Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1468 ]
�
� |
Transitional Link attributes for optical transponders and 3R regenerators in the OTN
�
� |
Alcatel-Lucent
� |
Q14/15, Q12/15
� |
2011-02-02 |
|
[ 1467 ]
�
(Rev.1)� |
Allocation and assignment of experimental and non-standard code points
�
� |
United States of America
� |
Q10/15
� |
2011-02-02 |
|
[ 1466 ]
�
� |
G.hnem: Proposal for the text update of Annex C
�
� |
Lantiq AEG
� |
Q4/15
� |
2011-02-02 |
|
[ 1465 ]
�
(Rev.1)� |
USA on Consent of Draft Recommendation G.tpoam
�
� |
United States of America
� |
Q10/15
� |
2011-02-02 |
|
[ 1464 ]
�
� |
G.hnem: Informative Appendix to describe use cases and installation examples
�
� |
Lantiq AEG
� |
Q4/15
� |
2011-02-02 |
|
[ 1463 ]
�
� |
Wavelength conversion in reconfigurable multi-degree optical nodes
�
� |
Deutsche Telekom
� |
Q7/15
� |
2011-02-02 |
|
[ 1462 ]
�
� |
Considerations on transverse compatibility for systems according to G.698.2
�
� |
Deutsche Telekom
� |
Q6/15
� |
2011-02-02 |
|
[ 1461 ]
�
� |
Withdrawn by TSB (duplicate): See C-1439, "Comments on differentiation of MPLS-TP applications"
�
� |
NSN
� |
Q9/15, Q14/15, Q12/15, Q10/15
� |
2011-02-02 |
|
[ 1460 ]
�
� |
G.gen: G.vdsl: G.hn: On the feasibility of a low complexity G.hn based FTTdp solution
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1459 ]
�
� |
G.8260: comments on WD107 from Edinburgh interim meeting (PDV metrics)
�
� |
France Telecom
,
Tellabs
� |
Q13/15
� |
2011-02-02 |
|
[ 1458 ]
�
� |
Network PDV accumulation study with "end-to-end" data traffic model
�
� |
France Telecom
� |
Q13/15
� |
2011-02-02 |
|
[ 1457 ]
�
� |
G.8275.1: mapping of PTPv2 messages in the PTPv2 telecom profile phase/time-oriented
�
� |
France Telecom
� |
Q13/15
� |
2011-02-02 |
|
[ 1456 ]
�
� |
G.8272: comments on PRTC limits proposal
�
� |
France Telecom
� |
Q13/15
� |
2011-02-02 |
|
[ 1455 ]
�
� |
G.8263: testing methodology for the PDV tolerance of a packet slave clock
�
� |
France Telecom
� |
Q13/15
� |
2011-02-02 |
|
[ 1454 ]
�
� |
G.8261.1: Hypothetical Reference Models proposal
�
� |
France Telecom
� |
Q13/15
� |
2011-02-02 |
|
[ 1453 ]
�
� |
G.8261.1: Preliminary proposal of PDV network limits for the HRM-1
�
� |
France Telecom
� |
Q13/15
� |
2011-02-02 |
|
[ 1452 ]
�
� |
Possible locations of external phase/time interfaces in a phase/time distribution chain based on Boundary Clocks
�
� |
France Telecom
� |
Q13/15
� |
2011-02-02 |
|
[ 1451 ]
�
� |
Analysis of phase/time distribution over OTN networks
�
� |
France Telecom
� |
Q9/15, Q13/15, Q11/15
� |
2011-02-02 |
|
[ 1450 ]
�
� |
Proposal of a Working Document from Q13 to Q2, Q4 and Q11 reflecting the current status of the work in Q13 on phase/time synchronization
�
� |
France Telecom
� |
Q13/15
� |
2011-02-02 |
|
[ 1449 ]
�
� |
Further consideration of requirements for on-demand segment monitoring in MPLS-TP
�
� |
NTT
,
Telecom Italia
� |
Q12/15, Q10/15
� |
2011-02-02 |
|
[ 1448 ]
�
� |
Consideration and proposal for resolving issue of OAM solutions in MPLS-TP
�
� |
NTT
� |
Q12/15, Q10/15
� |
2011-02-02 |
|
[ 1447 ]
�
� |
Proposal for additional delay measurement functions in MPLS-TP OAM
�
� |
NTT
� |
Q9/15, Q14/15, Q10/15
� |
2011-02-02 |
|
[ 1446 ]
�
� |
Proposal of adding topic of Timing and Synchronization Aspects of Packet Networks in OTNT SWP
�
� |
NTT
� |
Q3/15, Q13/15
� |
2011-02-02 |
|
[ 1445 ]
�
� |
Adherence to In-Force Cooperation Agreements for the Development of MPLS-TP OAM Solutions
�
� |
ISOC
� |
Q9/15, Q14/15, Q12/15, Q10/15
� |
2011-02-02 |
|
[ 1444 ]
�
� |
G.hn: corrections to Tunnel termination for a corrigendum to G.9961
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1443 ]
�
� |
G.hn: Handling multicast traffic in G.hn
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1442 ]
�
� |
G.hn: Differentiate between DLL multicast traffic and PHY multicast traffic in G.hn
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1441 ]
�
� |
Withdrawn: MPLS-TP Standards
�
� |
BT
� |
Q9/15, Q14/15, Q12/15, Q10/15
� |
2011-02-02 |
|
[ 1440 ]
�
� |
Second generation ETH MEP and MIP functions
�
� |
Huawei
� |
Q9/15
� |
2011-02-02 |
|
[ 1439 ]
�
� |
Comments on differentiation of MPLS-TP environments
�
� |
NSN
� |
Q9/15, Q14/15, Q12/15, Q10/15
� |
2011-02-02 |
|
[ 1438 ]
�
� |
G.gen: G.vdsl: G.ploam: Ambiguity of SES and UAS during re-initialization
�
� |
Alcatel-Lucent Bell N.V.
� |
Q4/15
� |
2011-02-02 |
|
[ 1437 ]
�
� |
G.vdsl: Re-Initialization Policies: Proposed changes to working text for G.993.2
�
� |
Alcatel-Lucent Bell N.V.
� |
Q4/15
� |
2011-02-02 |
|
[ 1436 ]
�
� |
Control elements for BMCA in telecom
�
� |
NSN
� |
Q13/15
� |
2011-02-02 |
|
[ 1435 ]
�
� |
MATIE, MTIE, and MAFE graphs into metrics definitions
�
� |
NSN
� |
Q13/15
� |
2011-02-02 |
|
[ 1434 ]
�
� |
A proposal to start a new Recommendation for "Narrow band, sub 1 GHz, wireless transceivers - PHY & MAC layer specifications"
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1433 ]
�
� |
G.hn: Proposed Annex for extension of G.hn for optical transmission media
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1432 ]
�
� |
G.hn: Backup Domain master related corrigendum items for G.9961
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1431 ]
�
� |
G.hn: Corrigendum items for G.9961
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1430 ]
�
� |
G.hn: Update of the text for the "symbol boosting" mechanism
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1429 ]
�
� |
G.hn: Orthogonal preambles for the Neighbour domain interference mitigation (NDIM) mechanism
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1428 ]
�
� |
G.hn: MIMO transmission scheme for PHY frames and signals other than 'frames where the payload is intended only for MIMO receivers', for G.hn-MIMO
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1427 ]
�
� |
G.hn: Update of the "modulation of unloaded subcarriers" text of G.hn-MIMO
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1426 ]
�
� |
G.hn: Channel estimation protocol for G.hn-MIMO
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1425 ]
�
� |
G.hn: Update of the text of 'Tx ports mapping' for G.hn-MIMO
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1424 ]
�
� |
Treatment of delay jumps in PDV data
�
� |
NSN
� |
Q13/15
� |
2011-02-02 |
|
[ 1423 ]
�
� |
Draft baseline text describing the Alternative Electrical Length Estimation Method (AELEM)
�
� |
BT
� |
Q4/15
� |
2011-02-01 |
|
[ 1422 ]
�
� |
G.adsl: G.vdsl : Low Power Modes for Remote VDSL2 Nodes
�
� |
BT
� |
Q4/15
� |
2011-02-01 |
|
[ 1421 ]
�
� |
G.VDSL: INM INPEQ Histogram
�
� |
BT
� |
Q4/15
� |
2011-02-01 |
|
[ 1420 ]
�
� |
Functional model of HAO
�
� |
Huawei
� |
Q9/15, Q11/15
� |
2011-02-01 |
|
[ 1419 ]
�
� |
G.VDSL: INM IAT Histogram
�
� |
BT
� |
Q4/15
� |
2011-02-01 |
Results:418 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):