International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP3L : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP3L� C�

ITU-R�WP3L

Ionospheric propagation

Results:92 total items.
Result page:� Previous�-� 1 - 2
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 42 ]
Reply to liaison statement to WP 3L - Ionospheric parameters in connection with modelling approaches in support of adaptive HF communication systems in the fixed service � WP 6E 2004-11-23
[ 41 ]
+Ann.1-18
Report on the meeting of Working Party 3L (Geneva, 25-27 October 2004) � Chairman, WP 3L 2004-10-29
[ 40 ]
Final list of Participants � Director, BR 2004-10-26
[ 39 ]
List of documents issued � BR Study Group Department 2004-10-22
[ 38 ]
Liaison statement to WPs 3L, 6E, 7A, 7D, 8A, 8B and 9C - Impact of cable and power line telecommunications systems on radiocommunications systems operating in the LF, MF, HF and VHF bands below 80 MHz � WP 1A 2004-10-20
[ 37 ]
Progress towards the revision of the Recommendation ITU-R P.313-9 and the provision of information relating to short-term prediction � United Kingdom of Great Britain and Northern Ireland 213-1/3 2004-10-12
[ 36 ]
Improvements in the modelling of day to day variability of ionospheric characteristics � United Kingdom of Great Britain and Northern Ireland 229/3 2004-10-12
[ 35 ]
Progress towards the revision of the maps for FOF2 � United Kingdom of Great Britain and Northern Ireland 212-1/3 2004-10-12
[ 34 ]
Draft response to the liaison statement from Working Party 9C (Doc. 3L/18) - Ionospheric parameters in connection with modelling approaches in support of adaptive HF communication systems in the fixed service � United Kingdom of Great Britain and Northern Ireland 2004-10-12
[ 33 ]
Measurements of the Doppler and multipath spread of HF signals received over a path oriented along the mid-latitude trough � United Kingdom of Great Britain and Northern Ireland 229/3, 227-1/3 2004-10-12
[ 32 ]
Modelling the ionospheric trough � United Kingdom of Great Britain and Northern Ireland 229/3, 212/3 2004-10-12
[ 31 ]
The concept of HF nomaly domain � Brazil (Federative Republic of) 229/3 2004-10-11
[ 30 ]
Selection of the path's reference points in LF/MF skywave prediction � LS telcom AG 225/3 2004-10-11
[ 29 ]
Propagation at frequencies below about 2 MHz - Chairman's Report for the period of November 2003 to October 2004 � Chairman, Rapporteur Group 3L-RG2 2004-10-11
[ 28 ]
Proposed revision of Recommendation ITU-R P.684-3 - Prediction of field strength at frequencies below about 150 kHz � Japan 225/3 2004-10-07
[ 27 ]
Nation-wide survey for measuring LF wave field strengths in winter � Japan 225/3 2004-10-07
[ 26 ]
(Rev.1)
Liaison statement to WPs 3L, 6E, 7D, 8A and 8B - Draft CPM text for WRC-07 Agenda item 1.13 � WP 9C 2004-10-06
[ 25 ]
+Add.1
Measurements and Data Banks � Rapporteur Group 3L-RG4, Chairman's Report 225/3 2004-09-30
[ 24 ]
Working document toward a preliminary draft new Recommendation - Radiation and propagation of emissions from access PLT systems using overhead power lines � United States of America 228/3 2004-10-05
[ 23 ]
Boundaries for Europe in LF/MF software � LS Telcom AG 2004-09-30
[ 22 ]
Correction in summation of nuissance field in Recommendation ITU-R P.842-2 � LS Telcom AG 2004-09-29
[ 21 ]
Prediction of propagation parameters for HF digital systems � Australia 229/3 2004-09-27
[ 20 ]
Liaison statement to WP 9C (Copy to WP 6E for information) - Ionospheric parameters in connection with modelling approaches in support of adaptive HF communication systems in the fixed service � Chairman WP 3L 2004-09-16
[ 19 ]
Liaison statement to WPs 3L, 8A and 9C - Establishment of a Rapporteur for the preparation of CPM-06 text on Agenda item 1.13, Resolution 544 � WP 6E 2004-05-18
[ 18 ]
Liaison statement to WP 3L (copy to WP 6E for information) - Discussion of ionospheric parameters for consideration by WP 3L in connection with modelling approaches supporting adaptive HF communication systems in the fixed service � WP 9C 2004-02-27
[ 17 ]
Liaison statement to Working Parties 3J and 3L - Signal intensity measurements in the MF band � WP 9C 2004-02-27
[ 16 ]
+Ann.1-16
Report on the meeting of Working Party 3L, Fortaleza, 26-28 November 2003 � Chairman, WP 3L 2003-12-10
[ 15 ]
Final list of participants � WP 3L 2003-12-01
[ 14 ]
List of documents issued � BR, Study Group Department 2003-11-13
[ 13 ]
Information document on status of ionospheric scintillation model in Recommendation ITU-R P.531 � European Space Agency (ESA) 2003-11-13
[ 12 ]
Measurements and data banks � Chairman, Rapporteur Group 3L-RG4 225/3 2003-11-13
[ 11 ]
A road map for the development of an HF propagation prediction procedure suitable for digitally modulated systems � Convener, Correspondence Group on Prediction of .. 2003-11-13
[ 10 ]
Propagation at frequencies below about 2 MHz - Chairman's Report for the period of July 2002 to November 2003 � Chairman, Rapporteur Group 3L-RG2 2003-11-12
[ 9 ]
Progress report of activities � Convenor, Correspondence Group on Prediction of .. 2003-11-12
[ 8 ]
Liaison statement to Working Parties 3K, 3L and 3M - Compatibility between radiocommunication systems and high data rate telecommunication systems using electricity power supply or telephone distribution wiring � WP 1A 2003-11-11
[ 7 ]
WRC-07 Agenda items and allocation of preparatory work by the CPM06-1 to responsible, contributing and interested groups involving Study Group 3 � BR, SGD 2003-11-11
[ 6 ]
Liaison statement to Working Party 3L - Prediction methods for adaptive HF system operation � Chairman, WP 9C 2003-11-11
[ 5 ]
HF signal intensity anomaly in Equatorial zone � Brazil (Federative Republic of) 229/3 2003-11-10
[ 4 ]
Proposed revision of Recommendation ITU-R P.684-3 - Prediction of field strength at frequencies below about 150 kHz � Japan 225/3 2003-11-04
[ 3 ]
A correction of a typographical error about ionospheric scintillation (Rec. ITU-R P.531-7) � China (People's Republic of) 2003-10-28
[ 2 ]
Proposed modification to Question ITU-R 225-3/3 � Vatican City State 225/3 2003-09-26
[ 1 ]
Documents to be carried over from the 2000-2003 study period � WP 3L 2003-07-21
Results:92 total items.
Result page:� Previous�-� 1 - 2
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2003-10-13