International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : R23-WP4A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�R23-WP4A� C�

ITU-R�R23-WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:358 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 308 ]
MEO Earth station parameters for studies to be conducted under WRC-27 agenda item 1.3 � Intelsat AI1.3 2024-10-09
[ 307 ]
Proposed technical parameters for WRC-27 agenda item 1.1 � Intelsat AI1.1 2024-10-09
[ 306 ]
Proposed topic to be considered under WRC-27 agenda item 7 - To develop possible regulatory measures to implement RR No. 4.4 � France , Montenegro , Serbia AI7 2024-10-09
[ 305 ]
Proposed topic to be considered under WRC-27 agenda item 7 - To define the required capability of a space station to satisfy the requirements of the conditions specified in the provisions of RR Nos. 11.44B, 11.44C, 11.44D and 11.44E � France , Montenegro AI7 2024-10-09
[ 304 ]
Draft reply liaison statement to Working Party 7D - WRC-27 agenda item 1.16 � Canada AI1.16 2024-10-08
[ 303 ]
Assessment of RR Article 22 epfd limits for the protection of GSO FSS links when taking into account proportional activity presence of multiple non-GSO FSS system � Canada 2024-10-08
[ 302 ]
General thoughts related to the work on Resolution 74 (Rev.WRC-03) � Canada 2024-10-08
[ 301 ]
Working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO-[NGSO/GSO]] - Methodology to assess average degradation in throughput and increase in unavailability for a non-geostationary system, due to the interference caused by another non-geostationary system operating co-frequency � Canada 2024-10-08
[ 300 ]
Proposed updates to working document towards a preliminary draft new Recommendation ITU-R S.[AGGREGATE EPFD KA KU] � Canada 2024-10-08
[ 299 ]
Elements for consideration in working document towards a preliminary draft new Recommendation ITU-R S.[AGGREGATE EPFD KA KU] � Canada 2024-10-08
[ 298 ]
Proposed topic to be considered under WRC-27 agenda item 7 - Improved information gathering under Resolution 40 (Rev.WRC-19) � Canada AI7 2024-10-08
[ 297 ]
Proposed topic to be considered under WRC-27 agenda item 7 - Proposed Modification to RR Appendix 4 � Canada AI7 2024-10-08
[ 296 ]
Proposed updates to Annex 4 to Working Party 4A Chair's Report - Working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space) � Canada AI1.2 2024-10-08
[ 295 ]
Proposal to submit a note to the Director of the Radiocommunication Bureau with respect to the application of the rule of procedures under RR Nos. 9.27 and 11.43B in case of modification of a frequency assignment to a non-GSO system � Tonga 2024-10-09
[ 294 ]
Reply liaison statement to Working Parties 7C and 7D on WRC-27 agenda item 1.18 � Tonga AI1.18 2024-10-09
[ 293 ]
Comments on revision to Recommendation ITU-R S.1503 and associated studies on RR Article 22 epfd limits � India 2024-10-09
[ 292 ]
Proposed topic under WRC-27 agenda item 7 - New Appendix 4 data items for geostationary (GSO) satellite networks in the fixed-satellite service (FSS) or broadcasting-satellite service (BSS) in Ka, V, Q bands and above, not subject to a plan � African Telecommunications Union AI7 2024-10-09
[ 291 ]
Proposed topic under WRC-27 agenda item 7 - Exclusion of the territory of a country from the service area of a geostationary satellite network (GSO) in the fixed-satellite service (FSS) or mobile-satellite service (MSS) in a frequency band not subject to a plan � African Telecommunications Union AI7 2024-10-09
[ 290 ]
WRC-27 agenda item 1.6 � African Telecommunications Union AI1.6 2024-10-09
[ 289 ]
Studies for inclusion in the working document on WRC-27 agenda item 1.2 - Update to working document on WRC-27 agenda item 1.2 � Papua New Guinea , India , Indonesia , Thailand AI1.2 2024-10-09
[ 288 ]
Reply liaison statement to Working Party 5B (copy to Working Parties 3M, 5A, 5C, 7A, 7B and 7C) � Papua New Guinea AI1.2 2024-10-09
[ 287 ]
Proposal to the working document towards a preliminary draft new Report ITU-R S.[MITIGATION MEASURES] � Papua New Guinea 2024-10-09
[ 286 ]
Proposals regarding the preliminary draft table of contents of the Handbook on best practices for the sustainable use of frequencies and associated non-GSO orbits by space radiocommunication services � International Organization of Space Communications - INTERSPUTNIK 2024-10-08
[ 285 ]
Proposals regarding the draft table of contents of the Handbook on Satellite Communications � International Organization of Space Communications - INTERSPUTNIK 2024-10-08
[ 284 ]
Working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO-NGSO] - Methodology to assess average degradation in throughput and increase in unavailability for a non-geostationary system, due to the interference caused by another non-geostationary system operating co-frequency[, for frequency ranges between 10.7 GHz and 52.4 GHz] � United States 2024-10-09
[ 283 ]
Proposed revisions to working document towards a preliminary draft new Report ITU-R S.[INTERFERENCE-NGSO-NGSO/GSO-STUDIES] and working document towards a preliminary draft new Recommendation ITU-R S.[NON-GSO-MODELING] � United States 2024-10-09
[ 282 ]
Working document towards a preliminary draft new Report ITU-R [ARTICLE 22 EPFD LIMIT STUDIES] � United States 2024-10-09
[ 281 ]
Elements of working document relating to WRC-27 agenda item 1.3 - Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space) � United States AI1.3 2024-10-09
[ 280 ]
Proposed draft CPM text for WRC-27 agenda item 1.3 � Egypt AI1.3 2024-10-09
[ 279 ]
Proposed draft CPM text for WRC-27 agenda item 1.2 � Egypt AI1.2 2024-10-09
[ 278 ]
Proposed modifications to the elements on a working document related to the operation and functionalities of NCMC for ESIMs � Egypt 2024-10-09
[ 277 ]
Proposed modifications to the working document regarding WRC-27 agenda item 1.1 � Egypt AI1.1 2024-10-09
[ 276 ]
Proposed modifications to the working document regarding WRC-27 agenda item 1.3 � Egypt AI1.3 2024-10-09
[ 275 ]
Elements towards a working document on WRC-27 agenda item 1.5 � Egypt AI1.5 2024-10-09
[ 274 ]
Proposal regarding consideration of possible topic on repeated suspension and bringing back into use of frequency assignments under WRC-27 agenda item 7 � Asia Satellite Telecommunications Co. Ltd. (AsiaSat) AI7 2024-10-09
[ 273 ]
Inapplicability of the Resolution 770 (Rev.WRC-23) methodology for ESIMs � Viasat, Inc. AI1.1 2024-10-08
[ 272 ]
Study on Recommendation ITU-R S.1428 antenna pattern for non-GSO EPFD calculation � Viasat, Inc. 2024-10-09
[ 271 ]
Optimisation of non-GSO systems under existing epfd limits � Viasat, Inc. 2024-10-09
[ 270 ]
Long term interference from non-GSO systems into Ka-band geostationary networks based on proposed use of average throughput degradation criteria � Viasat, Inc. 2024-10-08
[ 269 ]
Technical comments on Resolution 770 (Rev.WRC-23) methodology for protection of GSO networks from non-GSO interference � Viasat, Inc. AI1.3, AI1.1 2024-10-08
[ 268 ]
Working document towards a preliminary draft new Recommendation ITU-R S.[NON-GSO-MODELING] - Modelling and simulation of non-GSO FSS systems for use in sharing and compatibility studies � Viasat, Inc. 2024-10-08
[ 267 ]
Amendments to information document in response to WRC-23 minutes on RR Article 22 epfd studies without any regulatory consequences � Viasat, Inc. 2024-10-08
[ 266 ]
Comments on working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO-NGSO] � Viasat, Inc. 2024-10-08
[ 265 ]
Working document towards a preliminary draft new Recommendation ITU-R S.[AGGREGATE EPFD KA KU] - Methodology for evaluating aggregate equivalent power flux-density into geostationary satellite networks in the fixed-satellite service from multiple non-geostationary satellite systems in the Ku and Ka frequency bands � Viasat, Inc 2024-10-08
[ 264 ]
Proposed updates to elements of working document on WRC-27 agenda item 1.4 � SES AI1.4 2024-10-09
[ 263 ]
Working document on mitigation measures between IMT and FSS in the frequency band 3 400-3 600 MHz � GSM Association 2024-10-09
[ 262 ]
Proposed elements towards the working document on Radio Regulations Article 22 epfd limits � Burundi , Cameroon , Central African Rep. , Chad , Congo (Rep. of the) , Dem. Rep. of the Congo , Equatorial Guinea , Gabon , Sao Tome and Principe 2024-10-08
[ 261 ]
Proposed preliminary values for ESIMs parameters to be considered and used for studies under WRC-27 agenda item 1.1 � Luxembourg AI1.1 2024-10-08
[ 260 ]
Impact of distribution chosen on the algorithm for the update of Recommendation ITU-R S.1428 � Luxembourg 2024-10-08
[ 259 ]
Elements on Ku GSO networks protection � Luxembourg 2024-10-08
Results:358 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-01-08