Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 254 ]
�
� |
Proposed draft Q.MMtesting
�
� |
NEC Corporation
,
OKI Electric Industry Company Ltd. (OKI)
� |
Q10/11
� |
2011-10-03 |
|
[ 253 ]
�
� |
Template to describe a proposed new ITU-T Recommendation
�
� |
France
� |
QALL/11
� |
2011-10-03 |
|
[ 252 ]
�
� |
Proposal for new work item: Revision of X.603
�
� |
Korea (Rep. of)
� |
Q15/11
� |
2011-09-30 |
|
[ 251 ]
�
� |
Proposed revision for overall structure of X.603-1 (RMCP-2)
�
� |
Korea (Rep. of)
� |
Q15/11
� |
2011-09-30 |
|
[ 250 ]
�
� |
Proposed new text for Annex A of Q.3308.1
�
� |
Korea (Rep. of)
� |
Q5/11
� |
2011-09-30 |
|
[ 249 ]
�
� |
Proposal for modification of X.603
�
� |
Korea (Rep. of)
� |
Q15/11
� |
2011-09-30 |
|
[ 248 ]
�
� |
Proposed revision for SM and MA operation of X.603.1 (RMCP-2)
�
� |
Korea (Rep. of)
� |
Q15/11
� |
2011-09-30 |
|
[ 247 ]
�
� |
Proposed new Questions for the next Study Period
�
� |
Huawei Technologies Co. Ltd.
� |
QALL/11
� |
2011-09-29 |
|
[ 246 ]
�
(Rev.1)� |
Proposed text for clause 9 in draft Rec. Q.NGN-SigProt
�
� |
China Telecommunications Corporation
� |
Q1/11
� |
2011-09-29 |
|
[ 245 ]
�
(Rev.1)� |
Proposed text for clause 8 in draft Rec. Q.NGN-SigProt
�
� |
China Telecommunications Corporation
� |
Q1/11
� |
2011-09-29 |
|
[ 244 ]
�
� |
Proposed draft Recommendation Q.3323.3 for consent
�
� |
China
,
Huawei Technologies Co. Ltd.
� |
Q5/11
� |
2011-09-29 |
|
[ 243 ]
�
� |
Proposed service monitoring parameters added into the draft Recommendation Q.3912
�
� |
China
� |
Q9/11
� |
2011-09-29 |
|
[ 242 ]
�
� |
Proposed MPEG-2 TS monitoring parameters added into the draft Recommendation Q.3912
�
� |
China
� |
Q9/11
� |
2011-09-29 |
|
[ 241 ]
�
� |
Proposal to define a new work item on IPv6 signalling procedure
�
� |
Huawei Technologies Co. Ltd.
� |
Q5/11
� |
2011-09-28 |
|
[ 240 ]
�
(Rev.1)� |
Proposed draft text for liaisons intended to share draft revised Supp 62 text
�
� |
Canada
� |
Q13/11
� |
2011-09-22 |
|
[ 239 ]
�
(Rev.1)� |
Support for modification to Q Supp. 62
�
� |
Canada
� |
Q13/11
� |
2011-09-22 |
|
[ 238 ]
�
(Rev.1)� |
Proposed modifications of Appendix II of Q Series Supplement 49 TRQ 2480
�
� |
Canada
� |
Q3/11, Q2/11, Q13/11
� |
2011-09-21 |
|
[ 236 ]
�
� |
Draft Recommendation ITU-T Q.3925 "The types of traffic flows which should be generated for voice, data and video on the Model network for testing QoS parameters"
�
� |
Russian Federation
� |
Q11/11
� |
2011-09-16 |
|
[ 235 ]
�
� |
Contribution on NP QoS Handbook
�
� |
Russian Federation
� |
Q6/11, Q11/11
� |
2011-09-16 |
|
[ 234 ]
�
� |
Draft Recommendation ITU-T Q.3945 "The types and list of NGN services testing on the Model networks. Test set I"
�
� |
Russian Federation
� |
Q10/11
� |
2011-09-16 |
|
[ 233 ]
�
� |
Justification of ETSI document ETSI TS 186 001- 4 Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 4: Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) proforma specification for SIP-SIP
�
� |
A1 Telekom Austria
� |
Q8/11
� |
2011-04-21 |
|
[ 232 ]
�
� |
Q.3941.4 Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 4: Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) proforma specification for SIP-SIP
�
� |
A1 Telekom Austria
� |
Q8/11
� |
2011-04-21 |
|
[ 231 ]
�
� |
ETSI TS 186 001-4 Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 4: Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) proforma specification
�
� |
A1 Telekom Austria
� |
Q8/11
� |
2011-04-21 |
|
[ 230 ]
�
� |
Justification of ETSI document ETSI TS 186 001-3 Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 3: Test Suite Structure and Test Purposes (TSS&TP) for SIP-SIP
�
� |
A1 Telekom Austria
� |
Q8/11
� |
2011-04-21 |
|
[ 229 ]
�
� |
Q.3941.3 Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 1: Test Suite Structure and Test Purposes (TSS&TP) for SIP-SIP
�
� |
A1 Telekom Austria
� |
Q8/11
� |
2011-04-21 |
|
[ 228 ]
�
� |
ETSI TS 186 001-3 Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 3: Test Suite Structure and Test Purposes (TSS&TP) for SIP-SIP
�
� |
A1 Telekom Austria
� |
Q8/11
� |
2011-04-21 |
|
[ 227 ]
�
� |
Justification of ETSI document ETSI TS 186 001-2 ETSI TS 186 001-2 Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 2: Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) proforma specification
�
� |
A1 Telekom Austria
� |
Q8/11
� |
2011-04-21 |
|
[ 226 ]
�
� |
Q.3941.2 - Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 2: Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) proforma specification
�
� |
A1 Telekom Austria
� |
Q8/11
� |
2011-04-21 |
|
[ 225 ]
�
� |
ETSI TS 186 001-2 Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 2: Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) proforma specification
�
� |
A1 Telekom Austria
� |
Q8/11
� |
2011-04-21 |
|
[ 224 ]
�
� |
Justification of ETSI document ETSI TS 186 001-1 Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 1: Test Suite Structure and Test Purposes (TSS&TP) for SIP-ISDN
�
� |
A1 Telekom Austria
� |
Q8/11
� |
2011-04-21 |
|
[ 223 ]
�
� |
Q.3941.1 - Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 1: Test Suite Structure and Test Purposes (TSS&TP) for SIP-ISDN
�
� |
A1 Telekom Austria
� |
Q8/11
� |
2011-04-21 |
|
[ 222 ]
�
� |
ETSI TS 186 001-1 Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 1: Test Suite Structure and Test Purposes (TSS&TP) for SIP-ISDN
�
� |
A1 Telekom Austria
� |
Q8/11
� |
2011-04-21 |
|
[ 221 ]
�
� |
Update of Scope chapter of Q.3325
�
� |
Poland
� |
Q5/11
� |
2011-01-13 |
|
[ 220 ]
�
� |
Update of chapter 6.1 Overview of Q.3325
�
� |
Poland
� |
Q5/11
� |
2011-01-13 |
|
[ 219 ]
�
� |
Proposed signalling flow for Communication Hold service feature in Q.centrexSig
�
� |
China
� |
Q3/11, Q2/11
� |
2011-01-13 |
|
[ 218 ]
�
� |
Proposed signalling flow for Communication Forwarding service feature in Q.centrexSig
�
� |
China
� |
Q3/11, Q2/11
� |
2011-01-13 |
|
[ 217 ]
�
� |
Proposed signalling flow for Communication Transfer service feature in Q.centrexSig
�
� |
China
� |
Q3/11, Q2/11
� |
2011-01-13 |
|
[ 216 ]
�
� |
Proposed a new chapter to Handbook of Testing
�
� |
NEC
� |
Q8/11, Q6/11
� |
2011-01-10 |
|
[ 215 ]
�
� |
Proposed modifications for Q.3323.1:Resource control protocol no.3: COPS Profile Protocol at the Rw interface between Policy Decision Physical Entity (PD-PE) and Policy Enforcement Physical Entity (PE-PE)
�
� |
NEC
� |
Q5/11
� |
2011-01-10 |
|
[ 214 ]
�
� |
Proposed text to the draft Recommendation "Q.VoIP service testing at NGN UNI"
�
� |
NEC, OKI
� |
Q10/11
� |
2011-01-10 |
|
[ 213 ]
�
� |
Proposed text for clause 6 in draft Rec. Q.NGN-SigProt
�
� |
China
� |
Q1/11
� |
2011-01-10 |
|
[ 212 ]
�
� |
Proposed modifications on Signalling Requirements and Signalling Flows of TS-IVR
�
� |
KT
� |
Q3/11, Q2/11
� |
2011-01-10 |
|
[ 211 ]
�
� |
Proposed revision of TD 416 to use FSA Ethertype
�
� |
Anagran Inc.
� |
Q5/11
� |
2011-01-10 |
|
[ 210 ]
�
� |
Q.Flowstatesig - Need for Technical Report for FSA Signalling Requirement
�
� |
Juniper, AT&T, Cisco
,
Qwest, Verizon, Nokia Siemens, Ericsson
� |
Q5/11
� |
2011-01-10 |
|
[ 209 ]
�
� |
Support for the approval of TRQ.ETS Overview out of the January 2011 Meeting
�
� |
Industry Canada
� |
Q13/11
� |
2011-01-07 |
|
[ 208 ]
�
� |
Proposed initiation of revision work in X.603-1 (RMCP-2)
�
� |
Korea (rep. of)
� |
Q15/11
� |
2011-01-07 |
|
[ 207 ]
�
� |
Proposal for the revised text of Section 6 and 7 in draft Q.M9
�
� |
Korea (Rep. of)
� |
Q5/11
� |
2011-01-07 |
|
[ 206 ]
�
� |
Proposal for a new Supplement/Recommendation related to ETS Security
�
� |
Industry Canada
� |
Q13/11
� |
2011-01-07 |
|
[ 205 ]
�
� |
Proposed modifications of Appendix II of Q Series Supplement 49 TRQ 2480
�
� |
Industry Canada
� |
Q13/11
� |
2011-01-07 |
|
[ 204 ]
�
� |
Proposed modifications of TRQ.ETS Overview
�
� |
Industry Canada
� |
Q13/11
� |
2011-01-07 |
Results:303 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):