International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP1B : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP1B� C�

ITU-R�WP1B

Spectrum Management Methodologies and Economic Strategies

Results:383 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 333 ]
WPT interference to AM broadcast services: Measurement of building entry loss � European Broadcasting Union Q210/1, AI9.1 2018-11-09
[ 332 ]
Support to the development of a new ITU-R Recommendation on required limits of WPT emissions to protect radiocommunication services - Limits and measures to mitigate disturbances from Wireless Power Transmission systems to radiocommunication systems operating below [30 MHz] � European Broadcasting Union Q210/1, AI9.1 2018-11-09
[ 331 ]
Analysis of the study in Section 7.1.3.3 of Annex 4 to Document 1B/303 - Working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM] - (Question ITU-R 210-3/1) � European Broadcasting Union Q210/1, AI9.1 2018-11-09
[ 330 ]
Reply liaison statement to Working Party 1B regarding - Revision of Recommendation ITU-R SM.1896 � WP 5C 2018-11-09
[ 329 ]
Proposed revisions to "Technical and operating parameters and spectrum use for short-range Radiocommunication devices" (Report ITU-R SM.2153-6) � Brazil (Federative Republic of) 2018-11-09
[ 328 ]
Update to study on the impact of WPT-EV on the 60 KHz standard frequency and time signal service � United Kingdom of Great Britain and Northern Ireland AI9.1.6 2018-11-09
[ 327 ]
Analysis of WPT-EV products and coexistence test with broadcasting service � China (People's Republic of) 2018-11-09
[ 326 ]
Proposed revision of working document towards a preliminary draft new Report ITU-R SM. [WPT-SPEC-MNGM] � Japan Q210/1, AI9.1 2018-11-08
[ 325 ]
Proposal for an update of working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM] � Korea (Republic of) Q210/1, AI9.1 2018-11-07
[ 324 ]
Proposed modification of working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM] � Korea (Republic of) Q210/1, AI9.1 2018-11-07
[ 323 ]
Development of a new ITU-R Recommendation on limits of WPT-EV spurious emissions to protect radiocommunication services � International Amateur Radio Union AI9.1 2018-11-07
[ 322 ]
Liaison statement to Working Party 1A on WPT activities � International Electrotechnical Commission 2018-11-01
[ 321 ]
Liaison statement to Working Parties 1A and 1B on protection of sound broadcasting receivers from WPT systems � WP 6A Q210/1, AI9.1 2018-10-24
[ 320 ]
Liaison statement from ITU-D Study Group 1 Question 4/1 to ITU-R Study Group 1 and Working Party 1B on revision of Report ITU-R SM.2012-5 - Economic policies and methods of determining the costs of services related to national telecommunication/information and communication technology networks, including next-generation networks � ITU-D SG 1 2018-10-16
[ 319 ]
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Study Group 1 and Working Party 1B on further collaboration - Strategies, policies, regulations and methods of migration and adoption of digital broadcasting and the implementation of new services � ITU-D SG 1 2018-10-16
[ 318 ]
Elements for a working document towards a preliminary draft new Recommendation ITU-R [WPT-UNWANTED] - Limits and measures to mitigate disturbances from Wireless Power Transmission systems to radiocommunication systems operating below [30 MHz] � Turkey Q210/1 2018-10-14
[ 317 ]
(Rev.1)
Liaison statement on operation of short-range radiocommunication public access system supporting hearing aid systems � European Telecommunications Standards Institute 2018-10-10
[ 316 ]
Liaison statement on ITU inter-Sector coordination: ITU-R Working Parties 1A, 1B, and 1C versus ITU-T Questions � ITU-T SG 5 2018-10-10
[ 315 ]
Information on medium frequency broadcast operation and listening in portions of Region 2 for WPT Impact Assessment � North American Broadcasters Association (NABA) 2018-10-02
[ 314 ]
Liaison statement to Working Party 1A (copy to Working Parties 1B, 5B, 5C, 6A and 7D for information) - Preliminary draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems � WP 7A 2018-09-28
[ 313 ]
Reply liaison statement to Working Party 1B (copy to Working Party 1A, for information) - Protection criteria for SFTS in relation to WRC-19 agenda item 9.1, issue 9.1.6 � WP 7A AI9.1 2018-09-28
[ 312 ]
Acting Chairman of Working Party 1B � Chairman, SG 1 2018-09-03
[ 311 ]
Reply from the Wireless Power Consortium to the June 2018 liaison statement for Working Party 1B on WPT � Director, BR 2018-08-16
[ 310 ]
Working Party 1C for action - ITU Intersectoral response to ICNIRP - Public consultation of the draft ICNIRP guidelines on limiting EMF exposure (100 kHz to 300 GHz) � ATDI , Orange Polska S.A. Q239/1 2018-08-02
[ 309 ]
Liaison statement on ITU Inter-Sector coordination � ITU-T SG11 2018-08-03
[ 308 ]
Liaison statement on new terms and definitions in ITU-T Study Group 20 work � SCV 2018-07-09
[ 307 ]
Liaison statement to Working Parties 5A, 5B, 6A and 7A (copy to Working Party 1B for information) on preliminary draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems � WP 1A Q210/1 2018-07-02
[ 306 ]
Liaison statement to Working Parties 1A, 5A, 5B and 6A (copy to Working Party 1B for information) - Preliminary draft new Report ITU-R SM.[WPT_100-148.5kHz] � WP 3L 2018-07-02
[ 305 ]
Reply liaison statement to Working Parties 5A, 5B and 6A (copy to Working Party 1B) - Preliminary draft new Report ITU-R SM.[WPT_100-148.5KHZ] � WP 1A 2018-06-29
[ 304 ]
Liaison statement to Working Party 1B on elements for a working document towards preliminary draft new Recommendation ITU-R SM.[WPT-UNWANTED] � WP 1A Q210/1 2018-06-29
[ 303 ]
+Ann.1-9
Report on the fifth 2015-2019 meeting of Working Party 1B (Geneva, 4-12 June 2018) � Chairman, WP 1B 2018-06-12
[ 302 ]
Final list of participants Working Party 1B (Geneva, 4-12 June 2018) � Director, BR 2018-06-12
[ 301 ]
Note from the Chairman of Working Party 1C to the Chairman of Working Party 1B - Draft new Report ITU-R SM.[SAT-MON] - Measurement techniques and new technologies for satellite monitoring � Chairman, WP 1C 2018-06-08
[ 300 ]
(Rev.1)
Liaison statement on work which is under study in ITU-T Q3/5 � ITU-T SG 5 2018-06-04
[ 299 ]
List of documents issued (Documents 1B/237 - 1B/299) � BR Study Groups Department 2018-06-04
[ 298 ]
Report on CISPR activities from June to November 2017 - Including updated information for the period from November 2017 to May 2018 � Rapporteur, SG 1 RG on Liaison with CISPR , Rapporteur to CISPR on WPT issues 2018-06-01
[ 297 ]
Reply liaison statement to Working Party 5D (copy for information to Working Party 1B) - Work on WRC-19 agenda item 9.1, issue 9.1.8 � WP 5A AI9.1 2018-06-01
[ 296 ]
Reply liaison statement to ITU-D Study Group 2 (copy to ITU-R Working Parties 1B, 4B and 7B) on contribution concerning Bird-to-Bird packet communication � WP 5A 2018-06-01
[ 295 ]
Reply liaison statement to ITU-R Working Party 1B work on WRC-19 agenda item 9.1, issue 9.1.8 � WP 5A AI9.1 2018-06-01
[ 294 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 3L, 5B and 6A) - Applicability of Recommendation ITU-R M.1732 for use in studies undertaken in working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5kHz] � WP 5A 2018-05-31
[ 293 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 3L and 6A) - Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5 kHz] � WP 5A 2018-05-31
[ 292 ]
Liaison statement to Working Party 1B (copy to ETSI ERM TG 17) - Operation of short-range radiocommunication public access system supporting hearing aid systems � WP 5A Q254/5 2018-05-31
[ 291 ]
Reply liaison statement to Working Party 1A (copy to Working Parties 1B, 3L, 5A, and 6A) - Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5 kHz] � WP 5B 2018-05-30
[ 290 ]
Proposed revisions to working document towards a preliminary draft new Report on studies for WRC-19 agenda item 9.1, issue 9.1.7 � Germany (Federal Republic of) , Luxembourg , Netherlands (Kingdom of the) , Norway , Switzerland (Confederation of) , United Kingdom of Great Britain and Northern Ireland 2018-05-28
[ 289 ]
Proposed revisions to working document towards draft CPM text on WRC-19 agenda item 9.1, issue 9.1.7 - Resolution 958 (WRC-15), Annex item 2 � Germany (Federal Republic of) , Luxembourg , Netherlands (Kingdom of the) , Norway , Sweden , Switzerland (Confederation of) , United Kingdom of Great Britain and Northern Ireland AI9.1 2018-05-28
[ 288 ]
(Rev.1)
Working document toward CPM text or WRC-19 agenda item 9.1, issue 9.17 � Egypt (Arab Republic of) AI9.1 2018-05-28
[ 287 ]
Proposed revisions to working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM] (Contribution to ITU-R Working Party 1B with copy to Working Party 1A) - [Methodology for spectrum management of wireless power transmission (WPT)] � European Broadcasting Union (EBU) 2018-05-28
[ 286 ]
Working document towards a preliminary draft new Report ITU-R SM.[WPT -SPEC-MNGM] - [Methodology for spectrum management of wireless power transmission (WPT)] � Germany (Federal Republic of) AI9.1 2018-05-28
[ 285 ]
Information regarding DCF77 for consideration regarding - Updates on working document towards preliminary draft new Report SM.[WPT-SPEC-MNGM] � Germany (Federal Republic of) AI9.1 2018-05-28
[ 284 ]
Proposals to the working document towards a preliminary draft new Report ITU-R SM.[LPWAN.MTC] � France 2018-05-28
Results:383 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2020-12-16