Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 404 ]
�
� |
BEL measurement, traditional building, frequencies below 80 MHz
�
� |
Orange Polska S.A.
� |
� |
2023-05-10 |
|
[ 403 ]
�
� |
Submission of D-band rain attenuation statistics affecting terrestrial links for Table I-1 of DBSG3 and test of rain attenuation prediction models
�
� |
Italy
� |
� |
2023-05-10 |
|
[ 402 ]
�
� |
This document has been withdrawn
�
� |
BR, Study Groups Department
� |
� |
2023-05-10 |
|
[ 401 ]
�
� |
Preliminary draft revisions of Recommendation ITU-R P.618-13 and Fascicle 3M/FAS/3
�
� |
Italy
� |
� |
2023-05-10 |
|
[ 400 ]
�
� |
Working document towards a preliminary draft revision of Recommendation ITU-R P.1814-0 - Prediction methods required for the design of terrestrial free-space optical links
�
� |
Italy
� |
� |
2023-05-10 |
|
[ 399 ]
�
� |
New data for DBSG3 Table II-1 - 2 years of Alphasat attenuation statistics in Tito Scalo and Spino d'Adda
�
� |
Italy
� |
� |
2023-05-10 |
|
[ 398 ]
�
� |
Preliminary draft revision of Recommendation ITU-R P.452-17 (Hydrometeor scatter) - Prediction procedure for the evaluation of interference between stations on the surface of the Earth at frequencies above about 0.1 GHz
�
� |
United States of America
� |
� |
2023-05-09 |
|
[ 397 ]
�
� |
Preliminary draft new Fascicle 3M/FAS/X - Fascicle on hydrometeor scatter interference
�
� |
United States of America
� |
� |
2023-05-09 |
|
[ 396 ]
�
� |
Discussion document on the physical explanation for non-monotonic rain attenuation dependence on elevation angle
�
� |
United States of America
� |
� |
2023-05-09 |
|
[ 395 ]
�
� |
Discussion document concerning studying updates of the clutter loss model in � 1.1 of Recommendation ITU-R P.2108-1 - Clutter loss definition
�
� |
United States of America
� |
� |
2023-05-11 |
|
[ 394 ]
�
+Ann.-1-2� |
Activity Report of Correspondence Group 3J-3M-5 - Effect of clouds and precipitation on attenuation and depolarization on slant paths
�
� |
CG 3J-3M-5
� |
� |
2023-05-10 |
|
[ 393 ]
�
� |
Preliminary draft revision of Recommendation ITU-R P.2040-2 - Effects of building materials and structures on radiowave propagation above about 100 MHz
�
� |
United States of America
� |
� |
2023-05-09 |
|
[ 392 ]
�
� |
Correspondence Group 3M-10 Activity Report
�
� |
CG 3M-10
� |
� |
2023-05-09 |
|
[ 391 ]
�
� |
Liaison statement to ITU-R Working Parties - Revising Recommendation ITU-R V.431-8
�
� |
CCT
� |
� |
2023-05-09 |
|
[ 390 ]
�
� |
Report on the activities of Correspondence Group 3J-3K-3M-14 - Issues relating to the HAPS propagation model
�
� |
Chairman, CG 3J-3K-3M-14
� |
� |
2023-05-08 |
|
[ 389 ]
�
� |
Activity Report of Correspondence Group 3M-4 - Software products, digital maps and reference numerical data products
�
� |
CG 3M-4
� |
� |
2023-05-08 |
|
[ 388 ]
�
� |
Additional updates to harmonization of the troposcatter transmission loss prediction model in Recommendations ITU-R P.452-17 and ITU-R P.1812-6
�
� |
Switzerland (Confederation of)
� |
� |
2023-04-28 |
|
[ 387 ]
�
� |
Correspondence Group 3K-3M-12 Activity Report
�
� |
Chairman, CG 3K-3M-12
� |
� |
2023-05-08 |
|
[ 386 ]
�
� |
Update of MATLAB/octave implementation of Recommendation ITU-R P.2001
�
� |
Switzerland (Confederation of)
� |
� |
2023-04-28 |
|
[ 385 ]
�
� |
Update of MATLAB/octave implementation of Recommendation ITU-R P.452
�
� |
Switzerland (Confederation of)
� |
� |
2023-04-28 |
|
[ 384 ]
�
� |
Harmonization of the troposcatter transmission loss prediction model in Recommendation ITU-R P.2001-4
�
� |
Switzerland (Confederation of)
� |
� |
2023-04-28 |
|
[ 383 ]
�
� |
Activity Report of Correspondence Group 3K-3M-18 - Common issues relating to Recommendations ITU-R P.1812 and ITU-R P.452
�
� |
CG 3K-3M-18
� |
� |
2023-04-28 |
|
[ 382 ]
�
� |
Liaison statement to Working Parties 3M, 3J, and 3K - Further development of PDNR ITU-R M.[IMT.ABOVE 100 GHz]
�
� |
WP 5D
� |
� |
2023-02-15 |
|
[ 381 ]
�
� |
Formation of a new ETSI ISG for Terahertz Communications (THz)
�
� |
European Telecommunications Standards Institute
� |
� |
2023-01-23 |
|
[ 380 ]
�
(Rev.1)� |
Reply liaison statement to Working Party 3M (copy to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5D, 6A, 7B, and 7D for information) - Future development of P-series recommendations to address frequencies above 100 GHz
�
� |
WP 5C
� |
� |
2022-12-01 |
|
[ 379 ]
�
� |
Prediction methods for LOS MIMO microwave links
�
� |
European Telecommunications Standards Institute
� |
� |
2022-11-23 |
|
[ 378 ]
�
� |
Revising Recommendation ITU-R V.431-8 - Nomenclature: Number 12, THF 300 to 3 000 GHz, Terametric waves
�
� |
ATDI
� |
Q228/3
� |
2022-11-21 |
|
[ 377 ]
�
� |
Adding symbol to the ninth ITU Radio Regulations band and revising Recommendation ITU-R V.431-8 - Nomenclature: Number 12, THF 300 to 3 000 GHz, Decimillimetric waves
�
� |
ATDI
� |
Q228/3
� |
2022-11-02 |
|
[ 376 ]
�
� |
Reply liaison statement to Working Party 3M (copy to Working Parties 3J and 3K) - Future development of P-series Recommendations to address frequencies above 100 GHz
�
� |
WP 5D
� |
� |
2022-10-31 |
|
[ 375 ]
�
� |
Reply liaison statement to Working Parties 5A and 5C (copy to Working Parties 3M, 5B and 7C for information) - WRC-23 agenda item 1.15 activities
�
� |
WP 4A
� |
AI1.15
� |
2022-10-19 |
|
[ 374 ]
�
� |
Liaison statement to Working Parties 5A, 5B, 5C, 6A, 7B (copy to Working Parties 3K, 3L, 3M for information) - Progress report on the activities relating to WRC-23 agenda item 1.12
�
� |
WP 7C
� |
AI1.12
� |
2022-10-13 |
|
[ 373 ]
�
� |
Liaison statement to Working Parties 3K, 3M, 4A, 5A, 5B, 5C, 7C and 7D - Report on progress of activities relating to agenda item 1.13 (WRC-23)
�
� |
WP 7B
� |
AI1.13
� |
2022-10-11 |
|
[ 372 ]
�
� |
Reply liaison statement to Working Party 3M (copy to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D for information) - Future development of P-series Recommendations to address frequencies above 100 GHz
�
� |
WP 7C
� |
� |
2022-10-07 |
|
[ 371 ]
�
� |
Reply liaison statement to Working Party 3M (copy to Working Parties 3J, 3K, 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, and 7C - Extending the application of propagation Recommendations to frequencies greater than 100 GHz
�
� |
WP 7D
� |
� |
2022-10-06 |
|
[ 370 ]
�
� |
Liaison statement to Working Parties 3J, 3K and 3M - Revision of Report ITU-R BT.2383
�
� |
WP 6A
� |
� |
2022-09-28 |
|
[ 369 ]
�
� |
Liaison statement to Working Party 7C (copy to Working Parties 3K, 3L, 3M, 5A, 5B, and 5C) - WRC-23 agenda item 1.12
�
� |
WP 6A
� |
AI1.12
� |
2022-09-28 |
|
[ 368 ]
�
� |
Reply liaison statement to Working Party 5D (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D for information) - WRC-23 agenda item 1.4
�
� |
WP 6A
� |
AI1.4
� |
2022-09-28 |
|
[ 367 ]
�
� |
Reply liaison statement to Working Party 5A on studies pursuant to WRC-23 agenda item 9.1, topic b) (Copy to Working Party 3M for information) - RNSS-related comments on WRC-23 agenda item 9.1, topic b)
�
� |
WP 4C
� |
� |
2022-09-19 |
|
[ 366 ]
�
� |
Liaison statement to Working Party 3M (copy to Working Parties 1A, 1B, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Extending the application of propagation Recommendations to frequencies greater than 100 GHz
�
� |
WP 4B
� |
� |
2022-09-19 |
|
[ 365 ]
�
� |
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D - WRC-23 agenda item 1.4
�
� |
WP 5D
� |
AI1.4
� |
2022-07-01 |
|
[ 364 ]
�
+Ann.1-21� |
Report on the meeting of Working Party 3M (Geneva, 30 May - 10 June 2022)
�
� |
Chairman, WP 3M
� |
� |
2022-06-10 |
|
[ 363 ]
�
� |
Final list of participants Working Party 3M (30 May - 10 June 2022)
�
� |
Director, BR
� |
� |
2022-06-10 |
|
[ 362 ]
�
� |
List of documents issued (Documents 3M/253 - 3M/362)
�
� |
BR, Study Groups Department
� |
� |
2022-06-07 |
|
[ 361 ]
�
� |
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B, 7B and 7C for information) - WRC-23 agenda item 1.17 activities
�
� |
WP 5C
� |
AI1.17
� |
2022-06-06 |
|
[ 360 ]
�
� |
Reply liaison statement to Working Party 7B (copy to Working Parties 3K, 3M, 4A, 5A, 5B, 7C and 7D for information) - Activities relating to WRC-23 agenda item 1.13
�
� |
WP 5C
� |
AI1.13
� |
2022-06-06 |
|
[ 359 ]
�
� |
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5B, and 7C for information) - WRC-23 agenda item 1.15 activities
�
� |
WP 5C
� |
AI1.15
� |
2022-06-06 |
|
[ 358 ]
�
� |
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4C, 5A, 5B, 7B and 7C for information) - WRC-23 agenda item 1.16 activities
�
� |
WP 5C
� |
AI1.16
� |
2022-06-06 |
|
[ 357 ]
�
� |
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5B, 5C, and 7C for information) - WRC-23 agenda item 1.15 activities
�
� |
WP 5A
� |
AI1.15
� |
2022-06-06 |
|
[ 356 ]
�
� |
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5B, 5C and 7C for information) - WRC-23 agenda item 1.19 activities
�
� |
WP 5A
� |
AI1.19
� |
2022-06-06 |
|
[ 355 ]
�
� |
Liaison statement to Working Parties 7C, 5B, 5C, 6A and 7B (copy to Working Parties 3K, 3L and 3M for information) - Comments on Working Party 7C activities relating to WRC-23 agenda item 1.12
�
� |
WP 5A
� |
AI1.12
� |
2022-06-06 |
Results:454 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):