Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 299 ]
�
� |
Liaison statement from Working Party 8F - Interference from BSS (sound) into terrestrial IMT-2000 systems
�
� |
WP 8F
� |
� |
2002-10-17 |
|
[ 298 ]
�
� |
Liaison statement to Task Group 1/7 and Working Parties 4A and 6S - Compatibility between FSS/BSS systems operating below 42.5 GHz and RAS antenna operating in the band 42.5-43.5 GHz
�
� |
WP 7D
� |
� |
2002-10-09 |
|
[ 297 ]
�
� |
Report of the fourth meeting of ITU-R Working Party 6S (Geneva, 4-13 September 2002)
�
� |
Chairman, WP 6S
� |
� |
2002-10-11 |
|
[ 296 ]
�
� |
Final List of Participants - Working Party 6S
�
� |
Director, BR
� |
� |
2002-09-12 |
|
[ 295 ]
�
� |
Response from WP 6E to liaison statements from WP 4A, WP 6S and TG 6/8 and liaison statement to WP 7D, WP 8A, WP 8B, WP 8D and WP 9D
�
� |
WP 6E
� |
268/11
� |
2002-09-10 |
|
[ 294 ]
�
� |
Proposals by the Steering Committee Meeting
�
� |
Chairman, SG 6
� |
� |
2002-09-10 |
|
[ 293 ]
�
� |
Liaison statement to ITU-R WP's 6E and WP 6S
�
� |
WP 6M
� |
� |
2002-09-09 |
|
[ 292 ]
�
� |
List of documents issued
�
� |
BRSGD
� |
� |
2002-09-03 |
|
[ 291 ]
�
� |
Further work towards a draft new Report on "Average antenna gain at a fixed elevation angle and antenna gain for any azimuth and elevation for consideration in terrestrial and satellite system sharing studies"
�
� |
Brunei Darussalam
� |
219/10
� |
2002-09-03 |
|
[ 290 ]
�
� |
Further considerations on the minimum Earth station antenna size to be considered in Inter-Regional/Inter-Service sharing at 12 GHz
�
� |
France
� |
� |
2002-09-02 |
|
[ 289 ]
�
� |
Protection requirements for terrestrial broadcasting services in the 620-790 MHz band against potential interference from broadcasting HEO satellite systems
�
� |
European Broadcasting Union (EBU)
� |
� |
2002-08-30 |
|
[ 288 ]
�
� |
Progress Report of SRG-5 for interactive satellite broadcasting systems (television, sound and data)
�
� |
SRG-5
� |
26/6
� |
2002-08-30 |
|
[ 287 ]
�
� |
Proposal for clarification of out-of-band emissions masks for broadcasting-satellite systems
�
� |
France
� |
� |
2002-08-30 |
|
[ 286 ]
�
� |
Review of the scope of Task Group 6/9
�
� |
France
� |
� |
2002-08-29 |
|
[ 285 ]
�
� |
Reply to the request in Document 6S/246
�
� |
Director, BR
� |
� |
2002-08-29 |
|
[ 284 ]
�
� |
Review and organization of work fourth meeting 4-13 September, 2002
�
� |
Chairman, WP 6S
� |
� |
2002-09-05 |
|
[ 283 ]
�
� |
Recommendation ITU-R BO.1373-1
Use of BSS assignments for FSS transmissions
�
� |
Director, BR
� |
� |
2002-08-29 |
|
[ 282 ]
�
� |
Protection of the broadcasting service from emissions of BSS systems using digital transmissions in the band 620-790 MHz
�
� |
France
� |
� |
2002-08-28 |
|
[ 281 ]
�
� |
Technical characteristics of a HEO system operating between 620-790 MHz in the BSS
�
� |
France
� |
� |
2002-08-28 |
|
[ 280 ]
�
� |
Continuous curves of epfd in BSS bands where Article 22 applies
�
� |
United States of America
� |
231/4
� |
2002-08-28 |
|
[ 279 ]
�
� |
Power flux-density values and associated calculation methodology for inter-Regional protection of the BSS from the GSO FSS in the band 11.7-12.7 GHz or non-planned BSS in the band 12.5-12.7 GHz
�
� |
United States of America
� |
223/11
� |
2002-08-28 |
|
[ 278 ]
�
� |
Considerations in the development of a Recommendation on Interactive Satellite Broadcasting Systems
�
� |
Japan
� |
� |
2002-08-28 |
|
[ 277 ]
�
� |
Consolidation of work on an availability performance objective for digital multiprogramme BSS systems
�
� |
Hughes Electronics
� |
3/6
� |
2002-08-27 |
|
[ 276 ]
�
� |
Proposed reply from Working Party 6S to Liaison Statement from Working Party 1A concerning the revision of Annex 3 to Appendix 30
�
� |
Canada
� |
� |
2002-08-27 |
|
[ 275 ]
�
� |
Coordination of transmitting terrestrial stations or transmitting FSS earth stations with BSS earth stations: comparison of protection offered by Annex 3 to Appendix 30 and Appendix 7
�
� |
Canada
� |
� |
2002-08-27 |
|
[ 274 ]
�
� |
KU-Band duplex feed antenna measurements
Emission mask exceedance analysis
�
� |
Canada
� |
� |
2002-08-27 |
|
[ 273 ]
�
� |
review.....
�
� |
Korea (Republic of)
� |
223/11
� |
2002-08-26 |
|
[ 272 ]
�
� |
Review of working document towards a preliminary draft new Recommendation - Guidelines for use by administrations on power flux-density values and associated calculation methodology for interregional protection of the FSS from planned BSS in the band 11.7-12.7 GHz (Resolution 540 (WRC-2000))
�
� |
Korea (Republic of)
� |
� |
2002-08-26 |
|
[ 271 ]
�
� |
Regulatory aspects of the sharing between non-GSO BSS (sound) systems and the terrestrial services in the band 2 630-2 655 MHz
�
� |
Japan
� |
� |
2002-08-26 |
|
[ 270 ]
�
� |
Preliminary draft new Recommendation ITU-R BO.[BSS-IMTT-2000] - Power flux-density threshold levels between systems in the broadcasting-satellite service (sound) in the non-geostationary satellite orbits for space-to-Earth transmissions and mobile service including IMT-2000 systems in the band 2 535-2 655 MHz
�
� |
Japan
� |
204/10
� |
2002-08-26 |
|
[ 269 ]
�
� |
A consideration of refined modelling of a GSO BSS (sound) space station for sharing study between GSO BSS (sound) network and IMT-2000 system
�
� |
Japan
� |
204/10
� |
2002-08-26 |
|
[ 268 ]
�
� |
Sharing study between non-geostationary space stations using highly elliptical orbits in the broadcasting-satellite service (sound) operating in the 2 630-2 655 MHz frequency band and IMT-2000 systems
�
� |
Japan
� |
204/10
� |
2002-08-26 |
|
[ 267 ]
�
� |
Proposal for reply to the liaison statement from WP 8F and for the liaison statement from WP 6S to JRG 6S-8F
�
� |
Japan
� |
204/10
� |
2002-08-26 |
|
[ 266 ]
�
� |
Consideration on minimum antenna size and allowable C/I to protect the BSS plan
�
� |
United States of America
� |
� |
2002-08-26 |
|
[ 265 ]
�
� |
A preliminary draft new Recommendation on mitigation techniques for rain attenuation for BSS systems in frequency bands above 17 GHz
�
� |
Japan
� |
21/6, 22/6
� |
2002-08-26 |
|
[ 264 ]
�
� |
Proposed draft response from WP 6E to liaison statements from WP 4A, WP 6S and TG 6/8 regarding HEO satellite system below 1 GHz
�
� |
Australia
� |
268/11
� |
2002-08-28 |
|
[ 263 ]
�
� |
Status of texts of Study Group 6, its Working Parties and Task Groups
�
� |
BR Secretariat
� |
� |
2002-08-21 |
|
[ 262 ]
�
� |
Proposal for a new study question - Systems to protect personal privacy in interactive broadcasting systems (television, sound and data)
�
� |
European Broadcasting Union (EBU)
� |
� |
2002-08-07 |
|
[ 261 ]
�
� |
Liaison statement to Working Parties 3M and 6S concerning Annex 3 to Appendix 30
�
� |
WP 1A
� |
� |
2002-08-06 |
|
[ 260 ]
�
� |
Use of out-of-band and spurious domains
�
� |
WP 1A
� |
� |
2002-08-06 |
|
[ 259 ]
�
� |
Liaison statement to Working Parties 7C, 7D, 6E, 6S, 4A, 9D, 8A and 3J - Ultra-wideband emissions
�
� |
WPs 1A and 1B
� |
� |
2002-07-31 |
|
[ 258 ]
�
� |
Liaison statement to Working Parties 1A, 3M and 6S - (For information)
�
� |
WG 1 of the SC on reg. and proc. matters
� |
� |
2002-07-15 |
|
[ 257 ]
�
� |
Draft liaison statement to WP 4B, WP 6A and WP 6S on Recommendation J.96, Amendment 1
�
� |
ITU-T SG 9
� |
� |
2002-07-09 |
|
[ 256 ]
�
� |
Liaison statement from WP 8F to WP 6S and JRG 6S-8F - Creation of a Joint Rapporteur Group 6S-8F
�
� |
WP 8F
� |
� |
2001-09-19 |
|
[ 255 ]
�
� |
Liaison statement to Working Party 6S concerning working document towards a PDNR: Blockage factors to be considered in sharing and pfd threshold studies
�
� |
WP 3M
� |
� |
2001-09-19 |
|
[ 254 ]
�
� |
Liaison statement to WPs 4A and 6S - Sharing and compatibility between the fixed-satellite service (space-to-Earth) in the band 17.3-17.7 GHz and the radiolocation service in the band 15.7-17.7 GHz
�
� |
WP 8B
� |
� |
2001-09-19 |
|
[ 253 ]
�
� |
Liaison statement to WPs 6S and 8F - Comments on the proposed methodology for determining the availability loss of terrestrial mobile base stations due to satellite interference
�
� |
WP 8A
� |
� |
2001-09-19 |
|
[ 252 ]
�
� |
Report of the fifth meeting of Study Group 6
�
� |
Chairman, SG 6
� |
� |
2002-09-10 |
|
[ 251 ]
�
� |
Reply to liaison statement from Working Party 6S - Average antenna gain at fixed elevation angle for consideration in terrestrial and satellite systems sharing studies
�
� |
WP 9D
� |
� |
2001-09-19 |
|
[ 250 ]
�
� |
Reply to liaison statement from Working Party 6S - Draft new Recommendation on power flux-density threshold levels for BSS (sound) with respect to FS at 2.6 GHz
�
� |
WP 9D
� |
� |
2001-09-19 |
Results:348 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):