Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 148 ]
�
� |
Proposal with respect to possible the draft new ITU-R Resolution [CRS] "Studies on the implementation and use of cognitive radio systems"
�
� |
Russian Federation
� |
� |
2011-05-26 |
|
[ 147 ]
�
� |
Information document from TSB Director on "ITU-T activities on ICT, climate change and the environment"
�
� |
Director, TSB
� |
� |
2011-05-24 |
|
[ 146 ]
�
� |
Wireless telecommunication standards under development by IEEE 802 containing cognitive radio capabilities for operation in the TV White Space
�
� |
IEEE
� |
� |
2011-05-18 |
|
[ 145 ]
�
� |
Status and comments on the ITU-R Questions, Recommendations and Reports assigned to the Study Group 1
�
� |
Korea (Republic of)
� |
� |
2011-05-18 |
|
[ 144 ]
�
� |
ITU-R Study Group 5 Recommendation ITU-R M.1177-4 to be brought to the attention of Study Groups 1 and 4
�
� |
BR Study Group Department
� |
� |
2011-05-18 |
|
[ 143 ]
�
� |
Liaison to ITU-R on protection of radio services
�
� |
CISPR
� |
� |
2011-05-12 |
|
[ 142 ]
�
� |
Liaison statement to ITU-R Study Group 1 and Study Group 5 regarding G.wnb, narrowband wireless home networking
�
� |
ITU-T SG 5
� |
� |
2011-05-04 |
|
[ 141 ]
�
� |
Liaison statement to ITU-T Study Group 15 on narrowband wireless home networking (copy to ITU-R Study Group 1 and Working Party 5A for information)
�
� |
WP 5D
� |
� |
2011-04-21 |
|
[ 140 ]
�
� |
ITU-R Study Group 6 Question 32-1/6 to be brought to the attention of ITU-R Study Groups 1 and 5
�
� |
BR Study Group Department
� |
� |
2011-03-23 |
|
[ 139 ]
�
(Rev.1)� |
Liaison statement - New versions of the Access Network Transport (ANT) Standardization Overview and Work Plan
�
� |
ITU-T SG 15
� |
� |
2011-03-08 |
|
[ 138 ]
�
� |
Liaison to ITU-R SG 5 and TSAG regarding narrowband wireless home networking
�
� |
ITU-T SG15
� |
� |
2011-03-03 |
|
[ 137 ]
�
� |
Note from Study Group 6 to the RAG proposal for revision to the guidelines for the working methods and/or Resolution ITU-R 1
�
� |
SG 6
� |
� |
2010-12-16 |
|
[ 136 ]
�
+Ann.1-2� |
Summary Record of the meeting of Radiocommunication Study Group 1 (Geneva, 27 September 2010)
�
� |
Chairman, SG 1
� |
� |
2010-09-30 |
|
[ 135 ]
�
� |
Final List of Participants - Study Group 1 (Geneva, 27 September 2010)
�
� |
Director, BR
� |
� |
2010-09-27 |
|
[ 134 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2010-09-24 |
|
[ 133 ]
�
� |
Liaison statement to ITU-R Study Group 1 - Resolution 9 - "Participation of countries, particularly developing countries, in spectrum management"
�
� |
ITU-D SG 2
� |
� |
2010-09-24 |
|
[ 132 ]
�
(Rev.1)� |
Draft new Recommendation ITU-R SM.[SPEC-OCC-MEASUREMENT] - Spectrum occupancy measurements - Proposal to merge Recommendations ITU-R SM.182, ITU-R SM.1536 and ITU-R SM.1793 into a new Recommendation
�
� |
WP 1C
� |
� |
2010-09-24 |
|
[ 131 ]
�
� |
Draft new Report ITU-R SM.[SRD-MEAS] -SRD measurements
�
� |
WP 1C
� |
� |
2010-09-24 |
|
[ 130 ]
�
� |
Draft new Report ITU-R SM.[APP10] - Use of Appendix 10 of the Radio Regulations to convey information related to emissions from both GSO and non-GSO space stations including geolocation information
�
� |
WP 1C
� |
232/1
� |
2010-09-24 |
|
[ 129 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R SM.1268-1 - Method of measuring the maximum frequency deviation of FM broadcast emissions at monitoring stations
�
� |
WP 1C
� |
� |
2010-09-24 |
|
[ 128 ]
�
+Corr.1� |
Draft new Report ITU-R SM.[SPACE_RADIO_MONITORING_FACILITIES] - Measurement facilities available for the measurement of emissions from both GSO and non-GSO space stations
�
� |
WP 1C
� |
232/1
� |
2010-09-24 |
|
[ 127 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R SM.1392-1 - Essential requirements for a spectrum monitoring system for developing countries
�
� |
WP 1C
� |
� |
2010-09-24 |
|
[ 126 ]
�
� |
Liaison statement - Strategies and policies concerning human exposure to electromagnetic fields
�
� |
ITU-D SG 1
� |
� |
2010-09-23 |
|
[ 125 ]
�
� |
Draft new Question ITU-R [SPEC-MONIT-EVOL]/1 - Spectrum monitoring evolution
�
� |
WP 1C
� |
� |
2010-09-23 |
|
[ 124 ]
�
� |
Draft editorial modification of Recommendations ITU-R SM.443-1, SM.1051-2, SM.1139, SM.1270, SM.1393, SM.1394, SM.1836, SM.1837, SM.1838, SM.1839 and SM.1840
�
� |
WP 1C
� |
� |
2010-09-23 |
|
[ 123 ]
�
+Ann.1� |
Executive Report of the Working Party 1C meeting (Amsterdam, 20-24 September 2010)
�
� |
Chairman, WP 1C
� |
� |
2010-09-23 |
|
[ 122 ]
�
� |
Proposal by Syria
�
� |
Syrian Arab Republic
� |
� |
2010-09-20 |
|
[ 121 ]
�
� |
Corrigendum to the table 8 in Appendix 8 to Annex 2 to draft modification of ITU-R Report SM.2153 - "Technical and operating parameters and spectrum use for short-range radiocommunication devices"
�
� |
Ukraine
� |
� |
2010-09-20 |
|
[ 120 ]
�
� |
Support for the Rapporteur Group in high data-rate power line telecommunications
�
� |
CBS, Inc.
� |
� |
2010-09-18 |
|
[ 119 ]
�
� |
Future studies on Recommendation ITU-T G.9960 - Rapporteur Group on hig data-rate power line telecommunications
�
� |
World Broadcasting Unions - Technical Committee
� |
� |
2010-09-16 |
|
[ 118 ]
�
� |
Future studies on Recommendation ITU-T G.9960 - Rapporteur Group on high data-rate power line telecommunications
�
� |
North American Broadcast Association (NABA)
� |
� |
2010-09-16 |
|
[ 117 ]
�
� |
Rapporteur's Report on review on ITU-R Recommendations, Reports and Questions assigned to the Study Group 1
�
� |
Korea (Republic of)
� |
� |
2010-09-15 |
|
[ 116 ]
�
� |
Information about progress status on vehicle gateway platform (VGP) in ITU-T Study Group 16
�
� |
Korea (Republic of)
� |
� |
2010-09-27 |
|
[ 115 ]
�
� |
Proposal for Mr. Chang Ruoting to serve as Vice-Chairman of Study Group 1
�
� |
Chairman, SG 1
� |
� |
2010-09-14 |
|
[ 114 ]
�
� |
Power line high data rate telecommunication systems
�
� |
WP 1A Rapporteur Group on PLT
� |
� |
2010-09-08 |
|
[ 113 ]
�
� |
Executive Report of the meetings of Working Party 1A (Geneva, 1-10 February and 21-28 June 2010)
�
� |
Chairman, WP 1A
� |
� |
2010-09-07 |
|
[ 112 ]
�
� |
Executive Report of the meetings of Working Party 1B (Geneva, 1-10 February and 21-28 June 2010)
�
� |
Chairman, WP 1B
� |
� |
2010-08-31 |
|
[ 111 ]
�
� |
Cooperation with ITU-T on revision of Recommendation ITU-T G.9960
�
� |
Italy
� |
� |
2010-08-11 |
|
[ 110 ]
�
� |
Comments on the DNR "The impact of power line high data rate telecommunication systems on radiocommunication systems below 30 MHz" (Doc. 1/102) and related spectrum issues
�
� |
Italy
� |
� |
2010-08-11 |
|
[ 109 ]
�
� |
Draft new Report ITU-R SM.[ISM] - Impact of ISM equipment on radiocommunication services
�
� |
WP 1A
� |
� |
2010-07-12 |
|
[ 108 ]
�
� |
Draft revision of Report ITU-R SM.2012-2 - Economic aspects of spectrum management
�
� |
WP 1B
� |
� |
2010-07-09 |
|
[ 107 ]
�
� |
Draft modification of Report ITU-R SM.2093 - Guidance on the regulatory framework for national spectrum management
�
� |
WP 1B
� |
� |
2010-07-08 |
|
[ 106 ]
�
� |
Draft modification of Report ITU-R SM.2153 - Technical and operating parameters and spectrum use for short-range radiocommunication devices
�
� |
WP 1B
� |
� |
2010-07-08 |
|
[ 105 ]
�
+Corr.1� |
Draft modification of Report ITU-R SM.2158 - Impact of power line telecommunication systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz
�
� |
WP 1A
� |
221/1
� |
2010-07-07 |
|
[ 104 ]
�
� |
Draft new Question ITU-R [PWRGRD]/1 on impact on Radiocommunication systems from wireless and wired data transmission technologies used for the support of power grid management systems
�
� |
WP 1A
� |
� |
2010-07-02 |
|
[ 103 ]
�
� |
Report of the Joint meeting of Working Parties 1A and 1B (Geneva, 21 June 2010)
�
� |
Chairman, SG 1
� |
� |
2010-07-01 |
|
[ 102 ]
�
� |
Draft new Recommendation ITU-R SM.[PLT] - Power line high data rate telecommunication systems
�
� |
WP 1A
� |
� |
2010-07-08 |
|
[ 101 ]
�
(Rev.1)� |
Draft revision of Annex 5 to Recommendation ITU-R SM.1541-2 - Unwanted emissions in the out-of-band domain
�
� |
WP 1A
� |
� |
2010-06-25 |
|
[ 100 ]
�
� |
Liaison statement - New versions of the access network transport (ANT) standardization overview and work plan
�
� |
ITU-T SG 15
� |
� |
2010-06-22 |
|
[ 99 ]
�
� |
Liaison statement - EMC guidelines for G.9960
�
� |
ITU-T SG 15
� |
4/15
� |
2010-06-23 |
Results:197 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):