Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 112 ]
�
� |
Working document towards revision of Recommendation ITU-R SM.1753-1 on techniques for radio noise data analysis
�
� |
Japan
� |
� |
2010-09-13 |
|
[ 111 ]
�
� |
Working document towards a preliminary draft new Report - On measurement facilities available for space radio monitoring
�
� |
Japan
� |
232/1
� |
2010-09-13 |
|
[ 110 ]
�
� |
Working document towards revision of Recommendation ITU-R SM.1753-1 on radio noise measurement antenna
�
� |
Japan
� |
� |
2010-09-13 |
|
[ 109 ]
�
� |
Revision of Recommendation ITU-R SM.1392-1 - Essential requirements for a spectrum monitoring station for developing countries
�
� |
Thales Communications
� |
� |
2010-09-13 |
|
[ 108 ]
�
� |
Spectrum occupancy measurements - Proposal to merge Recommendations ITU-R SM.182, ITU-R SM.1536, ITU-R SM.1793 and ITU-R SM.1809 into a new Recommendation
�
� |
Chairman, WP 1C Corresp. Group on
� |
233/1
� |
2010-09-13 |
|
[ 107 ]
�
� |
Preliminary draft new Question ITU-R _ _ _ / 1 - Spectrum Monitoring Evolution
�
� |
France
� |
� |
2010-09-10 |
|
[ 106 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R SM.[SRD MEAS] - SRD measurements
�
� |
Chairman, WP 1C Corresp. Grp. on SRD
� |
� |
2010-09-09 |
|
[ 105 ]
�
� |
Chairperson's report of the Correspondence Group on review of ITU-R Recommendations and Reports developed by WP 1C
�
� |
Korea (Republic of)
� |
� |
2010-09-10 |
|
[ 104 ]
�
� |
Preliminary draft revision of Recommendation ITU-R SM.1600 - Technical identification of digital signals
�
� |
Korea (Republic of)
� |
� |
2010-09-10 |
|
[ 103 ]
�
� |
Working document towards a preliminary draft new Report on measurement facilities available for the measurement of emissions from both GSO and non-GSO space stations
�
� |
Korea (Republic of)
� |
232/1
� |
2010-09-10 |
|
[ 102 ]
�
� |
Revision of Recommendation ITU-R SM.1392-1 - Essential requirements for a spectrum monitoring station for developing countries
�
� |
TCI International, Inc.
� |
� |
2010-09-10 |
|
[ 101 ]
�
� |
Proposal for a new ITU-R Report - Spectrum management and monitoring during major events
�
� |
China (People's Republic of)
� |
� |
2010-09-07 |
|
[ 100 ]
�
� |
Preliminary draft new Report ITU-R SM.[APP10] - Use of RR Article 15, Appendix 10 to convey information related to emissions from both GSO and non-GSO space stations including geolocation information
�
� |
China (People's Republic of)
� |
232/1
� |
2010-09-07 |
|
[ 99 ]
�
� |
Working document towards a preliminary draft new Report - Measurement facilities available for the measurement of emissions from both GSO and non-GSO space stations
�
� |
China (People's Republic of)
� |
� |
2010-09-07 |
|
[ 98 ]
�
� |
Revision of Recommendation ITU-R SM.1392-1 - Essential requirements for a spectrum monitoring station for developing countries
�
� |
Saudi Arabia (Kingdom of)
� |
� |
2010-09-01 |
|
[ 97 ]
�
� |
Satellite monitoring facilites operated by regulatory authorities
�
� |
United States of America
� |
� |
2010-08-27 |
|
[ 96 ]
�
� |
Short range device measurement standards used in USA
�
� |
United States of America
� |
� |
2010-08-27 |
|
[ 95 ]
�
� |
Question ITU-R 230/1 on unwanted radar emission measurements
�
� |
Germany (Federal Republic of)
� |
� |
2010-08-03 |
|
[ 94 ]
�
� |
Revision of Recommendation ITU-R SM.1392-1 - Essential requirements for a spectrum monitoring station for developing countries
�
� |
Germany (Federal Republic of)
� |
� |
2010-08-02 |
|
[ 93 ]
�
� |
Influence of reflection on deviation and MPX measurements of FM broadcast emissions
�
� |
Germany (Federal Republic of)
� |
� |
2010-08-02 |
|
[ 92 ]
�
� |
Preliminary draft revision of Recommendation ITU-R SM.1268 - Method of measuring the maximum frequency deviation of FM broadcasting emissions at monitoring stations
�
� |
Germany (Federal Republic of)
� |
� |
2010-08-02 |
|
[ 91 ]
�
� |
Note from the Chairman of Working Party 1A to the Chairman of Working Party 1C - Draft liaison statement to ITU-R Working Parties 1A and 5A (copy for information to ITU-T Study Group 5) - Isolation between co-located antennas of systems in the land mobile service including IMT
�
� |
Chairman, WP 1A
� |
� |
2010-07-12 |
|
[ 90 ]
�
� |
Satellite ground control center and Communication system monitoring in Akkol town, Akmolinskaya region, the Republic of Kazakhstan
�
� |
Kazakhstan (Republic of)
� |
� |
2010-07-07 |
|
[ 89 ]
�
+Add.1-7� |
Executive Report of the Rapporteur Group on Spectrum Monitoring Handbook issues
�
� |
WP 1C Rapporteur Group on the SMH
� |
� |
2010-07-01 |
|
[ 88 ]
�
� |
Liaison statement to Working Party 1C - Useful information for understanding the underlying phenomena of power line networks - Impact from PLT systems and measurement methods
�
� |
WP 7D
� |
218/1
� |
2010-06-17 |
|
[ 87 ]
�
� |
Liaison statement to Working Party 1C - Radar emission measurements in the out of band domain
�
� |
WP 5B
� |
230/1
� |
2009-12-14 |
|
[ 86 ]
�
� |
Reply to a liaison statement from Working Party 1C (copy to WP 3L) - Radio noise in the HF frequency band
�
� |
WP 5C
� |
231/1
� |
2009-12-08 |
|
[ 85 ]
�
� |
ITU-R Study Group 3 Question to be brought to the attention of ITU-R Study Group 1
�
� |
BR Study Group Department
� |
� |
2009-11-20 |
|
[ 84 ]
�
� |
Reply liaison statement to ITU-R WP 1C on actions related to WTSA-08 Resolution 72
�
� |
ITU-T SG 5
� |
� |
2009-10-21 |
|
[ 83 ]
�
� |
Spectrum Monitoring Handbook Edition 2010 - Report of the 2nd meeting of the Rapporteur's Group on Spectrum Monitoring Handbook issues
�
� |
Rapporteur, WP 1C Rapporteur Group on SMH issues
� |
� |
2009-10-19 |
|
[ 82 ]
�
� |
Reply liaison statement to ITU-D Study Group 2 - Resolution 9 (Rev. DOHA, 2006), draft guidelines for the establishment of a system of fees (copy for information to Working Parties 1B and 1C)
�
� |
ITU-R SG 1
� |
� |
2009-10-09 |
|
[ 81 ]
�
+Ann.1-10� |
Report on the meeting of Working Party 1C (Geneva, 16 - 22 September 2009)
�
� |
Chairman, WP 1C
� |
� |
2009-09-23 |
|
[ 80 ]
�
(Rev.1)� |
Final List of Participants - Geneva, 16-22 September 2009
�
� |
Director, BR
� |
� |
2009-09-22 |
|
[ 79 ]
�
� |
Preliminary review of ITU-R Questions assigned to Study Group 1
�
� |
Rapporteur Group on ITU-R Questions
� |
� |
2009-09-21 |
|
[ 78 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2009-09-15 |
|
[ 77 ]
�
� |
Review Circular Letter CR/159
�
� |
Chairman WP 1C
� |
� |
2009-09-08 |
|
[ 76 ]
�
� |
Comments on Document 1C/57 - Preliminary draft new Question ITU-R ___/1 - Standardized interface between SMS4DC and radiomonitoring equipment
�
� |
Thales Communications
� |
� |
2009-09-09 |
|
[ 75 ]
�
� |
Working document towards a preliminary draft new Report on measurement techniques for power line high data rate telecommunication systems
�
� |
CBS, Inc.
� |
� |
2009-09-09 |
|
[ 74 ]
�
� |
Support to contributions from Broadcasting Organizations
�
� |
European Broadcasting Union (EBU)
� |
� |
2009-09-09 |
|
[ 73 ]
�
� |
Preliminary draft revision of Recommendation ITU-R SM.1753 - Radio noise measurements
�
� |
Germany (Federal Republic of)
,
Korea (Republic of)
� |
� |
2009-09-09 |
|
[ 72 ]
�
� |
Working document towards a preliminary draft new Report - HF man-made noise measurements
�
� |
Germany (Federal Republic of)
� |
214-3/3
� |
2009-09-09 |
|
[ 71 ]
�
� |
Complementary study to the document "Alternative method on measuring interference from power line high data rate telecommunications systems using mobile monitoring station" (Question ITU-R 218/1)
�
� |
Brazil (Federative Republic of)
� |
218/1
� |
2009-09-08 |
|
[ 70 ]
�
� |
Broadband over power (BPL/PLT) studies and testing
�
� |
CBS, Inc.
� |
� |
2009-09-08 |
|
[ 69 ]
�
� |
Working document towards a preliminary draft new Report on measurement techniques for power line high data rate telecommunication systems
�
� |
CBS, Inc.
� |
� |
2009-09-08 |
|
[ 68 ]
�
� |
Working document towards a preliminary draft new Report - On measurement techniques for power line high data rate telecommunication systems
�
� |
North American Broadcasters Association (NABA)
� |
� |
2009-09-08 |
|
[ 67 ]
�
� |
Status of the third stage of the Report on WTDC-06 Resolution 9 (Rev.Doha, 2006)
�
� |
Chairman, SG 1
� |
� |
2009-09-09 |
|
[ 66 ]
�
� |
Preliminary draft new Recommendation ITU-R SM.[6 GHz] - Spectrum monitoring from 20 MHz to 6 GHz
�
� |
United States of America
� |
� |
2009-09-08 |
|
[ 65 ]
�
(Rev.1)� |
New information on measurement guidelines for broadband PLT
�
� |
North American Broadcasters Association (NABA)
� |
� |
2009-09-04 |
|
[ 64 ]
�
� |
Working document towards a preliminary draft new Report - On measurement techniques for power line high data rate telecommunication systems
�
� |
North American Broadcasters Association (NABA)
� |
221/1, 218/1
� |
2009-09-04 |
|
[ 63 ]
�
� |
Proposed revision of Recommendation ITU-R SM.182-5
�
� |
China (People's Republic of)
� |
� |
2009-08-31 |
Results:162 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):