International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : R23-WP4B : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�R23-WP4B� C�

ITU-R�R23-WP4B

Systems, air interfaces, performance and availability objectives for FSS, BSS and MSS, including IP-based applications and satellite news gathering

Results:100 total items.
Result page:� Previous�-� 1 - 2
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 50 ]
Liaison statement on consent of draft new Recommendation ITU-T Y.3210 (Ex.Y.FMSC-DLT) - Fixed, mobile and satellite convergence - Distributed ledger technology for IMT-2020 networks and beyond � ITU-T SG13 2024-08-26
[ 49 ]
Liaison statement on consent of draft new Recommendation ITU-T Y.3209 (Ex.Y.FMSC-TS) - Fixed, mobile and satellite convergence - Traffic scheduling for IMT-2020 networks and beyond � ITU-T SG13 2024-08-26
[ 48 ]
Liaison statement on consent of draft new Recommendation ITU-T Y.3208 (Ex.Y.FMSC-SMSB) - Fixed, mobile and satellite convergence - Session management with satellite backhaul for IMT-2020 networks and beyond � ITU-T SG13 2024-08-26
[ 47 ]
Liaison statement on progress of distributed ledger technology (DLT) standardization in Q2/13 � ITU-T SG13 2024-08-23
[ 46 ]
Liaison statement on consent of draft new Recommendation ITU-T Y.3216 (Ex.Y.FMSC-DCN) - Fixed, mobile and satellite convergence - Distributed core network for IMT-2020 networks and beyond � ITU-T SG13 2024-08-23
[ 45 ]
Information on the preparation of texts for the draft CPM Report to WRC-27 � Chair, CPM-27 2024-07-09
[ 44 ]
Liaison statement to ITU-T Study Group 17 and ITU-R Working Parties 4B and 5D - Terms and definitions related to IMT-2020 (5G) technology � CCT 2024-06-27
[ 43 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 4B, 5A, 5B, 5C, 6B and 7C for information) - WRC-27 agenda item 1.4 � WP 3M AI1.4 2024-06-12
[ 42 ]
Reply liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A,7B, 7C and 7D for information) - Studies under WRC-27 agenda items 1.11, 1.12, 1.13 and 1.14 � WPs 3L and 3M AI1.14, AI1.13, AI1.12, AI1.11 2024-06-12
[ 41 ]
Reply liaison statement to Working Party 5C (copy to Working Parties 1A, 4A, 4B, 4C, 5A, 5B, 6A, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10 � WPs 3J and 3M AI1.10 2024-06-11
[ 40 ]
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5D, 6A, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.13 � WP 5C AI1.13 2024-05-29
[ 39 ]
Liaison statement to Working parties 4A, 4C, 5A, 5B, 3J and 3M (copy to Working Parties 1A, 4B, 6A, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10 � WP 5C AI1.10 2024-05-29
[ 38 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 5A, 5B, 6B, AND 7C for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.4 � WP 5C AI1.4 2024-05-29
[ 37 ]
Liaison statement to Working Parties 3M, 5A, 5B, 5C, 6B and 7C (copy to Working Party 4B for information) - WRC-27 agenda item 1.4 � WP 4A AI1.4 2024-05-13
[ 36 ]
Liaison statement on guidance on KPIs for monitoring QoS of broadband services provided via low-Earth orbit satellites � ITU-T SG12 2024-05-02
[ 35 ]
Liaison statement to Working Parties 3L, 4B, 5A, 5C, 5D, 7B, and 7C (copy to Working Party 4A for information, and action if any) - Relevant technical information to support studies under WRC-27 agenda item 1.14 � WP 4C AI1.14 2024-05-02
[ 34 ]
Liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Technical information to support the studies for WRC-27 agenda item 1.13 � WP 4C AI1.13 2024-05-02
[ 33 ]
Liaison statement to Working Parties 3L, 3M, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 7D (copy to Working Party 4A for information, and action if any) - Relevant technical information to support studies under WRC-27 agenda item 1.12 � WP 4C AI1.12 2024-05-01
[ 32 ]
Liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 7D - WRC-27 agenda item 1.11 � WP 4C AI1.11 2024-05-01
[ 31 ]
+Ann.1-15
Report on the fifty-fourth meeting of Working Party 4B (Geneva, 29 April - 3 May 2024) � Chair, WP 4B 2024-05-01
[ 30 ]
Final list of participants Working Party 4B (Geneva, 29 April - 3 May 2024) � Director, BR 2024-05-01
[ 29 ]
List of documents issued (Documents 4B/1 - 4B/29) � BR, Study Groups Department 2024-04-26
[ 28 ]
Tentative plans for the 2023-2027 Study Group cycle � Chair, WP 4B 2024-04-26
[ 27 ]
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups) � Chair, CCV 2024-04-22
[ 26 ]
Interim evaluation Report of the 3GPP candidate for the satellite component of IMT-2020 � Director, BR 2024-04-18
[ 25 ]
Considerations on the possible future development of low data rate MSS systems related to WRC-27 agenda item 1.12 � Canada , Norway AI1.12 2024-04-17
[ 24 ]
Working document towards possible revisions of Recommendations ITU-R S.2131 and ITU-R S.1806 � Globalstar, Inc. (United States) 2024-04-16
[ 23 ]
Interim evaluation analysis from ATIS WTSC IMT-2020 Independent Evaluation Group on the 3GPP submission(s) toward IMT-2020 Satellite component technologies � Alliance for Telecommunications Industry Solutions (ATIS) 2024-04-16
[ 22 ]
Preliminary evaluation report on the proposed candidate IMT-2020 satellite radio interface technology in Document IMT-2020-SAT/4 � ETSI 2024-04-16
[ 21 ]
Workplan for development of a new Report ITU-R M.[SAT IOT] � Russian Federation 2024-04-11
[ 20 ]
Proposal on working document towards a preliminary draft new Report ITU-R M.[SAT IOT] - Technical and operational aspects of satellite Internet of Things (IoT) applications � Russian Federation 2024-04-11
[ 19 ]
Working document towards a preliminary draft new Recommendation/Report on candidate network architectures and their impacts on performance objectives for mobile-satellite service systems with on-board processing � Korea (Rep. of) Q218/4 2024-04-11
[ 18 ]
Proposed workplan for the future development of satellite IMT-2030 � Korea (Rep. of) , France 2024-04-11
[ 17 ]
Liaison statement on consent of draft new Recommendation ITU-T Y.3207 (ex Y.FMSC-INCA) - Fixed, mobile and satellite convergence - Integrated network control architecture framework for IMT-2020 networks and beyond � ITU-T SG13 2024-04-11
[ 16 ]
Liaison statement on agreement of new Supplement 81 to ITU-T Y.3200-Series (ex Y.Sat-Use-Cases) - Use cases of satellite communications in developing countries � ITU-T SG13 2024-04-11
[ 15 ]
Preliminary evaluation Report on the proposed candidate IMT-2020 satellite radio interface technology in Document IMT-2020-SAT/4 � Director, BR 2024-04-11
[ 14 ]
Liaison statement to Working Party 4B - Terms of Reference of a rapporteur on BSS � WP 6B 2024-03-21
[ 13 ]
Note to CPM Steering Committee (copy to Working Parties 3M, 4B, 5A, 5B, 5C and 7C) - WRC-27 agenda item 1.4 � Acting Chair, WP 6B AI1.4 2024-03-20
[ 12 ]
Liaison statement to Working Parties 4B and 6B - Revision of Recommendation ITU-R BT./BO.1774-2 � WP 6A 2024-03-18
[ 11 ]
Liaison statement to Working Party 4A (copy to Working Parties 1B, 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - WRC-27 agenda item 1.6 � WP 6A AI1.6 2024-03-18
[ 10 ]
Liaison statement to Working Party 5C (copy to Working Parties 1A, 3J, 3M, 4A, 4B, 4C, 5A, 5B, 7C and 7D for information) - WRC-27 agenda item 1.10 � WP 6A AI1.10 2024-03-18
[ 9 ]
Liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.13 � WP 6A AI1.13 2024-03-18
[ 8 ]
Liaison statement to CPM Management Team (copy to Working Parties 3L, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.11 � WP 6A AI1.11 2024-03-18
[ 7 ]
Text from WRC-23 Plenary for the attention of the ITU-R Working Parties that are either responsible for or contributing to studies relevant to items of the WRC-27 agenda or the WRC-31 preliminary agenda � Director, BR 2024-01-30
[ 6 ]
+Ann.1-4
Report on the fifty-third-bis meeting of Working Party 4B (Virtual Meeting, 23 January 2024) � Chair, WP 4B 2024-01-24
[ 5 ]
Final list of participants - Working Party 4B (e-Meeting, 23 January 2024) � Director, BR 2024-01-24
[ 4 ]
3GPP technology submission of 3GPP 5G NTN solutions for the satellite component of IMT-2020 � Alliance for Telecommunications Industry Solutions 2023-12-19
[ 3 ]
Liasion statement on the consent of draft new Recommendation ITU-T Y.3205 (ex Y.FMSC-IUSU-req) - Fixed, mobile and satellite convergence - Requirements of integrated user centric service units � ITU-T SG13 2023-12-19
[ 2 ]
Liaison statement on the consent of draft new Recommendation ITU-T Y.3206 (ex Y.FMSC-CE) - Fixed, mobile and satellite convergence - Capability exposure for IMT-2020 networks and beyond � ITU-T SG13 2023-12-19
[ 1 ]
Documents to be carried over from the 2019-2023 Study Period � WP 4B 2023-11-29
Results:100 total items.
Result page:� Previous�-� 1 - 2
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2024-12-20