International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP4B : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP4B� C�

ITU-R�WP4B

Systems, air interfaces, performance and availability objectives for FSS, BSS and MSS, including IP-based applications and satellite news gathering

Results:158 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 108 ]
Proposed modifications to the draft new Report ITU-R M.[XYZ.ABC] on vision and requirements for satellite radio interface(s) of IMT-2020 � EchoStar Operating LLC , Inmarsat Global Ltd. , Thales S.A. 2022-05-02
[ 107 ]
Process and timeline for IMT-2020 detailed specifications for the satellite radio interfaces � France 2022-04-29
[ 106 ]
Updates work plan for development of a preliminary draft new Report ITU-R M.[XYZ.ABC] � China (People's Republic of) 2022-04-29
[ 105 ]
Contributes to preliminary draft new Report ITU-R M.[XYZ.ABC] - Vision and requirements for satellite radio interface(s) of IMT-2020 � China (People's Republic of) 2022-04-29
[ 104 ]
Proposal for a preliminary draft revision of Report ITU-R BO.2397-0 - Satellite transmission for UHDTV satellite broadcasting � Japan Q292/4 2022-04-20
[ 103 ]
Liaison statement on the outcomes of the first meeting of the ITU-T Focus Group on Testbed Federations for IMT-2020 and beyond (FG-TBFXG) � ITU-T (FG -TBFxG) 2022-04-14
[ 102 ]
Report of activities of the Correspondence Group on satellite radio interface technologies for the satellite component of IMT-2020 � Chairman, CG on Satellite Radio Interface Techno. 2022-04-13
[ 101 ]
GASS 2021: Recent URSI Resolutions and Recommendation � Director, BR 2021-12-16
[ 100 ]
Liaison statement on invitation to review artificial intelligence standardization roadmap and provide missing or updated information � ITU-T SG 13 2021-12-15
[ 99 ]
(Rev.1)
Liaison statement on establishment of a new ITU-T Focus Group on testbeds federations for IMT-2020 and beyond (FG-TBFXG) and first meeting (virtual, 4 - 7 April 2022) � ITU-T SG 11 2021-12-15
[ 98 ]
Reply Liaison statement to Working Party 5A (copy for information to relevant parties) - Proposed suppression of the Compendium of ITU's work on Emergency Telecommunications � WP 5C 2021-11-26
[ 97 ]
Liaison statement to relevant entities - Suppression of the Compendium of ITU's work on Emergency Telecommunications � WP5A 2021-11-26
[ 96 ]
+Ann.1-7
Report on the meeting of Working Party 4B (25-29 October 2021) (Virtual Meeting) � Chairman, WP 4B 2021-10-29
[ 95 ]
Final list of participants - Working Party 4B (e-Meeting, 25-29 October 2021) � Director, BR 2021-10-29
[ 94 ]
Reply liaison statement to Working Party 5A (copy for information to relevant parties) - Proposed suppression of the Compendium of ITU'S work on Emergency Telecommunications � WP 4A 2021-10-29
[ 93 ]
List of documents issued (Documents 4B/79 - 4B/93) � BR Study Groups Department 2021-10-25
[ 92 ]
Liaison statement on establishment of a new ITU-T Focus Group on "Artificial Intelligence (AI) and internet of things (IOT) for digital agriculture" (FG-AI4A) � ITU-T SG 20 2021-10-22
[ 91 ]
Liaison statement to TDAG, ITU-D Study Groups 1 and 2, ITU-R Working Party 4B and ITU-T Study Group 13 � WP 5D 2021-10-19
[ 90 ]
Reply liaison statement to Working Party 5A (copy for information to relevant parties) - Proposed suppression of the Compendium of ITU's work on Emergency Telecommunications � WP 5D 2021-10-19
[ 89 ]
Elements for preliminary draft new Report ITU-R M.[XYZ.ABC] on vision and requirements for satellite radio interface(s) of IMT-2020 � EchoStar Operating LLC , Inmarsat Global Ltd. 2021-10-18
[ 88 ]
Proposals for the working document towards a preliminary draft new Report ITU-R M.[XYX.ABC] on Vision and requirements for satellite radio interface(s) of IMT-2020 � Russian Federation 2021-10-19
[ 87 ]
Working document towards a preliminary draft revision of Recommendation ITU-R S.2131-0 - Method for the determination of performance objectives for satellite hypothetical reference digital paths using adaptive coding and modulation � OneWeb 2021-10-17
[ 86 ]
Updates to the vision/requirements for the satellite radio interface(s) of IMT-2020 and associated work plan � United States of America 2021-10-15
[ 85 ]
3GPP answer to liaison statement on satellite IoT � Director, BR 2021-10-15
[ 84 ]
Elevation of preliminary draft revision of Recommendation ITU-R S.2131-0 to DRR � France 2021-10-15
[ 83 ]
Proposed working document of Report ITU-R M.[XYZ.ABC] on Vision and requirements for satellite radio interface(s) of IMT-2020 � China (People's Republic of) 2021-10-14
[ 82 ]
Proposed revision of working document towards preliminary draft revision of Report ITU-R BO.2397-0 - Satellite transmission for UHDTV satellite broadcasting � Japan Q292/4 2021-10-13
[ 81 ]
Report of activities of the Correspondence Group on Satellite Radio Interface Technologies for the Satellite Component of IMT-2020 � Chairman, CG on Satellite Radio Interface Techno. 2021-10-06
[ 80 ]
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D - Characteristics to be used for assessing interference to systems operating in the Earth exploration-satellite and meteorological-satellite services, and for conducting sharing studies � WP 7B 2021-09-16
[ 79 ]
+Ann.1-10
Report on the meeting of Working Party 4B (12-16 July 2021) (Virtual Meeting) � Chairman, WP 4B 2021-07-16
[ 78 ]
Final list of participants Working Party 4B, E-meeting 12-16 July 2021 � Director, BR 2021-07-16
[ 77 ]
Reply liaison statement to Working Party 7B (copy for information to Working Parties 3M, 4A, 4B, 5A, 5B, 5C, 5D and 7C) - Information for studies on WRC-23 agenda item 1.18 � WP 4C AI1.18 2021-07-14
[ 76 ]
Reply liaison statement to Working Parties 7C, 5A and 5B (Copy for information to Working Parties 3M, 4A, 4B, 5C, 5D and 7B) � WP 4C 2021-07-14
[ 75 ]
Reply liaison statement to Working Party 5A (copy for information to relevant parties) - Proposed suppression of the Compendium of ITU's work on Emergency Telecommunications � WP 4C 2021-07-14
[ 74 ]
List of documents issued (Documents 4B/50 - 4B/74) � BR, Study Groups Department 2021-07-12
[ 73 ]
Working document towards a preliminary draft revision of Recommendation ITU-R S.2131-0 - Method for the determination of performance objectives for satellite hypothetical reference digital paths using adaptive coding and modulation � France 2021-07-05
[ 72 ]
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 4A, 4B, 4C, 5A, 5B, 5C, 7B, 7C and 7D for information) - WRC-23 agenda items 1.1 and 1.2 � WPs 3K and 3M AI1.2, AI1.1 2021-07-05
[ 71 ]
Reply liaison statement to Working Party 4C (copied to Working Parties 4A, 4B, 5A, 5C, 5D, and 7B for information) - WRC-23 agenda item 1.18 � WPs 3K and 3M AI1.18 2021-07-05
[ 70 ]
Use of confidence intervals in statistical studies � Al Yah Satellite Company 2021-07-05
[ 69 ]
Reply liaison statement to Working Party 5B (copy to Working Parties 4A and 4B for information) - WRC-23 agenda item 1.8 � WP 3M AI1.8 2021-07-05
[ 68 ]
Consideration of vision and requirements for satellite radio interface(s) of IMT-2020 � China (People's Republic of) 2021-06-28
[ 67 ]
Proposed work plan for future development of satellite radio interface(s) of IMT-2020 � China (People's Republic of) 2021-06-28
[ 66 ]
A working document towards preliminary draft revision of Report ITU-R BO.2397-0 - Satellite transmission for UHDTV satellite broadcasting � Japan Q292/4 2021-06-28
[ 65 ]
Satellite Io T/M2M Matters in ITU-R Working Party 4B � United States of America 2021-06-25
[ 64 ]
Modification on working document towards a preliminary draft new Question ITU-R [SAT-M2M/IOT] - Technical methods for improving performance and efficiency of FSS and MSS systems with Machine-to-Machine/Internet of Things (M2M/IoT) applications � Korea (Republic of) 2021-06-25
[ 63 ]
Liaison statement to ITU-R Study Groups 4 and 6 - Broadcasting term "Quasi Error Free" (QEF) in the ITU Terminology Database � CCT 2021-06-19
[ 62 ]
Liaison statement on work related to environment energy efficiency and the circular economy and new areas of study � ITU-T SG 5 2021-06-02
[ 61 ]
Liaison statement to relevant parties - Proposed suppression of the Compendium of ITU's work on Emergency Telecommunications � WP 5A 2021-05-17
[ 60 ]
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4B, 4C, 5A, 5B, 7B and 7C for information) - WRC-23 agenda item 1.2 � WP 5C AI1.2 2021-05-13
[ 59 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B and 7B for information) - WRC-23 agenda items 1.16 and 1.17 - Characteristics and protection criteria for fixed service systems operating in the frequency bands 17.7- 19.7 GHz and 27.5-29.5 GHz � WP 5C AI1.17, AI1.16 2021-05-13
Results:158 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2023-10-19