International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP5C : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP5C� C�

ITU-R�WP5C

Fixed wireless systems; HF and other systems below 30 MHz in the fixed and land mobile services

Results:401 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 351 ]
Liaison statement from ITU-D Study Group 2 Question 1/2 to ITU-T Study Groups 3, 5, 12, 13, 15, 16, 17, 20 FG-AI4A, ITU-R Study Groups 3, 4, 6, ITU-R Working Parties 1B, 5A, 5C, and 5D on new Question 1/2 and collaboration � ITU-D SG 2 2022-12-20
[ 350 ]
Liaison statement from ITU-D Study Group 1 Question 3/1 to all related Study Groups of ITU-T, all related Working Parties of ITU-R, APT and ETSI on disaster risk reduction and management � ITU-D SG 1 2022-12-20
[ 349 ]
Revising Recommendation ITU-R V.431-8 - Nomenclature: Number 12, THF 300 to 3 000 GHz, Terametric waves � ATDI Q228/3 2022-11-21
[ 348 ]
Reply liaison statement to Working Party 5C (copy to Working Party 5D and ITU-T Study Group 15 for information) - Working document towards a preliminary draft new Report ITU-R M.[UTILITIES] on Utility Radiocommunication Systems Operating in the Land Mobile Service � WP 5A 2022-11-28
[ 347 ]
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5C, 5D, 6A, 7C and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations � WP 5A 2022-11-28
[ 346 ]
Liaison statement to Working Parties 5C, 5D and 6A regarding a definition of PMSE � WP 5A 2022-11-25
[ 345 ]
+Ann.1-17
Report on the twenty-eighth meeting of Working Party 5C (Geneva, 14-25 November 2022) � Chairman, WP 5C 2022-11-23
[ 344 ]
Final list of participants - Working Party 5C (Geneva, 14-25 November 2022) � Director, BR 2022-11-23
[ 343 ]
Prediction methods for LOS MIMO microwave links � European Telecommunications Standards Institute 2022-11-23
[ 342 ]
Reply liaison statement to Working Party 1A (copy to Working Parties 5A and 5C for information) - Comments on preliminary draft revision of Report ITU-R SM.2449 � WP 5B 2022-11-21
[ 341 ]
(Rev.1)
List of documents issued (Documents 5C/291 - 5C/343) � BR, Study Groups Department 2022-11-14
[ 340 ]
Supporting material for the twenty-eighth meeting of Working Party 5C (14-24 November 2022) � Chairman, WP 5C 2022-11-10
[ 339 ]
Proposed modifications for a preliminary draft revision of Report ITU-R F.2416-0 - Technical and operational characteristics and applications of the point-to-point fixed service applications operating in the frequency band 275-450 GHz � ATDI Q257/5 2022-11-07
[ 338 ]
Response to the liaison statement from Working Party 1A on revision of Report ITU-R SM.2449 on WPT for portable and mobile devices � Germany (Federal Republic of) 2022-11-07
[ 337 ]
Working document towards a preliminary draft revision of Recommendation ITU-R F.758-7 - System parameters and considerations in the development of criteria for sharing or compatibility between digital fixed wireless systems in the fixed service and systems in other services and other sources of interference � France Q252/5 2022-11-07
[ 336 ]
Draft revision of Recommendation ITU-R F.1520-3 - Radio-frequency arrangements for systems in the fixed service operating in the band 31.8-33.4 GHz � France Q247/5 2022-11-06
[ 335 ]
Working document towards preliminary draft revision of Recommendation ITU-R F.1571 - Mitigation techniques for use in reducing the potential for interference between airborne stations in the radionavigation service and stations in the fixed service in the band 31.8-33.4 GHz � France 2022-11-06
[ 334 ]
Proposal to progress the working document towards a preliminary draft new Recommendation ITU-R F.[EESS-PROTECTION] - Unwanted emission levels outside the allocated bands for FS systems operating in bands from 94.1 GHz to 174.8 GHz for the protection of EESS (passive) operating in adjacent bands where footnote RR No. 5.340 applies � Canada 2022-11-04
[ 333 ]
Proposed modifications for a preliminary draft revision of Report ITU-R F.2416-0 - Technical and operational characteristics and applications of the point-to-point fixed service applications operating in the frequency band 275-450 GHz � Canada 2022-11-04
[ 332 ]
Adding symbol to the ninth ITU Radio Regulations band and revising Recommendation ITU-R V.431-8 - Nomenclature: Number 12, THF 300 to 3 000 GHz, Decimillimetric waves � ATDI Q228/3 2022-11-02
[ 331 ]
Preliminary review of the Questions assigned to Working Party 5C � Japan 2022-11-02
[ 330 ]
Proposed modifications to working document towards a preliminary draft revision of Report ITU-R F.2323-1 - Fixed service use and future trends � Japan 2022-11-02
[ 329 ]
Proposed modifications to working document towards a preliminary draft revision of Recommendation ITU-R F.758-7 - System parameters and considerations in the development of criteria for sharing or compatibility between digital fixed wireless systems in the fixed service and systems in other services and other sources of interference � Japan 2022-11-02
[ 328 ]
Proposal for a preliminary draft revision of Report ITU-R F.2416-0 - Technical and operational characteristics and applications of the point-to-point fixed service applications operating in the frequency band 275-450 GHz � Japan Q257/5 2022-11-02
[ 327 ]
Working document towards a preliminary draft revision to Recommendation ITU-R F.1762 - Characteristics of enhanced applications for high frequency (HF) radiocommunication systems � United States of America 2022-10-31
[ 326 ]
Working document towards a preliminary draft revision to Recommendation ITU-R F.1821 - Characteristics of advanced digital high frequency (HF) radiocommunication systems � United States of America 2022-10-31
[ 325 ]
Working document towards a preliminary draft new Handbook ITU-R [HF ADAPTIVE TUTORIAL] - A tutorial on frequency adaptive communication systems in the HF bands � United States of America 2022-10-31
[ 324 ]
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5A, 5C, 6A and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations � WP 5D 2022-10-28
[ 323 ]
Note to ITU-R Study Group 5 (copy to Working Parties 5A and 5C) - Proposed reply liaison statement to ITU-T Study Group 11 � WP 5D 2022-10-28
[ 322 ]
Working document towards a preliminary draft new Report ITU-R SA.[15 GHz SRS SHARING] - Sharing and Compatibility Studies for the SRS in the band 14.8-15.35 GHz � Egypt (Arab Republic of) AI1.13 2022-10-19
[ 321 ]
Reply liaison statement to Working Parties 5A and 5C (copy to Working Parties 3M, 5B and 7C for information) - WRC-23 agenda item 1.15 activities � WP 4A 2022-10-19
[ 320 ]
Reply liaison statement to Working Party 5C -Adjacent band compatibility between fixed service and EESS (passive) systems operating in bands above 92 GHz and up to 174.8 GHz � WP 7C 2022-10-17
[ 319 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, and 7D - WRC-23 agenda item 1.14 activities � WP 7C AI1.14 2022-10-14
[ 318 ]
Liaison statement on the new version of the Home Network Transport (HNT) standards overview and work plan � ITU-T SG 15 2022-10-14
[ 317 ]
Liaison statement on the new version of the Access Network Transport (ANT) standards overview and work plan � ITU-T SG 15 2022-10-14
[ 316 ]
Liaison statement to Working Parties 5A, 5B, 5C, 6A, 7B (copy to Working Parties 3K, 3L, 3M for information) - Progress report on the activities relating to WRC-23 agenda item 1.12 � WP 7C AI1.12 2022-10-13
[ 315 ]
Liaison statement to Working Parties 3K, 3M, 4A, 5A, 5B, 5C, 7C and 7D - Report on progress of activities relating to agenda item 1.13 (WRC-23) � WP 7B AI1.13 2022-10-11
[ 314 ]
Reply liaison statement to Working Party 3M (copy to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D for information) - Future development of P-series Recommendations to address frequencies above 100 GHz � PW 7C 2022-10-07
[ 313 ]
Reply liaison statement to Working Party 3M (copy to Working Parties 3J, 3K, 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, and 7C - Extending the application of propagation Recommendations to frequencies greater than 100 GHz � WP 7D 2022-10-06
[ 312 ]
Note to the Chairmen of Working Parties 5D and 6A (copy to the Chairmen of Working Parties 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D for information) - WRC-23 agenda item 1.4 � Chairmen, WPs 3J, 3K and 3M AI1.4 2022-10-06
[ 311 ]
Liaison statement to Working Party 7C (copy to Working Parties 3K, 3L, 3M, 5A, 5B, and 5C) - WRC-23 agenda item 1.12 � WP 6A AI1.12 2022-09-28
[ 310 ]
Reply liaison statement to Working Party 5D (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D for information) - WRC-23 agenda item 1.4 � WP 6A AI1.4 2022-09-28
[ 309 ]
Preliminary position on WRC-23 Agenda � World Meteorological Organization 2022-09-20
[ 308 ]
Liaison statement to Working Party 3M (copy to Working Parties 1A, 1B, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Extending the application of propagation Recommendations to frequencies greater than 100 GHz � WP 4B 2022-09-19
[ 307 ]
Revision of Recommendation ITU-R F.699-8 - Updating upper limit frequency: 330 GHz instead of 86 GHz � ATDI Q257/5, Q110/5 2022-08-22
[ 306 ]
Liaison statement to Working Parties 5A, 5B, 5C and 7A (copy to Working Party 6A for information) - Preliminary draft revision of Report ITU-R SM.2449-0 � WP 1A 2022-07-11
[ 305 ]
Liaison statement to Working Parties 5A, 5B, 5C, and 5D (copy to Working Parties 7C and 7D for information) - Draft revision of Report ITU-R SM.2352-0 � WP 1A 2022-07-11
[ 304 ]
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D - WRC-23 agenda item 1.4 � WP 5D AI1.4 2022-07-01
[ 303 ]
Liaison statement to ITU-R Study Groups - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations � CCT 2022-06-30
[ 302 ]
Reply liaison statement to Working Party 7C (copy to Working Parties 4A, 4C, 5B, 5C, and 7D for information) - WRC-23 agenda item 1.14 Activities � WP 5A AI1.14 2022-06-20
Results:401 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2023-10-19