Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 37 ]
�
� |
A solution to the problem in harmonization of the troposcatter transmission loss prediction model
�
� |
China
� |
� |
2024-05-16 |
|
[ 36 ]
�
� |
Discussion document about Recommendation ITU-R P.453-14
�
� |
China
� |
� |
2024-05-16 |
|
[ 35 ]
�
� |
Proposed revision to Recommendation ITU-R P.1409-3 - Propagation data and prediction methods for systems using high altitude platform stations and other elevated stations in the stratosphere at frequencies greater than about 0.7 GHz
�
� |
Japan
� |
� |
2024-05-16 |
|
[ 34 ]
�
� |
Proposed revision to Recommendation ITU-R P.1410-6 - Propagation data and prediction methods required for the design of terrestrial broadband radio access systems operating in a frequency range from 3 GHz to 60 GHz
�
� |
Japan
� |
� |
2024-05-16 |
|
[ 33 ]
�
� |
Support document for Annex 10 to Document 3K/335 - Prediction of building entry loss
�
� |
Japan
� |
� |
2024-05-16 |
|
[ 32 ]
�
� |
Contribution to Recommendation ITU-R P.1238-12 - Basic transmission loss and delay spread in conference room LoS scenarios at 154 and 300 GHz
�
� |
Japan
� |
� |
2024-05-16 |
|
[ 31 ]
�
� |
Contribution to Recommendation ITU-R P.1238-12 - Basic transmission loss and delay spread in corridor LoS scenarios at 300 GHz
�
� |
Japan
� |
� |
2024-05-16 |
|
[ 30 ]
�
� |
Discussion document on measurement and prediction of dynamic obstacle gain of human body at 300 GHz band
�
� |
Japan
� |
� |
2024-05-16 |
|
[ 29 ]
�
� |
Support document for item 8 in Annex 8 to Document 3K/264 - Validation results of visibility-probability-estimation method by using diigital building database
�
� |
Japan
� |
� |
2024-05-16 |
|
[ 28 ]
�
� |
Discussion document - 158 GHz massive-MIMO channel sounder
�
� |
Japan
� |
� |
2024-05-16 |
|
[ 27 ]
�
� |
Support document for Annex 13 to Document 3K/335 - Prediction of clutter loss
�
� |
SoftBank Corporation (Japan)
� |
� |
2024-05-16 |
|
[ 26 ]
�
� |
Proposed revision of Recommendation ITU-R P.617-5 troposcatter model and consequent proposed revisions to Recommendations ITU-R P.452-18, ITU-R P.1812-7 and ITU-R P.2001-5 - Propagation prediction techniques and data required for the design of trans-horizon radio-relay systems
�
� |
Australia
� |
� |
2024-05-16 |
|
[ 25 ]
�
� |
Report on the activities of Correspondence Group 3K-3M-12 - Prediction of clutter loss up to 105 GHz
�
� |
Chairs, CG 3K-3M-12
� |
� |
2024-05-15 |
|
[ 24 ]
�
� |
Discussion document on dual channel troposcatter measurement system utilized in Colorado, USA
�
� |
United States
� |
� |
2024-05-13 |
|
[ 23 ]
�
� |
Contribution of 3.5 GHz clutter measurements in Salt Lake City, Utah to the Study Group 3 databank
�
� |
United States
� |
� |
2024-05-13 |
|
[ 22 ]
�
� |
Contribution of 3.5 GHz clutter measurements in Denver, Colorado to the Study Group 3 databank
�
� |
United States
� |
� |
2024-05-13 |
|
[ 21 ]
�
� |
Contribution of 3.5 GHz Clutter Measurements in Boulder, Colorado to the Study Group 3 Databank
�
� |
United States
� |
� |
2024-05-13 |
|
[ 20 ]
�
� |
Discussion document on a new 3.1 to 4.2 GHz Multi-Transmitter Continuous-wave mobile Measurement System being used for propagation studies in the USA
�
� |
United States
� |
� |
2024-05-13 |
|
[ 19 ]
�
� |
Working document toward a preliminary draft revision of HDB-58 - Update of Handbook 58 on ITU-R propagation prediction methods for interference and sharing studies
�
� |
United States
� |
� |
2024-05-13 |
|
[ 18 ]
�
� |
Correspondence Group 3J-3K-3M-14 Activity Report - Issues relating to the HAPS propagation model
�
� |
Chair, CG 3J-3K-3M-14
� |
� |
2024-05-14 |
|
[ 17 ]
�
� |
Activity Report of Correspondence Group 3M-4 - Software products, digital maps and reference numerical data products
�
� |
CG 3M-4
� |
� |
2024-05-14 |
|
[ 16 ]
�
� |
Activity Report of Correspondence Group 3J-3K-3M-16 - The atmospheric radio refractive index and its effects on radiowave propagation
�
� |
CG 3J-3K-3M-16
� |
� |
2024-05-14 |
|
[ 15 ]
�
� |
Activity Report of Correspondence Group 3K-3M-18 - Specific issues common to Recommendations ITU-R P.452, ITU-R P.1812, or ITU-R P.2001
�
� |
Chair, CG 3K-3M-18
� |
� |
2024-05-13 |
|
[ 14 ]
�
� |
Correspondence Group 3K-6 Activity Report - Propagation models and characteristics for higher frequencies
�
� |
Chair, CG 3K-6
� |
� |
2024-05-13 |
|
[ 13 ]
�
� |
Correspondence Group 3K-24 Activity Report - Estimation model of line-of-sight probability
�
� |
Acting Chair, CG 3K-24
� |
� |
2024-05-09 |
|
[ 12 ]
�
� |
Correspondence Group 3K-21 Activity Report - Human blockage
�
� |
Acting Chair, CG 3K-21
� |
� |
2024-05-07 |
|
[ 11 ]
�
� |
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)
�
� |
Chair, CCV
� |
� |
2024-04-22 |
|
[ 10 ]
�
� |
Liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D) - WRC-27 agenda item 1.7
�
� |
WP 7B
� |
AI1.7
� |
2024-03-27 |
|
[ 9 ]
�
� |
Liaison statement out to key SDOs on the publication of GR THz 001 and GR THz 002
�
� |
ETSI
� |
� |
2024-03-27 |
|
[ 8 ]
�
� |
Liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C and 7D for information) - Information on active and passive sensors in the EESS for WRC-27 agenda item 1.8
�
� |
WP 7C
� |
AI1.8
� |
2024-03-26 |
|
[ 7 ]
�
� |
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B and 7D for information) - WRC-27 agenda item 1.7
�
� |
WP 7C
� |
AI1.7
� |
2024-03-25 |
|
[ 6 ]
�
� |
Troposcatter transmission loss prediction model in Recommendations ITU-R P.452, ITU-R P.1812 and ITU-R P.2001
�
� |
Chairs, WPs 3K & 3M and Report from CG 3K-3M-18
� |
� |
2024-02-26 |
|
[ 5 ]
�
� |
Liaison statement to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D - Relevant technical information to support studies under WRC-27 agenda item 1.7
�
� |
WP 5D
� |
AI1.7
� |
2024-02-13 |
|
[ 4 ]
�
� |
Response liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3J, 3K and 3M) - Considerations on draft Recommendation ITU-T K.DMEI of ITU-T Study Group 5
�
� |
WP 5D
� |
� |
2024-02-09 |
|
[ 3 ]
�
� |
Text from WRC-23 Plenary for the attention of the ITU-R Working Parties that are either responsible for or contributing to studies relevant to items of the WRC-27 agenda or the WRC-31 preliminary agenda
�
� |
Director, BR
� |
� |
2024-01-30 |
|
[ 2 ]
�
� |
Liaison statement on draft Recommendation ITU-T K.DMEI - Determination and mitigation of electromagnetic interference between base stations due to tropospheric radio-duct
�
� |
ITU-T SG5
� |
� |
2023-12-21 |
|
[ 1 ]
�
� |
Documents to be carried over from the 2019-2023 Study Period
�
� |
WP 3K
� |
� |
2023-12-06 |
Results:87 total items. Result page:�
Previous�-�
1 -
2
� |
Multiple Document Download:�Formats and Languages to be included (when available):