Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 124 ]
�
� |
Liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - ITU-R interest in K series Recommendations
�
� |
WP 1A
� |
� |
2014-06-20 |
|
[ 123 ]
�
� |
Liaison statement to the broadband forum (copy for information to ITU-T Study Group 15 and ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Specifications and performance of cabling intended for use with G.fast
�
� |
WP 1A
� |
� |
2014-06-20 |
|
[ 122 ]
�
� |
Liaison statement to ITU-T Study Groups 5 and 15 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Excessive levels of radio frequency noise in the environment
�
� |
WP 1A
� |
� |
2014-06-20 |
|
[ 121 ]
�
� |
Liaison statement to ITU-T Study Group 15 and Cenelec (copy for information to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Ensuring that telecommunication systems that depend on the use of radio frequencies have been properly assessed for compatibility and the avoidance of harmful interference
�
� |
WP 1A
� |
� |
2014-06-20 |
|
[ 120 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D (copy to Working Parties 1B and 1C) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems
�
� |
WP 1A
� |
� |
2014-06-19 |
|
[ 119 ]
�
+Ann.1-8� |
Report of the meeting of Working Party 1C (Geneva, 3 - 10 June 2014)
�
� |
Chairman, WP 1C
� |
� |
2014-06-10 |
|
[ 118 ]
�
� |
Final list of participants - Working Party 1C (Geneva, 3-10 June 2014)
�
� |
Director, BR
� |
� |
2014-06-10 |
|
[ 117 ]
�
� |
List of documents issued (Documents 1C/74 - 1C/117)
�
� |
BR Study Groups Department
� |
� |
2014-06-02 |
|
[ 116 ]
�
� |
Interim Report to Working Parties 1A and 1C on the work of the Study Group 1 Co-Rapporteurs on the review of ITU-R Recommendations in the SM Series for the database on ITU-R Recommendations
�
� |
SG 1 Co-Rapporteur
� |
� |
2014-05-28 |
|
[ 115 ]
�
(Rev.1)� |
Proposed additions to Recommendation ITU-R REC-SM.2039
�
� |
Colombia (Republic of)
� |
� |
2014-05-27 |
|
[ 114 ]
�
� |
Proposed revision for a preliminary draft new Recommendation ITU-R SM.[DF_ACCURACY] - Test proecedure for measuring DF accuracy
�
� |
Japan
� |
� |
2014-05-27 |
|
[ 113 ]
�
� |
Information document for Recommendation ITU-R SM.1753-2 - Guide for selection of indoor measurement locations
�
� |
Japan
� |
� |
2014-05-27 |
|
[ 112 ]
�
� |
Information document for Recommendation ITU-R SM.1753-2 - I/Q data acquisition and data processing technique for radio noise measurement
�
� |
Japan
� |
� |
2014-05-27 |
|
[ 111 ]
�
� |
Information document for Recommendation ITU-R S.1753-2 - Measurement method for spatial distribution of radio noise in an indoor environment
�
� |
Japan
� |
� |
2014-05-27 |
|
[ 110 ]
�
� |
Working document toward a draft new Report on technical identification of digital signals
�
� |
Rai Way S.p.A.
� |
� |
2014-05-27 |
|
[ 109 ]
�
� |
Working document toward preliminary draft new Recommendation ITU-R SM.[DF_ACCURACY]- Test procedure for measuring DF accuracy
�
� |
Korea (Republic of)
� |
� |
2014-05-27 |
|
[ 108 ]
�
� |
On the characterization of unwanted emissions of digital systems
�
� |
Germany (Federal Republic of)
� |
� |
2014-05-26 |
|
[ 107 ]
�
� |
How measurement of spectrum occupancy can help spectrum management
�
� |
Germany (Federal Republic of)
� |
� |
2014-05-26 |
|
[ 106 ]
�
� |
Preliminary draft new Recommendation ITU-R SM.[DOC.----] - Test procedure for measuring DF immunity against distorted wave fronts
�
� |
Rohde & Schwarz GmbH & Co. KG
� |
� |
2014-05-26 |
|
[ 105 ]
�
� |
Proposal for the revision of ITU-R Report SM.2211 - Proposed update to ITU-R Report SM.2211 on comparison of time-difference-of-arrival and angle-of-arrival methods of signal geolocation
�
� |
United States of America
� |
� |
2014-05-24 |
|
[ 104 ]
�
� |
Report of Correspondence Group Activity on preliminary draft new Recommendation ITU-R SM.[DF_ACCURACY]
�
� |
CG on DF Accuracy
� |
� |
2014-05-26 |
|
[ 103 ]
�
� |
Joint liaison statement to Working Party 5B (copy for information to Working Party 1C) - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz
�
� |
WPs 5A and 5C
� |
240/5
� |
2014-05-23 |
|
[ 102 ]
�
� |
Report on activities concerning development of the draft new Report ITU-R SM.[PLANNING_SMN] - Procedures for planning and optimization of spectrum-monitoring networks in the VHF/UHF frequency range
�
� |
Chairman CG on Planning SMN
� |
� |
2014-05-22 |
|
[ 101 ]
�
� |
Proposals for working document toward preliminary draft new Report on technical identification of digital signals
�
� |
China (People's Republic of)
� |
� |
2014-05-21 |
|
[ 100 ]
�
� |
Preliminary draft new Recommendation ITU-R SM.[DF_ACCURACY] - Test procedure for measuring DF accuracy
�
� |
China (People's Republic of)
� |
� |
2014-05-21 |
|
[ 99 ]
�
� |
Working document towards a preliminary draft new Report - Capability evaluation on satellite network monitoring
�
� |
China (People's Republic of)
� |
� |
2014-05-21 |
|
[ 98 ]
�
� |
Report of the Correspondence Group on Technical Identification of Digital Signals
�
� |
Chairman, CG Tech. Id. Digital Signals
� |
� |
2014-05-22 |
|
[ 97 ]
�
� |
Working document towards a preliminary draft new Report ITU-R SM.[DVB-T_SERVICE_AREA] - Defining the service area of the DVB-T station for fixed reception
�
� |
Russian Federation
� |
� |
2014-05-21 |
|
[ 96 ]
�
� |
Proposals for revision of Recommendation ITU-R SM.1875-1 - DVB-T coverage measurements and verification of planning criteria
�
� |
Russian Federation
� |
� |
2014-05-21 |
|
[ 95 ]
�
� |
Proposal for the revision of Report ITU-R SM.2257-1 - Spectrum management and monitoring during major events
�
� |
Russian Federation
� |
� |
2014-05-21 |
|
[ 94 ]
�
� |
Working document towards a preliminary draft new Report ITU-R SM.[SPEC_MON_EVOLUTION] - Spectrum monitoring evolution
�
� |
Chairman, CG on Spectrum Monitoring Evolution
� |
235/1
� |
2014-05-21 |
|
[ 93 ]
�
� |
Review of preliminary draft new Recommendation ITU-R SM.[DF_ACCURACY] - Test procedure for measuring DF accuracy
�
� |
MEDAV GmbH
� |
� |
2014-05-15 |
|
[ 92 ]
�
� |
Preliminary draft new Recommendation ITU-R SM.[DOC.____] - Inserting highly precise time information in I/Q data of monitoring receivers
�
� |
Rohde & Schwarz GmbH & Co. KG
� |
� |
2014-05-06 |
|
[ 91 ]
�
� |
Draft revision of Recommendation ITU-R SM.1051-2 - Priority of identifying and eliminating harmful interference in the band 406-406.1 MHz
�
� |
United States of America
� |
� |
2014-04-25 |
|
[ 90 ]
�
� |
Proposal for a new Recommendation on storage of I/Q data
�
� |
Germany (Federal Republic of)
� |
� |
2014-04-22 |
|
[ 89 ]
�
� |
Proposed draft revision of Recommendation ITU-R SM.1268
�
� |
Germany (Federal Republic of)
� |
� |
2014-04-14 |
|
[ 88 ]
�
� |
Liaison statement to Working Party 1A - Copy to Working Parties 1C, 5A, 5B, 5C and ITU-T Study Group 5 - Recommendations ITU-T K.60 and K.mhn - Coexistence of wired and wireless communication systems
�
� |
WP 6A
� |
� |
2014-04-10 |
|
[ 87 ]
�
� |
Editorial modification of Report ITU-R SM.2056
�
� |
Netherlands (Kingdom of the)
� |
� |
2014-03-04 |
|
[ 86 ]
�
� |
Question ITU-R 255/7
�
� |
SG 7
� |
� |
2014-02-27 |
|
[ 85 ]
�
� |
Liaison statement on human exposure to EMF
�
� |
ITU-T SG 5
� |
� |
2014-01-21 |
|
[ 84 ]
�
� |
[Proposal for revision of Report ITU-R SM.2211 - Comparison of time-difference-of-arrival and angle-of-arrival methods of signal geolocation]
�
� |
Russian Federation
� |
� |
2014-01-09 |
|
[ 83 ]
�
� |
[Proposal for revision of Recommendation ITU-R SM.1880 - Spectrum occupancy measurement]
�
� |
Russian Federation
� |
� |
2014-01-09 |
|
[ 82 ]
�
� |
Liaison statement to Working Parties 1C, 5A and 5C - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz
�
� |
WP 5B
� |
� |
2013-12-20 |
|
[ 81 ]
�
� |
Liaison statement to ITU-R Working Party 1A and ITU-T Study Groups 5, 9 & 15 for action (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5C, 5D, 6A, 7B, 7C and 7D por information) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Considerations with respect to work on Recommendations ITU-T G.fast and ITU-T J.195 (J.HINOC-REQ)
�
� |
WP 5B
� |
� |
2013-12-05 |
|
[ 80 ]
�
� |
Liaison statement to Working Party 1C - Draft revision of Recommendation ITU-R SM.1051 - Priority of identifying and eliminating harmful interference in the band 406-406.1 MHz
�
� |
WP 4C
� |
� |
2013-09-30 |
|
[ 79 ]
�
� |
Further consideration of the draft revision of Recommendation ITU-R SM.1051-2 - Priority of identifying and eliminating harmful interference in the band 406-406.1 MHz
�
� |
Chairman, SG 1
� |
� |
2013-06-18 |
|
[ 78 ]
�
� |
Liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Activities of ITU-T Study Group 5 related to interference between radio signal and device or cable connected to wired broadband networks and cable television networks
�
� |
WP 1A
� |
� |
2013-06-14 |
|
[ 77 ]
�
� |
Liaison statement to ITU-T Study Group 15 for information and action (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T G.fast
�
� |
WP 1A
� |
� |
2013-06-14 |
|
[ 76 ]
�
� |
Liaison statement to Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Streamlining future cooperation within ITU-R and liaison with ITU-T
�
� |
WP 1A
� |
� |
2013-06-14 |
|
[ 75 ]
�
� |
Liaison statement to ITU-T Study Group 9 (Copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-T Study Group 5) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - considerations with respect to work on Recommendation ITU-T J.195 (J.HiNoC-req)
�
� |
WP 1A
� |
� |
2013-06-14 |
Results:174 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):