International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : R23-WP3J : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�R23-WP3J� C�

ITU-R�R23-WP3J

Propagation Fundamentals

Results:79 total items.
Result page:� Previous�-� 1 - 2
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 29 ]
Working document toward a preliminary draft revision of HDB-58 - Update of Handbook 58 on ITU-R propagation prediction methods for interference and sharing studies � United States 2024-05-13
[ 28 ]
Update to Working Party 3J Chairman's Report Document 3J/301, Annex 24 - Recommendation ITU-R P.834-6 � United States 2024-05-13
[ 27 ]
Update to Working Party 3J Chairman's Report Document 3J/301, Annex 14 - Recommendation ITU-R P.676-13 � United States 2024-05-13
[ 26 ]
Working document towards a draft reply liaison statement to Working Party 7B - WRC-27 agenda item 1.15 � United States AI1.15 2024-05-13
[ 25 ]
Activity Report of Correspondence Group 3M-4 - Software products, digital maps and reference numerical data products � CG 3M-4 2024-05-14
[ 24 ]
Activity Report of Correspondence Group 3J-3K-3M-16 - The atmospheric radio refractive index and its effects on radiowave propagation � CG 3J-3K-3M-16 2024-05-14
[ 23 ]
Proposed draft new Terms of Reference of Correspondence Group 3J-XX - Lunar radio frequency propagation � United States 2024-05-13
[ 22 ]
Working document toward a preliminary draft new Fascicle ITU-R 3J/FAS/[LUNAR_RF_PROPAGATION] � United States 2024-05-13
[ 21 ]
Activity Report of Correspondence Group 3J-3M-5 - Effect of clouds and precipitation on attenuation and depolarization on slant paths � CG 3J-3M-5 2024-05-14
[ 20 ]
Correspondence Group 3J-23 activity Report - General slant path terrain diffraction model � Chair, CG 3J-23 2024-05-09
[ 19 ]
New data for DBSG3 Table II-1 - Three years of Alphasat attenuation statistics in Tito Scalo and Spino d'Adda � Italy 2024-05-07
[ 18 ]
Liaison statement to Working Parties 3M, 4A, 5A, 5B, 5C, 5D, 7A and 7B (copy to ICAO for information) - WRC-27 agenda item 1.19 � WP 7C AI1.19 2024-05-07
[ 17 ]
Report on activities during April 2023 to April 2024 � CG 3J-11 2024-05-07
[ 16 ]
Preliminary draft revision of Recommendation ITU-R P.835-6 - Reference standard atmospheres � CG 3J-11 2024-05-07
[ 15 ]
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups) � Chair, CCV 2024-04-22
[ 14 ]
Liaison statement to Working Parties 4A and 4C (copy to Working Parties 3J, 3M, 5A, 5B, and 5C for information) - WRC-27 agenda item 1.18 � WP 7D AI1.18 2024-03-28
[ 13 ]
Liaison statement to Working Parties 4A, 4C and 5A (copy to Working Parties 1B, 3J, 3M, 5B and 5D for information) - WRC-27 agenda item 1.16 � WP 7D AI1.16 2024-03-28
[ 12 ]
Liaison statement to Working Parties 3J and 3M (copy to Working Parties 1B, 4A, 4C, 5A, 5B, and 5D for information) on WRC-27 agenda items 1.16 and 1.18 � WP 7D AI1.18, AI1.16 2024-03-28
[ 11 ]
Liaison statement for action to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D, and for information to Working Party 1B - Relevant technical information to support studies under WRC-27 agenda item 1.15 � WP 7B AI1.15 2024-03-27
[ 10 ]
Liaison statement out to key SDOs on the publication of GR THz 001 and GR THz 002 � ETSI 2024-03-27
[ 9 ]
Liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C and 7D for information) - Information on active and passive sensors in the EESS for WRC-27 agenda item 1.8 � WP 7C AI1.8 2024-03-26
[ 8 ]
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4C, 5A, 5B, 3J and 3M) - Relevant technical information to support studies under WRC-27 agenda item 1.18 � WP 7C AI1.18 2024-03-25
[ 7 ]
Liaison statement to Working Parties 3J, 3M (copy to Working Parties 4A, 4C, 5A, 5B and 5C) - Propagation aspects related to WRC-27 agenda item 1.18 � WP 7C AI1.18 2024-03-25
[ 6 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B (copy to Working Parties 5C, 3J and 3M) - Relevant technical information to support studies under WRC-27 agenda item 1.18 � WP 7C AI1.18 2024-03-25
[ 5 ]
Liaison statement to Working Party 5C (copy to Working Parties 1A, 3J, 3M, 4A, 4B, 4C, 5A, 5B, 7C and 7D for information) - WRC-27 agenda item 1.10 � WP 6A AI1.10 2024-03-18
[ 4 ]
Response liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3J, 3K and 3M) - Considerations on draft Recommendation ITU-T K.DMEI of ITU-T Study Group 5 � WP 5D 2024-02-09
[ 3 ]
Text from WRC-23 Plenary for the attention of the ITU-R Working Parties that are either responsible for or contributing to studies relevant to items of the WRC-27 agenda or the WRC-31 preliminary agenda � Director, BR 2024-01-30
[ 2 ]
Liaison statement on draft Recommendation ITU-T K.DMEI - Determination and mitigation of electromagnetic interference between base stations due to tropospheric radio-duct � ITU-T SG5 2023-12-21
[ 1 ]
Documents to be carried over from the 2019-2023 Study Period � WP 3J 2023-12-06
Results:79 total items.
Result page:� Previous�-� 1 - 2
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-01-03