International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP4A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP4A� C�

ITU-R�WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:983 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 933 ]
Report of activities of the Correspondence Group on scaling factor to Working Party 4A meeting of 27 June to 6 July 2023 � Chairman, CG - Scaling Factor 2023-06-20
[ 932 ]
Preliminary draft new Recommendation ITU-R S.[RES.169_METH] - Methodology for examining the compliance of aeronautical earth stations in motion (A-ESIM) communicating with geostationary space stations in the fixed-satellite service in the 27.5-29.5 GHz band with a set of pre-established pfd limits on the Earth's surface � China (People's Republic of) 2023-06-20
[ 931 ]
Modification towards working document on Annex 14 to Working Party 4A Chairman's Report on WRC-23 agenda item 1.16 [NON-GSO_ESIM] � China (People's Republic of) AI1.16 2023-06-20
[ 930 ]
Studies on the bandwidth used in the pfd mask for the protection of terrestrial service from transmissions of A-ESIM in the frequency band 12.75-13.25 GHz � China (People's Republic of) AI1.15 2023-06-20
[ 929 ]
Working document towards an ITU-R Small Satellite Handbook � Editor 2023-06-20
[ 928 ]
Working document towards a preliminary draft new Report ITU-R S.[SCALING FACTOR] - Studies on the pfd scaling factor to be applied to non-GSO FSS constellations with 1 000 or more space stations operating in the 17.7-19.3 GHz band � France 2023-06-20
[ 927 ]
Protection of terrestrial services from interference from earth stations on aircraft under WRC-23 agenda item 1.15 � Australia AI1.15 2023-06-20
[ 926 ]
Proposal for an interim upgrade to Recommendation ITU-R S.1503 software tool to calculate epfd levels at any arbitrary location of earth station and GSO satellite � India (Republic of) 2023-06-19
[ 925 ]
Revision to Recommendation ITU-R S.1503 � United Kingdom of Great Britain and Northern Ireland 2023-06-19
[ 924 ]
Preliminary draft new Recommendation ITU-R S.[RES.169_METH] - Methodology for examining the compliance of aeronautical earth stations in motion (A-ESIM) communicating with geostationary space stations in the fixed-satellite service in the 27.5-29.5 GHz band with a set of pre-established pfd limits on the Earth's surface � United Kingdom of Great Britain and Northern Ireland 2023-06-19
[ 923 ]
Proposed revisions to the working document on WRC-23 agenda item 1.16 - Interference management and responsibilities of administrations in case unacceptable interference is caused by ESIM operations communicating with non-GSO satellites in the Ka-band � Telesat Canada AI1.16 2023-06-19
[ 922 ]
Preliminary draft new Recommendation ITU-R S.[RES.169_METH] - Methodology for examining the compliance of aeronautical earth stations in motion (A-ESIM) communicating with geostationary space stations in the fixed-satellite service in the 27.5-29.5 GHz band with a set of pre-established pfd limits on the Earth's surface � Germany (Federal Republic of) , Luxembourg 2023-06-19
[ 921 ]
Report on the final stage of implementation of Resolution 559 (WRC-19) before WRC-23 � Director, BR 2023-06-19
[ 920 ]
Appendix 4 data items for submissions of Appendix 30B ESIM assignments in accordance with Annex 1 to draft new Resolution [A115] (WRC-23) � Director, BR AI1.15 2023-06-19
[ 919 ]
Assignment of ITU-R Questions to the Study Group 4 sub-groups, Working Parties 4A and 4B � Canada 2023-06-19
[ 918 ]
Proposed revisions to the working document on WRC-23 agenda item 1.15 - Interference management and responsibilities of administrations in case unacceptable interference is caused by ESIM operations � Germany (Federal Republic of) AI1.15 2023-06-19
[ 917 ]
Working document towards a preliminary draft new Report ITU-R S.[SCALING FACTOR] - Studies on the pfd scaling factor to be applied to non-GSO FSS constellations with 1 000 or more space stations operating in the 17.7-19.3 GHz band � Germany (Federal Republic of) 2023-06-19
[ 916 ]
Contribution to Working Party 4A on the need to amend relevant provisions of the Radio Regulations to protect broadcasting-satellite service (BSS) in Regions 1 and 3 from high power-flux density (pfd) values stemming from the operation of fixed-satellite service (FSS) in Region 2 in the frequency band 11.7-12.2 GHz � Iran (Islamic Republic of) 2023-06-19
[ 915 ]
Consideration of proposed change to satellite selection algorithm in Recommendation ITU-R S.1503 � Indonesia (Republic of) , Samoa (Independent State of) 2023-06-19
[ 914 ]
Revisions to the working document on WRC-23 agenda item 1.17 � European Space Agency , European Organisation for the Exploitation of Meteorological Satellites AI1.17 2023-06-19
[ 913 ]
Working document on WRC-23 agenda item 1.16 [NON-GSO_ESIM] - Operation of earth stations in motion communicating with non-geostationary space stations in the fixed-satellite service allocations at 17.7-18.6 GHz, 18.8-19.3 GHz and 19.7-20.2 GHz (space-to-Earth) and 27.5-29.1 GHz and 29.5-30 GHz (Earth-to-space) � European Space Agency , European Organisation for the Exploitation of Meteorological Satellites AI1.16 2023-06-19
[ 912 ]
Preliminary draft revision of Recommendation ITU-R S.1503-3 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations � United States of America 2023-06-19
[ 911 ]
Working document on WRC-23 agenda item 1.17 � United States of America AI1.17 2023-06-19
[ 910 ]
Methodology for examining characteristics of aeronautical earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service in the 27.5-29.5 GHZ band with respect to conformity with pfd limits � United States of America AI1.5 2023-06-19
[ 909 ]
Sharing and compatibility studies for working document related to WRC-23 agenda item 1.17 � United States of America AI1.17 2023-06-19
[ 908 ]
Working document towards a preliminary draft new Recommendation ITU-R S.[non-GSO-MODELING] � United States of America 2023-06-19
[ 907 ]
Proposed updates to working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO] - Calculation method to assess average throughput degradation and unavailability increase due to inter-system interference by a non-geostationary FSS satellite systems for frequency ranges between 10.7 GHz and 52.4 GHz � United States of America 2023-06-19
[ 906 ]
Working document towards a preliminary draft revision of Recommendation ITU-R S.1503 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations � United States of America 2023-06-19
[ 905 ]
Working document on WRC-23 agenda item 1.16 [NON-GSO_ESIM] - Operation of earth stations in motion communicating with non-geostationary space stations in the fixed-satellite service allocations at 17.7-18.6 GHz, 18.8-19.3 GHz and 19.7-20.2 GHz (space-to-Earth) and 27.5-29.1 GHz and 29.5-30 GHz (Earth-to-space) � United States of America AI1.16 2023-06-19
[ 904 ]
Revisions to working document on WRC-23 agenda item 7, Topic A - Tolerances for certain orbital characteristics of non-GSO space stations in the FSS, BSS, and MSS � United States of America AI7A 2023-06-19
[ 903 ]
Proposals for the working document for agenda item 1.19 for WRC-23 � Australia AI1.19 2023-06-19
[ 902 ]
Proposal for addressing WCG issues in Recommendation ITU-R S.1503 � Galaxy Space (Beijing) Technology Co., Ltd 2023-06-17
[ 901 ]
Working document on developing an ITU-R small satellite handbook � China (People's Republic of) 2023-06-16
[ 900 ]
Proposal for WRC-23 agenda item 7, Topic A � China (People's Republic of) AI7A 2023-06-16
[ 899 ]
Working document on WRC-23 agenda item 1.17 � China (People's Republic of) AI1.17 2023-06-16
[ 898 ]
Sharing study of non-GSO satellite system communicating with aeronautical and maritime ESIM over the oceans on EESS (passive) in the 18.6-18.8 GHZ band under WRC-23 agenda item 1.16 � China (People's Republic of) AI1.16 2023-06-16
[ 897 ]
Updating Recommendation ITU-R S.1503 � Global Satellite Operators Association (GSOA) 2023-06-16
[ 896 ]
(Rev.1)
Working document on developing an ITU-R Small Satellite Handbook � International Amateur Radio Union 2023-06-15
[ 895 ]
Note to the Chairmen of Working Parties 4A and 7D (copy to the Chairmen of Study Group 1 and Working Party 1A) � Chairman, WP 6A 2023-06-14
[ 894 ]
Proposed modifications to preliminary draft new Recommendation ITU-R S.[RES.169_METH] - Methodology for examining the compliance of aeronautical earth stations in motion (A-ESIM) communicating with geostationary space stations in the fixed-satellite service in the 27.5-29.5 GHz band with a set of pre-established pfd limits on the Earth's surface � Korea (Republic of) 2023-06-14
[ 893 ]
Proposed modifications to preliminary draft new Recommendation ITU-R S.[QV-METH-REF-LINKS] � Korea (Republic of) 2023-06-14
[ 892 ]
Preliminary draft revision of Recommendation ITU-R S.1503-3 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations � Russian Federation 2023-06-13
[ 891 ]
Analysis of e.i.r.p. mask application in compatibility studies with FSS (Earth-to-space) in the 6 425-7 125 MHz frequency band � Russian Federation AI1.2 2023-06-13
[ 890 ]
Consideration of proposed changes to Recommendation ITU-R S.1503 � Russian Federation 2023-06-13
[ 889 ]
Reference satellite antenna radiation patterns for non-geostationary orbit satellite antennas operating in the fixed-satellite service below 30 GHz contained in Recommendation ITU-R S.1528 � Director, BR 2023-06-13
[ 888 ]
Working document on WRC-23 agenda item 1.19 � Brazil (Federative Republic of) AI1.19 2023-06-12
[ 887 ]
Proposal to incorporate PFD limits evaluation into working document on WRC-23 agenda item 1.17 - Consideration of PFD limits for protecting terrestrial services from non-GSO space stations transmitting in frequency band 27.5-29.5 GHZ � Japan AI1.17 2023-06-12
[ 886 ]
Proposal to the work on preliminary draft new Recommendation ITU-R S.[RES.169_METH] - Methodology for examining the compliance of aeronautical earth stations in motion (A-ESIM) communicating with geostationary space stations in the fixed-satellite service in the 27.5-29.5 GHz band with a set of pre-established pfd limits on the Earth's surface � Japan 2023-06-12
[ 885 ]
Views on the proposed new topic to be considered under WRC-23 agenda item 7 - Modification to the Radio Regulations to protect broadcasting-satellite service (BSS) in Regions 1 and 3 from high power-flux density (pfd) values stemming from the operation of fixed-satellite service (FSS) in Region 2 in the frequency band 11.7-12.2 GHz � Japan AI7 2023-06-12
[ 884 ]
Preliminary draft revision of Report ITU-R BO.2497-0 - Characteristics and effectiveness of frequency sharing criteria for the broad-casting-satellite service in Regions 1 and 3 subject to RR Appendix 30 � Japan Q283/4 2023-06-12
Results:983 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2023-10-19