International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2010-05-31�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2010-05-31)�

ITU-T�SG15

Transport network structures

Study Period 2009

Meeting� from 2010-05-31 to 2010-06-11

held in Switzerland [Geneva]

Other Meetings : 2012-09-102012-05-112011-12-052011-09-162011-02-142010-10-222010-01-152009-09-282009-05-152008-12-01

Results:352 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 1049 ]
Propose to add the monitoring time requirement based on application scenarios in G.697 � Huawei Q6/15 2010-05-20
[ 1048 ]
Proposal to include PDM-BPSK into 40G modulation formats in G.sup39 � CATR Q6/15 2010-05-22
[ 1047 ]
Proposal on considerations of interactions of PMD and filtering effects with nonlinear effects in optical transmissions in G.680 � Huawei Q6/15 2010-05-20
[ 1046 ]
G.vdsl: Proposed Text for Distribution of Time-of-Day over VDSL2 Links � Huawei , MIIT Q4/15 2010-05-20
[ 1045 ]
G.vdsl: More on Distribution of Time-of-Day over VDSL2 Links � Huawei , China Telecom , MIIT Q4/15 2010-05-20
[ 1044 ]
Proposal for ring topology discovery � ZTE Q14/15 2010-05-20
[ 1043 ]
Scenarios of mpls-tp discovery � ZTE Q14/15 2010-05-20
[ 1042 ]
Architecture of time synchronization using packet based method in G.8275 � ZTE , CMCC Q13/15 2010-05-20
[ 1041 ]
Issues about metrics of network limits for time synchronization � ZTE , CATR , CMCC Q13/15 2010-05-20
[ 1040 ]
Field test of 1588v2 time sync based on physical layer frequency sync support � ZTE , CATR , CMCC Q13/15 2010-05-20
[ 1039 ]
Definition related to time/phase sync in G.8260 � ZTE , CMCC Q13/15 2010-05-20
[ 1038 ]
Performance analysis of 1588v2 time/sync in field test � ZTE , CMCC Q13/15 2010-05-20
[ 1037 ]
1588v2 test results with different clock mode and field network � ZTE , CATR , CMCC Q13/15 2010-05-20
[ 1036 ]
(Rev.1)
Consideration on Phase/Time synchronization over OTN � ZTE Q13/15, Q11/15 2010-05-20
[ 1035 ]
Proposal of Misconnection in Ring Protection � ZTE Q9/15 2010-05-20
[ 1034 ]
Consideration on LO ODUk Ring Protection � ZTE Q9/15 2010-05-20
[ 1033 ]
Comments on draft of G.ptneq generics � ZTE Q9/15 2010-05-20
[ 1032 ]
DNF at NR messages (G.8032) � ZTE Q9/15 2010-05-20
[ 1031 ]
SD scenarios (G.8031) � ZTE Q9/15 2010-05-20
[ 1030 ]
SD detection in G.8031 � ZTE Q9/15 2010-05-20
[ 1029 ]
Rough estimation of system non-linear effects using non-linear phase in G.SUP 39 � ZTE Q6/15 2010-05-20
[ 1028 ]
Filter phase ripple discussion for G.680 � ZTE Q6/15 2010-05-20
[ 1027 ]
IPv6 Multicast filter � ZTE Q2/15 2010-05-20
[ 1026 ]
Proposal for Combo Reach Extender (CRE) device for G.987.re � ZTE Q2/15 2010-05-20
[ 1025 ]
Clarification on ODU Multiplexing � AT&T Q13/15, Q12/15 2010-05-20
[ 1024 ]
Construction of special optical fibre cables for extreme applications in sewer environment � Telecom Italia Q16/15 2010-05-20
[ 1023 ]
Transitional Link Study Points � Tellabs Q12/15 2010-05-20
[ 1022 ]
Model for the All Optical Network � Tellabs Q12/15 2010-05-20
[ 1021 ]
G.hnem: Coexistence of G.hnem with legacy narrow-band services � Lantiq Q4/15 2010-05-20
[ 1020 ]
G.hnem: Proposal to define runtime BATs in G.hnem � Lantiq Q4/15 2010-05-20
[ 1019 ]
G.8251: OTN timing aspects � France T�l�com Q13/15, Q11/15 2010-05-20
[ 1018 ]
G.hnem: Proposal to address utility access network in G.hnem � Lantiq Q4/15 2010-05-20
[ 1017 ]
Network PDV accumulation study � France T�l�com Q13/15 2010-05-20
[ 1016 ]
G.hnem: Proposal to use PHY-layer addressing in G.hnem � Lantiq Q4/15 2010-05-20
[ 1015 ]
G.cx: Proposal for additional changes before approval � Lantiq Q4/15 2010-05-20
[ 1014 ]
G.hnem: Proposal for G.hnem constellation mappings � Lantiq Q4/15 2010-05-20
[ 1013 ]
G.hnem: Advantage of coherent mappings for G.hnem � Lantiq Q4/15 2010-05-20
[ 1012 ]
Living List for XG-PON Transmission Convergence layer specification � Huawei , Mitsubishi , Motorola Q2/15 2010-05-20
[ 1011 ]
Proposed changes to add MMM � DS2 Q4/15 2010-05-20
[ 1010 ]
Multi-Medium Mode: Default operational mode for G.9960 when in a multi-medium domain � DS2 Q4/15 2010-05-20
[ 1009 ]
AMI application support Appendix for G.9960 and G.9961 � DS2 Q4/15 2010-05-20
[ 1008 ]
Concatenated Code For ITU-T G.hnem � Yitran Q4/15 2010-05-20
[ 1007 ]
G.hnem APC for Interfacing to IPv6 � Yitran Q4/15 2010-05-20
[ 1006 ]
G.hnem Addressing Scheme � Yitran Q4/15 2010-05-20
[ 1005 ]
G.hnem Relaying Functionality � Yitran Q4/15 2010-05-20
[ 1004 ]
G.hnem Segmentation and Reassembly Mechanism � Yitran Q4/15 2010-05-20
[ 1003 ]
G.hnem LCC Frame Format � Yitran Q4/15 2010-05-20
[ 1002 ]
G.hnem Coherent Modulation Considerations � Yitran Q4/15 2010-05-20
[ 1001 ]
Equivalence of the IEEE 1588 Boundary Clock and Peer-to-Peer Transparent Clock for Synchronization Transport � Huawei Q13/15 2010-05-20
[ 1000 ]
Scale factors for ADSL2+ Virtual Noise � BT Q4/15 2010-05-20
Results:352 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-11