Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 75 ]
�
(Rev.1)� |
This Document has been withdrawn
�
� |
Tele-IP
� |
� |
2001-10-01 |
|
[ 74 ]
�
(Rev.1)� |
This Document has been withdrawn
�
� |
Tele-IP
� |
� |
2001-10-01 |
|
[ 73 ]
�
� |
FS interference criteria in the 38 and 40 GHz band
�
� |
France
� |
� |
2001-10-01 |
|
[ 72 ]
�
� |
Protection criteria for systems in the 14 GHz
�
� |
France
� |
� |
2001-10-01 |
|
[ 71 ]
�
� |
Preliminary Draft Revision of Recommendation ITU-R F.1398 - Question ITU-R 127/9
�
� |
Brazil (Federative Republic of)
� |
� |
2001-10-01 |
|
[ 70 ]
�
� |
Preliminary draft revision of Recommendation ITU-R F.1241
�
� |
Brazil (Federative Republic of)
� |
� |
2001-10-01 |
|
[ 69 ]
�
� |
Proposal for deletion of Recommendations ITU-R F.1092-1 and ITU-R F.1189-1
�
� |
Brazil (Federative Republic of)
� |
� |
2001-10-01 |
|
[ 68 ]
�
� |
Proposed liaison statement to Working Party 3M concerning rain attenuation calculations in Recommendation ITU-R P.530
�
� |
Canada
� |
� |
2001-10-01 |
|
[ 67 ]
�
� |
Report on ITU-T SG 4 (Geneva, 2-13 July 2001)
�
� |
ITU-T SG 4 Rapporteur
� |
� |
2001-10-01 |
|
[ 66 ]
�
� |
Report on ITU-T Sg 13 meeting (Caracas, May 2001)
�
� |
ITU-T SG 13 Rapporteur
� |
� |
2001-10-01 |
|
[ 65 ]
�
� |
Path planning and system design for fixed service systems in a multipath-fading environment
�
� |
Israel (State of)
� |
� |
2001-10-01 |
|
[ 64 ]
�
� |
Response to ITU-R WP 9A on their liaison supporting development of new ITU-T Recommendation G.821.1
�
� |
ITU-T SG 13
� |
� |
2001-10-01 |
|
[ 63 ]
�
� |
IP packet transfer delay in ITU-T Recommendation Y.1541
�
� |
ITU-T SG 13
� |
� |
2001-10-01 |
|
[ 62 ]
�
� |
Response to ITU-R WP 9A on their liaison on the relation between physical layer, IP and ATM parameters
�
� |
ITU-T SG 13
� |
� |
2001-10-01 |
|
[ 61 ]
�
� |
Liaison statement to Working Party 9A concerning - Path planning and system design for fixed service systems in a multipath-fading environment
�
� |
WP 3M
� |
� |
2001-10-01 |
|
[ 60 ]
�
� |
Liaison statement to Working Party 9A concerning - The design of digital radio-relay systems
�
� |
WP 3M
� |
� |
2001-10-01 |
|
[ 59 ]
�
� |
Liaison statement to WP 9A concerning Annex 2 of Recommendation ITU-R P.530
�
� |
WP 3M
� |
� |
2001-10-01 |
|
[ 58 ]
�
� |
Liaison statement to WP 9A concerning multipath fading prediction for link hop lengths less than 7 km
�
� |
WP 3M
� |
� |
2001-10-01 |
|
[ 57 ]
�
� |
Liaison statement to WP 9A concerning conversion from average worst month to shorter worst periods of time
�
� |
WP 3M
� |
� |
2001-10-01 |
|
[ 56 ]
�
� |
Chairman's Report of the meeting of Working Party 9A held in Geneva from 12-19 March 2001
�
� |
Chairman, WP 9A
� |
� |
2001-10-01 |
|
[ 55 ]
�
� |
Liaison Statement to WP 9A
�
� |
WP 4-9S
� |
� |
2001-10-01 |
|
[ 54 ]
�
� |
LS to WP 9A - Interference criteria to protect the fixed service systems from interference produced by GSO and Non-GSO satellites in the 37-40 GHz and 40.5-43.5 GHz bands
�
� |
WP 4-9S
� |
� |
2001-10-01 |
|
[ 53 ]
�
� |
Liaison statement to Working Parties 4A, 4B, 9A and 9B - Fixed service and fixed-satellite service parameters and characteristics in the 38 GHz and 40 GHz bands to be considered under agenda item 1.32 (WRC-03)
�
� |
WP 4-9S
� |
� |
2001-10-01 |
|
[ 52 ]
�
� |
List of documents issued
�
� |
BR Secretariat
� |
� |
2001-10-01 |
|
[ 51 ]
�
� |
Draft Revision of Recommendation ITU-R F.592-2
�
� |
SG 9
� |
� |
2001-10-01 |
|
[ 50 ]
�
� |
Proposed preliminary draft new Recommendation - Evaluation and planning of Fixed Service Radio System in a multipath fading environment
�
� |
Tele-IP
� |
� |
2001-10-01 |
|
[ 49 ]
�
� |
An introduction to the proposed preliminary draft new Recommendation evaluation and planning of radio systems in a multipath fading environment
�
� |
Tele-IP
� |
� |
2001-10-01 |
|
[ 48 ]
�
� |
Preliminary Draft Revision of Rec. ITU-R F.592 - Terminology used for Radio-Relay Systems
�
� |
Russian Federation
� |
� |
2001-10-01 |
|
[ 47 ]
�
� |
Inconsistency between error performance objectives approaches for bit rates below and above the primary rate
�
� |
Russian Federation
� |
� |
2001-10-01 |
|
[ 46 ]
�
� |
FS interference criteria in the 28 and 40 GHz band
�
� |
France
� |
� |
2001-10-01 |
|
[ 45 ]
�
� |
Working document toward DNR - Interference criteria to protect broadband wireless access systems in the fixed service from aggregate interference from GSO satellites of other services sharing the 37-40 GHz frequency band on a co-primary basis
�
� |
United States of America
� |
� |
2001-10-01 |
|
[ 44 ]
�
� |
DNR ITU-R F.[9A/PDIR]-Perform. degradation due to interfer. from other services sharing the same frequ. bands with real digital radio-relay links used in the intern. and nat. portions of a 27 500 km hypothetical ref. path at or above the prim. rat
�
� |
United States of America
� |
� |
2001-10-01 |
|
[ 43 ]
�
� |
Proposed amendments to PDNR ITU-R [9A/NGSO-3] - Interference criteria to protect the fixed service from time varying aggregate interference from other services sharing the 37-40 and 40.5-43.5 GHz bands on a co-primary basis
�
� |
United States of America
� |
� |
2001-10-01 |
|
[ 42 ]
�
� |
Comparison between the established and newly proposed methodologies for the evaluation of FSS interference impact on FS systems in frequency bands where precipitation attenuation is the predominant fading mechanism
�
� |
United States of America
� |
� |
2001-10-01 |
|
[ 41 ]
�
� |
Fixed Service parameters and future use of the frequency range 37.5 to 42.5 GHz
�
� |
France
� |
� |
2001-10-01 |
|
[ 40 ]
�
� |
Protection criteria for FS systems in the 6 GHz and 14 GHz band
�
� |
France
� |
� |
2001-10-01 |
|
[ 39 ]
�
� |
A process for incorporation of QoS into F-Series Recommendations
�
� |
Canada
� |
� |
2001-10-01 |
|
[ 38 ]
�
� |
Review of Recommendation ITU-R F.745 (Resolution ITU-R 44)
�
� |
Brazil (Federative Republic of)
� |
� |
2001-10-01 |
|
[ 37 ]
�
� |
Proposal for deletion of Recommendations ITU-R F.1189 and ITU-R F.1092
�
� |
Brazil (Federative Republic of)
� |
� |
2001-10-01 |
|
[ 36 ]
�
� |
Proposed modification to Recommendations ITU-R F.1491 and ITU-R F.1397
�
� |
Brazil (Federative Republic of)
� |
� |
2001-10-01 |
|
[ 35 ]
�
� |
Proposal for advancing the work on models for planning, evaluating the operation and estimating error performance of fixed radio systems
�
� |
Telia AB, Farsta
� |
� |
2001-10-01 |
|
[ 34 ]
�
� |
Proposed updating of certain Recommendations which are not reprinted including Recommendation ITU-R F.745
�
� |
Japan
� |
� |
2001-10-01 |
|
[ 33 ]
�
� |
Liaison statement to ITU-T Study Group 4 (Q.3/4, SG 11 (Q.BICC/11), SG 2 and ITU-R Working Parties 4B & 9A, JRG 8A-9B
�
� |
ITU-T SG 13
� |
� |
2001-10-01 |
|
[ 32 ]
�
� |
Liaison statement - Progress on Recommendations on availability of the physical layer
�
� |
ITU-T SG 13
� |
� |
2001-10-01 |
|
[ 31 ]
�
� |
Liaison statement to WP 9A - Derivation of fixed service interference criteria in the 5 925-6 425 MHz band
�
� |
WP 4-9S
� |
� |
2001-10-01 |
|
[ 30 ]
�
� |
Liaison to Study Group 9 - Conclusions of Study Group 9 meeting concerning future status of Joint Rapporteur Group 8A-9B and restructuring of SG 9 related activities
�
� |
SG 8
� |
� |
2001-10-01 |
|
[ 29 ]
�
� |
Liaison statement to Working Parties 9A, 9B and 4A - A new methodology to be used for the evaluation of the impact of space-to-Earth interference from the fixed-satellite service on the fixed service in frequency bands where ...
�
� |
WP 4-9S
� |
� |
2001-10-01 |
|
[ 28 ]
�
� |
Chairman's Report of the meeting of Working Party 9A held in Geneva (18-25 September 2000)
�
� |
Chairman, WP 9A
� |
� |
2001-10-01 |
|
[ 27 ]
�
� |
List of documents issued
�
� |
BRSGD
� |
� |
2001-10-01 |
|
[ 26 ]
�
� |
Consideration of the structure of ITU-R Study Group 9
�
� |
Canada
� |
� |
2001-10-01 |
Results:125 total items. Result page:�
Previous�-�
1 -
2 -
3
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):