International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP4B : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP4B� C�

ITU-R�WP4B

Systems, air interfaces, performance and availability objectives for FSS, BSS and MSS, including IP-based applications and satellite news gathering

Results:173 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 123 ]
Liaison statement to Working Parties 4B, 5A, 5C, 5D, 7C and 7D regarding WRC-19 agenda item 9.1, issue 9.1.9 � WP 4A AI9.1 2018-03-21
[ 122 ]
Liaison statement to Working Party 5B (copy for information to Working Parties 4B, 4C, 5A, 5C, 5D, 6A, 7B, 7C, 7D and 3M) - Draft documents including draft CPM text related to WRC-19 agenda item 1.10, Resolution 426 (WRC-15) � WP 4A AI1.10 2018-03-21
[ 121 ]
Liaison statement on the merge of Q1/9 with Q3/9 and related amendment of Q1/9 ToR � ITU-T SG 9 2018-03-21
[ 120 ]
Liaison statement to Working Parties 4B, 4C, 5A, 5C, 7B and 7C - Studies relating to the use of the frequency bands 17.7-19.7 GHz (space-to-Earth) and 27.5-29.5 GHz (Earth-to-space) by earth stations in motion communicating with geostationary space stations in the fixed-satellite service under WRC-19 agenda item 1.5 � WP 4A AI1.5 2018-03-21
[ 119 ]
Liaison statement to Task Group 5/1 (copy to Working Party 4B for information) - Information on FSS/BSS technical parameters � WP 4A AI1.13 2018-03-21
[ 118 ]
Liaison statement invitation to update the information in the IMT 2020 roadmap � Chairman, ITU-T (JCA-IMT2020) 2018-03-06
[ 117 ]
Liaison statement on the new version of the Access Network Transport (ANT) Standards Overview and Work Plan � ITU-T SG 15 2018-02-27
[ 116 ]
+Ann.1-7
Report on the forty-third meeting of Working Party 4B (Geneva, 19-23 February) � Chairman, WP 4B 2018-02-23
[ 115 ]
Final list of participants - Working Party 4B (Geneva, 19-23 February 2018) � Director, BR 2018-02-23
[ 114 ]
Liaison statement to Working Party 4B (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7A, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" regarding FSS/BSS � WP 4A 2018-02-20
[ 113 ]
Liaison statement to Working Party 4B - UTC application in MSS systems � WP 4C 2018-02-20
[ 112 ]
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7C) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" regarding RNSS systems � WP 4C 2018-02-20
[ 111 ]
(Rev.1)
List of documents issued (Documents 4B/93 - 4B/114) � BR Study Groups Department 2018-02-16
[ 110 ]
Note from Chairman of Working Party 4C to the Director, Radiocommunication Bureau (copy for information to RAG and Working Parties 4A, 4B, 5A, 7B, 7C) - Cost recovery for non-GSO satellite systems � Chairman, WP 4C 2018-02-16
[ 109 ]
Recommendation ITU-R P.681-10 - Propagation data required for the design of Earth-space land mobile telecommunication systems � SG 3 2018-02-16
[ 108 ]
Question ITU-R 140-1/6 (brought to the attention of SGs 4 & 5) - Global platform for the broadcasting service � SG 6 2018-02-16
[ 107 ]
Proposed modification to the working document towards a preliminary draft new Report ITU-R M.[NGAT_SAT] � GSMA 2018-02-12
[ 106 ]
Proposed edits to the working document towards a preliminary draft new Report ITU-R M.[NGAT_SAT] � EMEA Satellite Operator's Association (ESOA) 2018-02-12
[ 105 ]
Liaison statement on the results of the 1st meeting of the ITU-T Focus Group on machine learning for future networks including 5G (FG ML5G) � ITU-T FG ML5G 2018-02-08
[ 104 ]
Liaison statement - New ITU-T Study Group 13 terms and definitions � ITU-R CCV, ITU-T SCV 2018-02-09
[ 103 ]
Proposed draft new Recommendation ITU-R S.[ACM-PERF] - Performance objectives for satellite connections using adaptive coding and modulation � Korea (Republic of) 2018-02-08
[ 102 ]
Preliminary draft revision of Report ITU-R BO.2071-1 - BSS system parameters between 17.3 GHz and 42.5 GHz and associated feeder links � Japan Q292/4, Q283/4, Q281/4, Q279/4 2018-02-06
[ 101 ]
Cost recovery for non-GSO satellite systems � Director, BR 2018-01-08
[ 100 ]
Liaison statement to CISPR and ITU-T Study Group 5 (copy for information to ITU-R Working Parties 1C, 4A, 4B and 7C) - Interference from broadcasting-satellite receiving equipment � WP 1A 2017-12-12
[ 99 ]
Liaison statement on Setting Environmental requirements for 5G/IMT-2020 � ITU-T SG 5 2017-11-23
[ 98 ]
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5C, 5D, 6A, 7C, 7B, 7D and 3M - Draft documents including draft CPM text related to WRC-19 agenda item 1.10, Resolution 426 (WRC-15) � WP 5B AI1.10 2017-11-20
[ 97 ]
Liaison statement to Task Group 5/1 (copy to Working Party 4B for information) - FSS/BSS technical parameters for sharing studies under WRC-19 agenda item 1.13 � WP 4A AI1.13 2017-11-07
[ 96 ]
Liaison statement to Working Party 5C (copy to Working Party 4B for information) - FSS/BSS technical parameters for sharing studies under WRC-19 agenda item 1.14 (HAPS) � WP 4A AI1.14 2017-11-02
[ 95 ]
Reply to the BR Director with copy to Working Parties 4A, 4B and 4C - Cost recovery for non-GSO satellite networks � WPs 7B and 7C 2017-11-01
[ 94 ]
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D - Study on Resolution 655 (WRC-15) �Definition of time scale and dissemination of time signals via radiocommunication systems� � WP 7A 2017-11-01
[ 93 ]
+Ann.1-9
Report on the forty second meeting of Working Party 4B (Geneva, 16-20 October 2017) � Chairman, WP 4B 2017-10-18
[ 92 ]
Final list of participants - Working Party 4B (Geneva, 16-20 October 2017) � Director, BR 2017-10-18
[ 91 ]
(Rev.1)
Note to the Chairman of Study Group 4 (copy for information to Working Parties 4A and 4B) - Cost Recovery for non-GSO satellite networks � WP 4C 2017-10-17
[ 90 ]
(Rev.1)
List of documents issued (Documents 4B/74 - 4B/90) � BR Study Groups Department 2017-10-13
[ 89 ]
Comments on the working document towards a preliminary draft new Report ITU-R M.[NGAT_SAT] � SES WORLD SKIES , Avanti Communications Group Plc , Eutelsat S.A. , Inmarsat Plc. , Intelsat , ViaSat, Inc. 2017-10-09
[ 88 ]
Cost recovery for non-GSO satellite networks � Director, BR 2017-10-05
[ 87 ]
Working document towards a preliminary draft revision of Report ITU-R BO.2071-1 - BSS system parameters between 17.3 GHz and 42.5 GHz and associated feeder links � Japan Q292/4, Q283/4, Q281/4, Q279/4 2017-10-03
[ 86 ]
Additional comments on working document towards a preliminary draft new Report ITU-R M.[NGAT_SAT] � Japan 2017-10-03
[ 85 ]
Modification on working document towards a preliminary draft new Recommendation/Report ITU-R S.[ACM-PERF] - Performance objectives for satellite connections using adaptive coding and modulation � Korea (Republic of) 2017-09-29
[ 84 ]
Liaison statement to ITU-R Working Party 4B on the integration of satellite solutions into IMT-2020 networks � Director, BR 2017-09-19
[ 83 ]
Liaison statement from ITU-D Study Group 2 Question 5/2 to ITU-T, ITU-R, ASTAP and CITEL on disaster relief use cases - Utilization of telecommunications/ICTs for disaster preparedness, mitigation and response � ITU-D SG 2 2017-08-28
[ 82 ]
Liaison statement on the first meeting of ITU-T Focus Group on data processing and management to support IoT and Smart Cities & Communities (FG-DPM) � ITU-T FG-DPM 2017-07-21
[ 81 ]
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5B, 5C, 6A, 7A, 7B, 7C & 7D on Resolution 63 (Rev. WRC-12) � WP 1A 2017-07-10
[ 80 ]
Liaison statement on new Supplement on the framework of disaster management � ITU-T SG 15 2017-07-07
[ 79 ]
New version of the Access Network Transport (ANT) Standards Overview and Work Plan � ITU-T SG 15 2017-07-07
[ 78 ]
Liaison statement to Working Party 5C (copy to Working Party 4B for information) - FSS/BSS technical parameters for sharing studies under WRC-19 agenda item 1.14 (HAPS) � WP 4A AI1.14 2017-05-19
[ 77 ]
Liaison statement to Working Party 5A (copy to Working Party 4B for information) - FSS/BSS technical parameters for sharing studies under WRC-19 agenda item 1.16 (RLAN) � WP 4A AI1.16 2017-05-19
[ 76 ]
Liaison statement to working Parties 5A, 5C, 5D, 7C and 7D (copy to Working Parties 4B and 3M) - WRC-19 agenda item 9.1, issue 9.1.9 � WP 4A AI9.1 2017-05-19
[ 75 ]
Liaison statement to Task Group 5/1 (copy to Working Party 4B for information) - FSS/BSS technical parameters for sharing studies under WRC-19 agenda item 1.13 � WP 4A AI1.13 2017-05-12
[ 74 ]
+Ann.1-7
Report on the forty-first meeting of Working Party 4B (Geneva, 1-5 May 2017) � Chairman, WP 4B 2017-05-05
Results:173 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2019-10-18