for Consent)
�
� |
Editor H.230
� |
Q1/16
� |
2009-01-29 |
|
[ 23-PLEN ]
�
� |
Draft revised Recommendation H.221 "Frame structure for a 64 to 1920 kbit/s channel in audiovisual teleservices" (for Consent)
�
� |
Editor H.221
� |
Q1/16
� |
2009-01-29 |
|
[ 22-PLEN ]
�
+Add.1� |
Draft new ITU-T Rec. H.222.0 (2006) | ISO/IEC 13818-1:2007 Amendment 3 "Information technology - Generic coding of moving pictures and associated audio information: Systems: Transport of scalable video over ITU-T Rec. H.222.0 | ISO/IEC 13818-1" (for Consent)
�
� |
ISO/IEC JTC 1/SC 29
� |
Q1/16
� |
2009-01-29 |
|
[ 21-PLEN ]
�
+Add.1� |
Draft new ITU-T Rec. H.222.0 (2006) | ISO/IEC 13818-1:2007 Cor.2 "Information technology - Generic coding of moving pictures and associated audio information: Systems: Correction of transfer rate Rxn in the T-STD model" (for Consent)
�
� |
ISO/IEC JTC 1/SC 29
� |
Q1/16
� |
2009-01-29 |
|
[ 20-PLEN ]
�
+Add.1� |
Draft ETSI Document on harmonised relay services - ES 202975
�
� |
Rapporteur Q26/16
� |
Q26/16
� |
2009-01-27 |
|
[ 19-PLEN ]
�
� |
Draft agenda and documentation for Q26/16 (Accessibility to multimedia systems and services)
�
� |
Rapporteur Q26/16
� |
Q26/16
� |
2009-01-27 |
|
[ 18-PLEN ]
�
� |
Agenda for Q20/16 (Geneva, 27 January - 6 February 2009)
�
� |
Rapporteur Q20/16
� |
Q20/16
� |
2009-01-27 |
|
[ 17-PLEN ]
�
(Rev.1)� |
Collaboration with SG 9
�
� |
Chairman SG 16
� |
QALL/16
� |
2009-01-26 |
|
[ 16-PLEN ]
�
� |
Final list of participants
�
� |
TSB
� |
QALL/16
� |
2009-01-26 |
|
[ 15-PLEN ]
�
� |
Report of ISO/IEC JTC1 SWG-A (Special WG on Accessibility) teleconference meeting (15 January 2009)
�
� |
Liaison officer JTC1/SWG-A
� |
Q26/16
� |
2009-01-23 |
|
[ 14-PLEN ]
�
� |
Report of Promotion Activities for SG 16
�
� |
TSB
� |
QALL/16
� |
2009-01-12 |
|
[ 13-PLEN ]
�
� |
New ITU-R Question 229-2/5 "Future development of the terrestrial component of IMT"
�
� |
TSB
� |
QALL/16
� |
2009-01-09 |
|
[ 12-PLEN ]
�
(Rev.1-2)� |
Draft updated list of ITU-T SG 16 Liaison Officers
�
� |
TSB
� |
QALL/16
� |
2009-01-08 |
|
[ 11-PLEN ]
�
� |
Call for papers - Second ITU-T Kaleidoscope "Innovations for Digital Inclusion"
�
� |
TSB
� |
QALL/16
� |
2009-01-08 |
|
[ 10-PLEN ]
�
� |
Report of TSB Director's Ad Hoc Group on Intellectual Property Rights (IPR) (Geneva, 26-27 June 2008)
�
� |
TSB
� |
QALL/16
� |
2009-01-08 |
|
[ 9-PLEN ]
�
� |
Provisional schedule for the ITU-T SG 16 meeting (Geneva, 27 January - 6 February 2009)
�
� |
TSB
� |
QALL/16
� |
2009-01-08 |
|
[ 8-PLEN ]
�
� |
List of Implementors' Guides for Study Group 16
�
� |
TSB
� |
QALL/16
� |
2009-01-08 |
|
[ 7-PLEN ]
�
� |
Work programme for Study Group 16
�
� |
TSB
� |
QALL/16
� |
2009-01-08 |
|
[ 6-PLEN ]
�
� |
Status of texts Consented at previous meetings
�
� |
TSB
� |
QALL/16
� |
2009-01-08 |
|
[ 5-PLEN ]
�
(Rev.1-2)� |
List of IPR information received between May 2008 and January 2009 for
ITU-T SG 16 Recommendations
�
� |
TSB
� |
QALL/16
� |
2009-01-08 |
|
[ 4-PLEN ]
�
� |
Lists of Reports and Contributions and of initial Temporary Documents for the Study Group16 Meeting (Geneva, 27 January - 6 February 2009)
�
� |
TSB
� |
QALL/16
� |
2009-01-08 |
|
[ 3-PLEN ]
�
+Add.1� |
Summary of WTSA-08 decisions with impact on SG 16 work
�
� |
TSB
� |
QALL/16
� |
2009-01-08 |
|
[ 2-PLEN ]
�
(Rev.1)� |
Proposed SG 16 Structure and Chairmanship assignments
�
� |
TSB
� |
QALL/16
� |
2009-01-08 |
|
[ 1-PLEN ]
�
(Rev.1)� |
Information for Study Group 16 Meeting (Geneva, 27 January-6 February 2009)
�
� |
TSB
� |
QALL/16
� |
2009-01-08 |
Results:89 total items. Result page:�
Previous�-�
1 -
2
� |
Multiple Document Download:�Formats and Languages to be included (when available):