International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : SG07 : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�SG07� C�

ITU-R�SG07

Science Services

Results:123 total items.
Result page:� Previous�-� 1 - 2 - 3 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 73 ]
Draft new Report ITU-R SA.[SHORT DURATION NGSO - CHARACTERISTICS] - Technical characteristics for telemetry, tracking and command in the space operation service below 1 GHz for non-GSO satellites with short duration missions � WP 7B 2017-11-01
[ 72 ]
Draft new Report ITU-R SA.[SHORT DURATION NGSO - REQUIREMENTS] - Studies to accommodate spectrum requirements in the space operation service for non-geostationary satellites with short duration missions � WP 7B AI1.7 2017-11-01
[ 71 ]
Note to Study Group 7 to suppress Recommendation ITU-R SA.1345 � WP 7B 2017-11-01
[ 70 ]
Liaison statement on the first meeting of ITU-T Focus Group on data processing and management to support IoT and Smart Cities & Communities (FG-DPM) � ITU-T FG-DPM 2017-07-21
[ 69 ]
Liaison statement on Operational Plan for Implementation of WTSA-16 Resolutions 72 and 73 (Hammamet, 2016), and Resolution 79 (Dubai, 2012) � ITU-T SG 5 2017-06-19
[ 68 ]
Liaison statement on ITU-T Study Group 5 lead Study Group activities � ITU-T SG 5 2017-06-19
[ 67 ]
Liaison statement on ITU inter-Sector coordination (reply to TSAG - LS 1 - E) � ITU-T SG 5 2017-06-16
[ 66 ]
Liaison statement on ITU inter-Sector coordination (to ISCT, TDAG, ITU-D SGs, RAG, ITU-R SGs, ITU-T SGs) � ITU-T (TSAG) 2017-05-08
[ 65 ]
Summary Report of actions taken during the meetings of Radiocommunication Study Group 7 (Geneva, 4 and 12 April 2017) � Chairman, SG 7 2017-05-02
[ 64 ]
Final list of participants: Study Group 7 (Geneva, 4 & 12 April 2017) � Director, BR 2017-04-12
[ 63 ]
Correction of few inconsistencies detected in Recommendation ITU-R RS.2017 � WP 7C 2017-04-11
[ 62 ]
Draft revision of Report ITU-R RS.2310 - Worst-case interference levels from mainlobe-to-mainlobe antenna coupling of systems operating in the radiolocation service into active sensor receivers operating in the Earth exploration-satellite service (active) in the 35.5-36.0 GHz band � WP 7C 2017-04-11
[ 61 ]
Draft revision of Recommendation ITU-R RS.1260-1 - Feasibility of sharing between active spaceborne sensors and other services in the range 420-470 MHz � WP 7C 2017-04-11
[ 60 ]
(Rev.1)
Draft new Recommendation ITU-R RS.[ACTIVE_CHAR] - Typical technical and operational characteristics of Earth exploration-satellite service (active) systems using allocations between 432 MHz and 238 GHz � WP 7C 2017-04-11
[ 59 ]
Draft revision to Recommendation ITU-R SA.1161-1 - Sharing and coordination criteria for Data Dissemination and direct data readout systems in the earth exploration-satellite and meteorological-satellite services using satellites in geostationary orbit � WP 7B 2017-04-10
[ 58 ]
Draft revision to Recommendation ITU-R SA.1160-2 - Interference criteria for data dissemination and direct data readout systems in the earth exploration-satellite and meteorological-satellite services using satellites in the geostationary orbit � WP 7B 2017-04-10
[ 57 ]
Draft revision to Recommendation ITU-R SA.1159-3 - Performance criteria for data dissemination, data collection and direct data readout systems in the Earth exploration-satellite service and meteorological-satellite service � WP 7B Q141/7 2017-04-10
[ 56 ]
Suppression of Recommendations ITU-R SA.1025 and ITU-R SA.1162 � WP 7B 2017-04-10
[ 55 ]
Draft revision to Recommendation ITU-R SA.1810-0 - System design guidelines for Earth exploration-satellites operating in the band 8 025-8 400 MHz � WP 7B Q139/7 2017-04-10
[ 54 ]
Draft revision to Recommendation ITU-R SA.1155-1 - Protection criteria related to the operation of data relay satellite systems � WP 7B 2017-04-10
[ 53 ]
Draft revision to Recommendation ITU-R SA.1414-1 - Characteristics of data relay satellite systems � WP 7B 2017-04-07
[ 52 ]
Draft editorial revision to Recommendation ITU-R RA.1237-2 - Protection of the radio astronomy service from unwanted emissions resulting from applications of wideband digital modulation � WP 7D Q145/7 2017-04-07
[ 51 ]
Draft editorial revision to Recommendation ITU-R RA.1031-2 - Protection of the radio astronomy service in frequency bands shared with other services � WP 7D Q145/7 2017-04-07
[ 50 ]
Draft editorial revision to Recommendation ITU-R RA.1750-0 - Mutual planning between the Earth exploration-satellite service (active) and the radio astronomy service in the 94 GHz and 130 GHz bands � WP 7D 2017-04-07
[ 49 ]
Draft editorial revision to Recommendation ITU-R RA.611-4 - Protection of the radio astronomy service from spurious emissions � WP 7D Q145/7 2017-04-07
[ 48 ]
Draft editorial revision to Recommendation ITU-R RA.479-5 - Protection of frequencies for radioastronomical measurements in the shielded zone of the Moon � WP 7D Q149/7 2017-04-07
[ 47 ]
Draft revision of Question ITU-R 145-2/7 - Technical factors involved in the protection of radioastronomical observations � WP 7D Q145/7 2017-04-07
[ 46 ]
Draft editorial revision to Recommendation ITU-R RA.1513-2 - Levels of data loss to radio astronomy observations and percentage-of-time criteria resulting from degradation by interference for frequency bands allocated to the radio astronomy service on a primary basis � WP 7D Q227/7 2017-04-07
[ 45 ]
Draft editorial revision to Recommendation ITU-R RA.1630 - Technical and operational characteristics of ground-based astronomy systems for use in sharing studies with active services between 10 THz and 1000 THz � WP 7D Q235/7 2017-04-07
[ 44 ]
Draft revision of Question ITU-R 226-1/7 - Frequency sharing between the radio astronomy service and other services in bands between 67 and -275 GHz � WP 7D 2017-04-07
[ 43 ]
Draft new Question ITU-R [RAS ABOVE 275 GHZ] - Technical and operational characteristics of radio astronomy applications operating above 275 GHz � WP 7D 2017-04-07
[ 42 ]
Proposed suppression of Opinions ITU-R 94 and 96 � Chairman, SG 7 2017-04-06
[ 41 ]
Liaison statement on the new structure of ITU-T Study Group 20 � ITU-T SG 20 2017-04-05
[ 40 ]
(Rev.1)
List of documents issued (Documents 7/9 - 7/63) � BR Study Groups Department 2017-03-31
[ 39 ]
Status of RA-series Recommendations � Vice-Chairman, SG 7 2017-03-28
[ 38 ]
Executive Report on the April and October 2016 meetings of Working Party 7D (5-8 April 2016 and 24-28 October 2016) � WP 7D 2017-03-28
[ 37 ]
Reply to the Note from Working Party 7C (copy to Working Party 1C) - Detection, reporting and resolution of radiofrequency interference to earth exploration-satellite service (passive) sensors � Director, BR 2017-03-27
[ 36 ]
Report on the status of two Study Group 7 Handbooks, on RS Recommendations and RS Reports � Vice-Chairman, SG 7 2017-03-27
[ 35 ]
Status of the Handbook on space research communication and the SA-series of ITU-R Recommendations � Vice-Chairman, SG 7 2017-03-24
[ 34 ]
Status of ITU-R Questions assigned to Study Group 7 - April 2017 � Vice-Chairman, SG 7 2017-03-20
[ 33 ]
List of SA-series Reports � Vice-Chairman, SG 7 2017-03-20
[ 32 ]
Executive Report on the April and October 2016 meetings of Working Party 7A (April 2017) � WP 7A 2017-03-07
[ 31 ]
Executive Report on the April and October 2016 meetings of Working Party 7C (5 - 7 April 2016 and 24 - 27 October 2016) � WP 7C 2017-03-07
[ 30 ]
Executive Report on the April and October 2016 meetings of Working Party 7B (5 - 8 April 2016 and 24 - 28 October 2016) � WP 7B 2017-03-03
[ 29 ]
Proposed suppression of Question ITU-R 254/7 - Characteristics and spectrum requirements of satellite systems using nanosatellites and picosatellites � WP 7B 254/7 2016-11-02
[ 28 ]
(Rev.1)
Draft revision to Recommendation ITU-R SA.1019 - Frequency bands and transmission directions for data relay satellite systems � WP 7B 2016-11-02
[ 27 ]
(Rev.1)
Draft revision to Recommendation ITU-R SA.1018 - Hypothetical reference system for networks/systems comprising data relay satellites in the geostationary orbit and their user spacecraft in low-Earth orbits � WP 7B 2016-11-02
[ 26 ]
(Rev.1)
Editorial corrections to Recommendation ITU-R SA.1277 � WP 7B 2016-11-02
[ 25 ]
(Rev.1)
Draft revision to Recommendation ITU-R SA.1014-2 - Telecommunication requirements for manned and unmanned deep-space research � WP 7B 2016-11-02
[ 24 ]
(Rev.1)
Draft new Recommendation ITU-R RS.[RFI-SENSOR_REPORTING] - Detection and resolution of radio frequency interference to Earth exploration-satellite service (passive) sensors � WP 7C 255/7 2016-11-02
Results:123 total items.
Result page:� Previous�-� 1 - 2 - 3 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2020-12-17