International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : SG01 : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�SG01� C�

ITU-R�SG01

Spectrum Management

Results:165 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 115 ]
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 5 and 6) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations � SG 7 2022-10-10
[ 114 ]
Preliminary position on WRC-23 Agenda � World Meteorological Organization 2022-09-20
[ 113 ]
Liaison statement on ITU testing laboratories recognition procedure � ITU-T SG11 2022-07-19
[ 112 ]
+Ann.1
Summary Record of the meeting of Radiocommunication Study Group 1 (Geneva, 8 July 2022) � Chairman, SG 1 2022-07-08
[ 111 ]
Final list of participants Study Group 1 (Geneva, 8 July 2022) � Director, BR 2022-07-08
[ 110 ]
List of documents issued (Documents 1/66 - 1/110) � BR, Study Groups Department 2022-07-08
[ 109 ]
Executive Report on Working Party 1A meeting (Meeting in Geneva from 28 June to 7 July 2022) � WP 1A 2022-07-07
[ 108 ]
(Rev.2)
Draft new Recommendation ITU-R SM.[WPT.BEAM.FRQ] - Guidance on frequency ranges for operation of wireless power transmission via radio frequency beam for mobile/portable devices and sensor networks � WP 1A 2022-07-07
[ 107 ]
(Rev.1)
New Report ITU-R SM.2505-0 - Impact studies and human hazard issues for wireless power transmission via radio frequency beam � WP 1A 2022-07-07
[ 106 ]
(Rev.1)
Revision of Report ITU-R SM.2451-0 - Assessment of impact on radiocommunication services from wireless power transmission for electric vehicle operating below 30 MHz � WP 1A 2022-07-07
[ 105 ]
(Rev.1)
Revision of Report ITU-R SM.2422-1 - Visible light for broadband communications � WP 1A Q238/1 2022-07-07
[ 104 ]
(Rev.1)
Revision of Report ITU-R SM.2352-0 - Technology trends of active services in the frequency range 275-3 000 GHz � WP 1A Q237/1 2022-07-07
[ 103 ]
Executive Report on Working Party 1B meeting (Meeting in Geneva from 28 June to 7 July 2022) � Chairman, WP 1B 2022-07-07
[ 102 ]
Executive Report to Study Group 1 (Working Party 1C meeting in Geneva from 28 June to 7 July 2022) � Chairman, WP 1C 2022-07-06
[ 101 ]
(Rev.1)
Revision of Report ITU-R SM.2015-1 - Methods for determining national long-term strategies for spectrum utilization � WP 1B 2022-07-05
[ 100 ]
(Rev.1)
Revision of Report ITU-R SM.2153-8 - Technical and operating parameters and spectrum use for short-range radiocommunication devices � WP 1B 2022-07-05
[ 99 ]
Draft editorial revision of Recommendation ITU-R SM.1603-2 - Spectrum redeployment as a method of national spectrum management � WP 1B 2022-07-05
[ 98 ]
(Rev.1)
Draft new Recommendation ITU-R SM.[OPTICAL WIRELESS] - Complementing current radio frequency delivery mechanisms using Optical Wireless Communication � WP 1A 2022-07-04
[ 97 ]
(Rev.1)
Revision of Report ITU-R SM.2452-0 - Electromagnetic field measurements to assess human exposure � SG 1 2022-07-25
[ 96 ]
(Rev.1)
New Report ITU-R SM.2504-0 - Methods for the estimation of coverage for terrestrial radio services based on population � WP 1C 2022-07-04
[ 95 ]
(Rev.1)
Revision of Report ITU-R SM.2257-5 - Spectrum management and monitoring during major events � WP 1C 2022-07-04
[ 94 ]
(Rev.1)
Revision of Report ITU-R SM.2179-0 - Short-range radiocommunication devices measurements � WP 1C 2022-07-04
[ 93 ]
Liaison statement to ITU-R Study Groups - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations � CCT 2022-06-30
[ 92 ]
Report on CISPR activities from November 2021 to June 2022 � Rapp. SG 1 (RG) on Liaison with CISPR 2022-06-27
[ 91 ]
Liaison statement on call for use cases on testbeds federation � ITU-T (FG-TBFxG) 2022-06-24
[ 90 ]
Report on CISPR activities from June 2021 to June 2022 on WPT issues � SG 1 Rapp. to CISPR on WPT issues 2022-06-23
[ 89 ]
Activities and future plan on Correspondence Group on editorial review and maintenance of ITU-R Recommendations, Reports and Questions assigned to the Study Group � Acting Chairman, SG 1 CG on editorial review 2022-06-20
[ 88 ]
Liaison statement on the outcomes of the first meeting of the ITU-T Focus Group on Testbed Federations for IMT-2020 and beyond (FG-TBFXG) � ITU-T (FG-TBFxG) 2022-04-14
[ 87 ]
Liaison statement to all ITU-R Study Groups - Information on the progress of ITU-R Study Group 6 Rapporteur Group on a vision for the Future of Broadcasting (RG-FOB) � SG 6 2022-03-22
[ 86 ]
Liaison statement on the establishment of JCA on digital Covid-19 Certificates (JCA-DCC) � ITU-T TSAG 2022-01-19
[ 85 ]
Liaison statement on the new version of the Access Network Transport (ANT) standards overview and work plan � ITU-T SG15 2022-01-05
[ 84 ]
Reply liaison statement on the new version of the Access Network Transport (ANT) standards overview and work plan � ITU-T SG9 2022-01-05
[ 83 ]
Liaison statement on the new version of the Home Network Transport (HNT) standards overview and work plan � ITU-T SG15 2022-01-04
[ 82 ]
Reply liaison statement on the new version of the Home Network Transport (HNT) standards overview and work plan � ITU-T SG9 2022-01-04
[ 81 ]
GASS 2021: Recent URSI Resolutions and Recommendation � Director, BR 2021-12-16
[ 80 ]
Liaison statement on invitation to review artificial intelligence standardization roadmap and provide missing or updated information � ITU-T SG13 2021-12-15
[ 79 ]
(Rev.1)
Liaison statement on establishment of a new ITU-T Focus Group on testbeds federations for IMT-2020 and beyond (FG-TBFXG) and first meeting (virtual, 4-7 April 2022) � ITU-T SG11 2021-12-15
[ 78 ]
(Rev.1)
Executive Report on the November 2021 meeting of Working Party 1A (e-Meeting, 3-12 November 2021) � Chairman, WP 1A 2021-12-14
[ 77 ]
Executive Report on Working Party 1C meeting (Online meeting, 3 - 10 November 2021) � Chairman, WP 1C 2021-12-06
[ 76 ]
Executive Report on Working Party 1B meeting (Online meeting, 3-10 November 2021) � Chairman, WP 1B 2021-11-25
[ 75 ]
(Rev.1)
Draft new Question ITU-R [IMPACT_UNINTENTIONAL_ELECTROMAG DISTURBANCES]/1 - Impact of unintentional radio frequency energy generated by electrical or electronic apparatus to the radiocommunication services � WP 1A 2021-11-23
[ 74 ]
(Rev.1)
New Report ITU-R SM.2503-0 - Evaluation of radiated electromagnetic disturbances of household appliances and their interferences over an IoT network in the 915 MHz frequency band � WP 1A 2021-11-23
[ 73 ]
(Rev.1)
Draft revision of Question ITU-R 210-3/1 - Wireless power transmission � WP 1A 2021-11-23
[ 72 ]
(Rev.1)
Draft revision of Recommendation ITU-R SM.1875-3 - DVB-T coverage measurements and verification of planning criteria � WP 1C 2021-11-18
[ 71 ]
(Rev.2)
Draft new Recommendation ITU-R SM.[APP10] - Guidance on supplementary elements on the use of Appendix 10 of the Radio Regulations to convey information related to harmful interference to space radiocommunication services � WP 1C 2021-11-18
[ 70 ]
Report on CISPR activities from June 2021 to October 2021 � Rapp. SG 1 (RG) on Liaison with CISPR , Rapp. to CISPR on WPT issues 2021-11-03
[ 69 ]
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Study Group 1, Working Party 1B, Study Group 6, Working Party 6A and Working Party 6C, and ITU-T SG9 and SG16 on ITU-D SG1 Question 2/1 for discussions and final Report - Strategies, policies, regulations and methods of migration and adoption of digital broadcasting and implementation of new services � ITU-D SG1 2021-10-25
[ 68 ]
Liaison statement on establishment of a new ITU-T Focus Group on Artificial Intelligence (AI) and Internet of Things (IOT) for digital agriculture (FG-AI4A) � ITU-T SG20 2021-10-22
[ 67 ]
+Ann.1
Additional information on the preparation of texts for the draft CPM Report to WRC-23 � Director, BR 2021-09-02
[ 66 ]
+Ann.1
Summary Record of the meeting of Radiocommunication Study Group 1 (E-meeting, 3 June 2021) � Chairman, SG 1 2021-06-03
Results:165 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2023-10-19