Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 553 ]
�
� |
Liaison statement to Study Group 1 (for information to Study Group 7 and Working Parties 1A, 1B, 4A, 4C, 5B and 5C) - Definitions for adjacent channel leakage power ratio (ACLR) and adjacent channel selectivity (ACS)
�
� |
WP 6A
� |
� |
2011-10-10 |
|
[ 552 ]
�
� |
Liaison statement to Working Party 5C - Statistical methodology for assessing the interference of the satellite services on a fixed service deployment
�
� |
WP 4A
� |
� |
2011-10-06 |
|
[ 551 ]
�
� |
Liaison statement to Working Party 5C - Proposed re-examination of Recommendation ITU-R SF.1650-1
�
� |
WP 4A
� |
� |
2011-10-06 |
|
[ 550 ]
�
� |
Liaison statement to Working Party 5C - Regarding the future disposition of Recommendation ITU-R SF.674-2 "Determination of the impact on the fixed service operating in the 11.7-12.2 GHz band when geostationary fixed-satellite service networks in Region 2 exceed the power flux-density thresholds in Resolution 77 (WRC-200)"
�
� |
WP 4A
� |
� |
2011-10-06 |
|
[ 549 ]
�
� |
Liaison statement to Working Party 5C - Revision of Recommendation ITU-R F.1245-1
�
� |
WP 4A
� |
� |
2011-10-06 |
|
[ 548 ]
�
� |
Liaison statement to Working Party 5C (and to Working Party 4C for information) - Revision of Recommendation ITU-R F.758 "Consideration in the development of criteria for sharing between the fixed service and other services" and ITU-R F.1495 "Interference criteria to protect the fixed service from time varying aggregate interference from other Radiocommunication services sharing..
�
� |
WP 4A
� |
� |
2011-10-06 |
|
[ 547 ]
�
� |
Liaison statement to Working Parties 5A, 5C, 5D and 7D - Assessment of interference into the broadcasting service from other services/applications
�
� |
WP 6A
� |
� |
2011-10-06 |
|
[ 546 ]
�
� |
Liaison statement to Working Party 5C - Power flux density (pfd) level for gateway links for High Altitude Platform Stations (HAPS) in the frequency band 5 850-7 075 MHz
�
� |
WP 4A
� |
� |
2011-10-05 |
|
[ 545 ]
�
� |
Liaison statement to ITU-T Study Groups 11, 13 and 17, and to ITU-R Working Parties 4B and 5C - Migration from existing networks to next-generation networks for developing countries: technical, regulatory and policy aspects
�
� |
ITU-D SG 2, Question 26/2
� |
� |
2011-10-05 |
|
[ 544 ]
�
� |
Liaison statement to Working Party 5C (copy to Working Party 7D for information) - Coexistence between fixed service operating in 71-76 GHz 81-86 GHz and 92-94 GHz bands and passive services
�
� |
WP 7C
� |
� |
2011-10-04 |
|
[ 543 ]
�
� |
Liaison statement to ITU-R Working Party 5C - Studies regarding WRC-12 Agenda item 1.20 involving EESS (passive) and HAPS gateway stations
�
� |
WP 7C
� |
� |
2011-10-04 |
|
[ 542 ]
�
� |
Liaison statement to Working Party 5C - Coexistence between fixed service operating in 71-76 GHz, 81-86 GHz and 92-94 GHz bands and passive services
�
� |
WP 7D
� |
� |
2011-10-04 |
|
[ 541 ]
�
� |
Liaison statement to Study Group 1 (copy to Study Groups 5, 6, 7 and Working Party 1A) - A database for the protection of radio services
�
� |
WP 4A
� |
� |
2011-09-29 |
|
[ 540 ]
�
� |
Liaison statement to Study Group 1 (copy to Study Groups 5, 6, 7 and Working parties 1A, 4A) - A database for the protection of radio services
�
� |
WP 4C
� |
� |
2011-09-28 |
|
[ 539 ]
�
� |
Liaison statement to Working Party 5C and ITU-D Study Group 2 - Development of a Handbook on "Global trends in IMT" and a Report on "Broadband access technology"
�
� |
WP 4B
� |
� |
2011-09-26 |
|
[ 538 ]
�
� |
Liaison statement to Working Party 5C - Impact of increased MSS emissions
�
� |
WP 4C
� |
� |
2011-09-26 |
|
[ 537 ]
�
� |
Proposed revision of preliminary draft new Recommendation ITU-R F.[71-86 GHz] - Radio-frequency channel arrangements for fixed wireless systems operating in the 71-76 and 81-86 GHz bands
�
� |
France
� |
� |
2011-09-20 |
|
[ 536 ]
�
� |
Liaison statement to Working Party 5C (copy to Working Party 4A for information) - Proposed revisions to Recommendation ITU-R F.758
�
� |
WP 4C
� |
� |
2011-09-21 |
|
[ 535 ]
�
� |
Frequency band using for electronic news gathering, outside broadcast and program field production
�
� |
Regional Commonwealth in the Field of Communications
� |
89/6
� |
2011-09-19 |
|
[ 534 ]
�
� |
Liaison statement to Working Party 5C - Studies in support of WRC-12 Agenda item 1.5
�
� |
WP 4C
� |
� |
2011-09-19 |
|
[ 533 ]
�
� |
Liaison statement to Study Group 1 and Working Party 1A (copy to Study Groups 4, 6 and 7) - A database for the protection of radio services
�
� |
WPs 5A, 5B, 5C, 5D
� |
� |
2011-08-23 |
|
[ 532 ]
�
� |
Reply liaison statement to ITU-R Working Party 5C on "Multiple Gigabit Wireless Systems in frequencies around 60 GHz"
�
� |
WP 5A
� |
� |
2011-06-27 |
|
[ 531 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5B, 5C, 7B, 7C and 7D - On proposed revisions to Recommendation ITU-R M.1732
�
� |
WP 5A
� |
� |
2011-06-27 |
|
[ 530 ]
�
+Ann.1-20� |
Report of the seventh meeting of Working Party 5C (Geneva, 13 - 21 June 2011)
�
� |
Chairman, WP 5C
� |
� |
2011-06-22 |
|
[ 529 ]
�
� |
Final List of Participants - Working Party 5C
�
� |
Director, BR (W)
� |
� |
2011-06-22 |
|
[ 528 ]
�
� |
Proposed joint liaison statement to Study Group 1 and Working Party 1A - A database for the protection of radio services
�
� |
Chairman, WP 5A
� |
� |
2011-06-20 |
|
[ 527 ]
�
� |
Reply liaison statement to Working Party 5C regarding the selection of "tuning ranges" for electronic news gathering ("ENG") equipment
�
� |
WP 5B
� |
� |
2011-06-17 |
|
[ 526 ]
�
� |
Liaison statement to ITU-R Working Parties 4B and 5C - Question 26/2 - Migration from existing networks to next-generation networks for developing countries: technical, regulatory and policy aspects
�
� |
ITU-D SG 2 (W)
� |
� |
2011-06-14 |
|
[ 525 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2011-06-13 |
|
[ 524 ]
�
� |
Results of the 18th RAG meeting
�
� |
Chairman, SG 5
� |
� |
2011-06-13 |
|
[ 523 ]
�
� |
Liaison statement to ITU-R Working Parties 4C, 5A, 5B, 5C 6A and 7D (copy to ITU-R Working Party 3L and to ITU-T Study Groups 5 and 15 for information and/or action if any) - Developments on PLT systems
�
� |
WP 1A
� |
� |
2011-06-10 |
|
[ 522 ]
�
� |
Liaison statement to Study Groups 4, 5, 6 and 7 and relegvant Working Parties (copy to ITU-T Study Group 15) - Activities regarding the protection range calculation between inductive systems and radiocommunication services using frequencies below 30 MHz
�
� |
WP 1A
� |
� |
2011-06-10 |
|
[ 521 ]
�
� |
Liaison statement to Study Groups 4, 5, 6 and 7 and relevant Working Parties - Protection of radiocommunication services using digital modulation against interference caused by radiation from industrial, scientific and medical (ISM) equipment
�
� |
WP 1A
� |
� |
2011-06-09 |
|
[ 520 ]
�
� |
Liaison statement to Study Groups 4, 6 and 7 and Working Parties 5A, 5B, 5C and 5D on a database for the protection of radio services
�
� |
SG 1
� |
� |
2011-06-08 |
|
[ 519 ]
�
� |
Proposed draft liaison statement to Working Party 5B on the study of feasibility of sharing sub-bands between oceanographic radars and fixed and mobile services within the 3-50 MHz band
�
� |
Canada
� |
� |
2011-06-06 |
|
[ 518 ]
�
� |
Working document towards a preliminary draft new Report ITU-R F.[FS/PASSIVE - 70-80 GHz] - Compatibility analysis between Earth exploration-satellite service (EESS) (passive) systems operating in the 86-92 GHz band and fixed service (FS) systems operating in the adjacent 81-86 GHz band
�
� |
Canada
� |
� |
2011-06-06 |
|
[ 517 ]
�
� |
Proposal for revision of Recommendation ITU-R F.636-3 - Radio-frequency channel arrangements for fixed wireless systems operating in the 15 GHz band
�
� |
Canada
� |
� |
2011-06-06 |
|
[ 516 ]
�
� |
Proposal for preliminary draft revision of Recommendation ITU-R F.1245-1 - Mathematical model of average and related radiation patterns for line-of-sight point-to-point radio-relay system antennas for use in certain coordination studies and interference assessment in the frequency range from 1 GHz to about 70 GHz
�
� |
Canada
� |
� |
2011-06-06 |
|
[ 515 ]
�
� |
Proposal for development of a new ITU-R Question on future trends of technologies and applications for the fixed service
�
� |
Japan
� |
� |
2011-06-06 |
|
[ 514 ]
�
� |
Further review on the Questions assigned to Working Party 5C
�
� |
Japan
� |
� |
2011-06-06 |
|
[ 513 ]
�
� |
Proposed modifications to the working document towards a preliminary draft revision of Recommendation ITU-R F.1336-2
�
� |
Japan
� |
242/5
� |
2011-06-06 |
|
[ 512 ]
�
� |
Proposed modifications to preliminary draft revision of Recommendation ITU-R F.1245-1 - Additional information on cross polarization isolation (XPI) data for point-to-point fixed service (FS) antennas
�
� |
Japan
� |
110/5
� |
2011-06-06 |
|
[ 511 ]
�
� |
Proposed modifications to preliminary draft revision of Report ITU-R F.2107-1 - Characteristics and applications of fixed wireless systems operating in frequency ranges between 57 GHz and 134 GHz
�
� |
Japan
� |
� |
2011-06-06 |
|
[ 510 ]
�
� |
Liaison statement to Working Party 5D (copy to Working Parties 5A and 5C for information) - Protection of digital terrestrial television broadcasting services from interference generated by mobile services including IMT systems where identified in the Radio Regulations
�
� |
WP 6A
� |
� |
2011-06-06 |
|
[ 509 ]
�
� |
Liaison statement to Working Party 5C - Draft revision of Recommendation ITU-R F.758-4
�
� |
WP 6A
� |
� |
2011-06-06 |
|
[ 508 ]
�
� |
Proposed revisions to PDNR ITU-R F.[HAPS-GATEWAY]
�
� |
United States of America
� |
� |
2011-06-03 |
|
[ 507 ]
�
� |
An experimental study for the evaluation of sharing criteria between HF oceanographic radars and digital data systems - A proposed update to PDNR ITU-R M.[RLS 3-50 MHz SHARING] the feasibility of sharing sub-bands between oceanographic radars and fixed and mobile services within the 3-50 MHz band
�
� |
Canada
� |
� |
2011-06-03 |
|
[ 506 ]
�
� |
Preliminary draft new Recommendation ITU-R F.[71-95 GHz] - Radio-frequency channel arrangements for fixed service systems operating in the 71-95 GHz range
�
� |
Korea (Republic of)
� |
247/5
� |
2011-06-03 |
|
[ 505 ]
�
� |
IMT systems information for handbook on "Guidance for bilateral frequency use discussions on fixed/land mobile systems in the frequency range above 29.7 MHz - [39.5 GHz]"
�
� |
Russian Federation
� |
� |
2011-06-02 |
|
[ 504 ]
�
� |
Draft reply of liaison statement to Working Party 4C in relation to WRC-12 Agenda item1.18
�
� |
Russian Federation
� |
� |
2011-06-02 |
Results:603 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):