Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 85 ]
�
(Rev.1)� |
Performance and availability objectives for an FSS network operating in the 20/30 GHz band
�
� |
USA
� |
� |
2001-10-01 |
|
[ 84 ]
�
(Rev.1)� |
Fade duration statistics
�
� |
Ch. WP 4B
� |
� |
2001-10-01 |
|
[ 83 ]
�
(Rev.1)� |
Draft modification of Recommendation ITU-R S.1522 - Impact of loss of synchronization and timing recovery on availability in hypothetical reference digital paths
�
� |
India
� |
� |
2001-10-01 |
|
[ 82 ]
�
(Rev.1)� |
Activities within Q.13/SG 13 - Hypothetical reference model of satellite IP network interconnected to terrestrial IP network
�
� |
Japan
� |
� |
2001-10-01 |
|
[ 81 ]
�
(Rev.1)� |
Report of the ITU-T SG 13 meeting in Geneva, 22 January to 1 February 2002
�
� |
EUTELSAT
� |
� |
2001-10-01 |
|
[ 80 ]
�
(Rev.1)� |
Time and date signals
�
� |
EUTELSAT
� |
� |
2001-10-01 |
|
[ 79 ]
�
(Rev.1)� |
Liaison statement - Draft new Question Q.[ets/16] on Emergency Telecommunications Service (ETS)
�
� |
ITU-T SG 16
� |
� |
2001-10-01 |
|
[ 78 ]
�
(Rev.1)� |
Timestamps in satellite transport systems
�
� |
EUTELSAT
� |
� |
2001-10-01 |
|
[ 77 ]
�
(Rev.1)� |
Liaison statement from ITU-T SG 13 on draft Recommendation Y.1541
�
� |
ITU-T SG 13
� |
� |
2001-10-01 |
|
[ 76 ]
�
(Rev.1)� |
Liaison statement - Liaison statement on Interim Q. 13/13 Rapporteur Meeting - "Interoperability of Satellite and Terrestrial Networks
�
� |
ITU-T SG 13
� |
� |
2001-10-01 |
|
[ 75 ]
�
(Rev.1)� |
Preparation for the development of a new Recommendation to complement G.optperf
�
� |
EUTELSAT
� |
� |
2001-10-01 |
|
[ 74 ]
�
(Rev.1)� |
Liaison statement from WP 8D - Basic reference models and performance parameters of IP packet network transmission in the mobile-satellite service
�
� |
WP 8D
� |
� |
2001-10-01 |
|
[ 73 ]
�
(Rev.1)� |
Liaison statement to WPs 3J, 4A, 4B, 6E, 6S, 7B, 7D, 8A, 8B and 9D - Compatibility between Ultra Wideband (UWB) emissions and Radiocommunication Services
�
� |
WP 1A & 1B
� |
� |
2001-10-01 |
|
[ 72 ]
�
(Rev.1)� |
Liaison statement to SG 8, WP 4B, JRG 8A-9B and WP 9B
�
� |
ITU-T SG 15 WP 5/15
� |
� |
2001-10-01 |
|
[ 71 ]
�
(Rev.1)� |
Liaison statement to ITU-R WP 4B - Reply to LS on G.IPCME
�
� |
ITU-T SG 15
� |
� |
2001-10-01 |
|
[ 70 ]
�
(Rev.1)� |
Part 1 - Report of the fourteenth meeting of Working Party 4B (Geneva, 1-8 October 2001)
�
� |
Ch. WP 4B
� |
� |
2001-10-01 |
|
[ 69 ]
�
(Rev.1)� |
Liaison statement to ITU-R WP 9A, 4B, JRG 8A-9B, ITU-T SG 17 and SG 12 - Revisions for draft new Recommendation Y.1541 - Network performance objectives for IP-based services
�
� |
ITU-T SG 13
� |
� |
2001-10-01 |
|
[ 68 ]
�
(Rev.1)� |
List of documents issued
�
� |
BRSGD
� |
� |
2001-10-01 |
|
[ 67 ]
�
(Rev.1)� |
Working document towards a draft new Recommendation - Influence of BER over QoS for TCP and UDP traffic over satellite networks with differentiated services
�
� |
USA
� |
� |
2001-10-01 |
|
[ 66 ]
�
(Rev.1)� |
Quality of Service - Support in the Internet - Elaboration of the concept and the influence of the operation of TCP on the end-to-end performance
�
� |
EUTELSAT
� |
� |
2001-10-01 |
|
[ 65 ]
�
(Rev.1)� |
Report of the 1st meeting of the ICG on satellite matters (Ankara, Turkey, 26-28 June 2001)
�
� |
Ch. ICG-SAT
� |
� |
2001-10-01 |
|
[ 64 ]
�
(Rev.1)� |
A performance comparison of Ku band versus frequencies above 17 GHz in the fixed satellite service for the use of telemetry, tracking and command (TT&C) above 17 GHz
�
� |
Canada
� |
� |
2001-10-01 |
|
[ 63 ]
�
(Rev.1)� |
Report on ITU-T SG 15 activities
�
� |
EUTELSAT
� |
� |
2001-10-01 |
|
[ 62 ]
�
(Rev.1)� |
Discussion on Satellite IP network system and relation between physical layer and IP parameters (Question ITU-R 263/4)
�
� |
Japan
� |
� |
2001-10-01 |
|
[ 61 ]
�
(Rev.1)� |
Working Document towards a draft new Recommendation on TCP/IP performance over satellite links - A possible method to enhance TCP/IP performance over satellite links
�
� |
Japan
� |
� |
2001-10-01 |
|
[ 60 ]
�
(Rev.1)� |
Report on the activities of ITU-T Study Group 13
�
� |
EUTELSAT
� |
� |
2001-10-01 |
|
[ 59 ]
�
(Rev.1)� |
Responses to Circular letter CA/99
�
� |
BR Secretariat
� |
� |
2001-10-01 |
|
[ 58 ]
�
(Rev.1)� |
Background briefing on secure timestamps
�
� |
EUTELSAT
� |
� |
2001-10-01 |
|
[ 57 ]
�
(Rev.1)� |
Progress on the revision of Recommendation ITU-R S.579 on availability
�
� |
EUTELSAT
� |
� |
2001-10-01 |
|
[ 56 ]
�
(Rev.1)� |
Comments in responses to Circular Letter CAR/109
�
� |
BR Secretariat
� |
� |
2001-10-01 |
|
[ 55 ]
�
(Rev.1)� |
Updating of certain maintained S-series and SNG-series Recommendations
�
� |
BR Secretariat
� |
� |
2001-10-01 |
|
[ 54 ]
�
(Rev.1)� |
Liaison statement - Reply to concerns relating to the E-model
�
� |
ITU-T SG 12 (Rapporteur Q.8/12)
� |
� |
2001-10-01 |
|
[ 53 ]
�
(Rev.1)� |
Response to ITU-R WP 9A on their liaison supporting development of new ITU-T Recommendation G.821.1
�
� |
ITU-T SG 13
� |
� |
2001-10-01 |
|
[ 52 ]
�
(Rev.1)� |
IP packet transfer delay in ITU-T Recommendation Y.1541
�
� |
ITU-T SG 13
� |
� |
2001-10-01 |
|
[ 51 ]
�
(Rev.1)� |
Draft revised Recomendation I.358 - Call processing performance for switched virtual channel connections (VCCs) in a B-ISDN
�
� |
ITU-T SG 13
� |
� |
2001-10-01 |
|
[ 50 ]
�
(Rev.1)� |
Response to ITU-R WP 9A on their liaison on the relation between physical layer, IP and ATM parameters
�
� |
ITU-T SG 13
� |
� |
2001-10-01 |
|
[ 49 ]
�
(Rev.1)� |
Chairman's Report of the meeting of Working Party 4SNG
�
� |
Ch. WP 4SNG
� |
� |
2001-10-01 |
|
[ 48 ]
�
(Rev.1)� |
Liaison statement to ITU-R Working Parties 4A and 4B - Duration of fades and mean time between fades on satellite paths
�
� |
Wp 3J & 3M
� |
� |
2001-10-01 |
|
[ 47 ]
�
(Rev.1)� |
Liaison statement to Workin Party 4B - Activities within Q.13/SG 13
�
� |
ITU-T SG 13
� |
� |
2001-10-01 |
|
[ 46 ]
�
(Rev.1)� |
Liaison statement to ITU-R Working Party 4B - Interoperability of satellite and terrestrial networks
�
� |
WP 8D
� |
� |
2001-10-01 |
|
[ 45 ]
�
(Rev.1)� |
Report of the thirteenth meeting of Working Party 4B (Seattle, Washington, USA, 18-24 April 2001)
�
� |
Ch. WP 4B
� |
� |
2001-10-01 |
|
[ 44 ]
�
(Rev.1)� |
Liaison statement to ITU-T Study Group 13 - Discussion on relation between physical layer, IP, ATM parameters
�
� |
WP 9A
� |
� |
2001-10-01 |
|
[ 43 ]
�
(Rev.1)� |
List of documents issued
�
� |
BRSGD
� |
� |
2001-10-01 |
|
[ 42 ]
�
(Rev.1)� |
Working document towards a draft new Recommendation onTCP performance over ATM based satellite network
�
� |
Korea
� |
� |
2001-10-01 |
|
[ 41 ]
�
(Rev.1)� |
Working document towards a draft new Recommendation on TT&C performance characteristics
�
� |
USA
� |
� |
2001-10-01 |
|
[ 40 ]
�
(Rev.1)� |
An analysis of the impact of implementing dynamic channel assignment (DCA) in FSS systems in response to a liaison statement from Working Party 4-9S
�
� |
USA
� |
� |
2001-10-01 |
|
[ 39 ]
�
(Rev.1)� |
Report on ITU-T SG 15 activities
�
� |
EUTELSAT
� |
� |
2001-10-01 |
|
[ 38 ]
�
(Rev.1)� |
Working document towards a preliminary draft new recommendation - Impact of FSS performance objectives and delay on the transmission of TCP/IP over satellites
�
� |
INTELSAT
� |
� |
2001-10-01 |
|
[ 37 ]
�
(Rev.1)� |
Working document towards a preliminary draft new Recommendation - Spectrum requirements below 17 GHz for telemetry, tracking and command of FSS satellites operating with service links above 17GHz
�
� |
INTELSAT
� |
� |
2001-10-01 |
|
[ 36 ]
�
(Rev.1)� |
Report of last ITU-T SG 13 meeting in November 2000
�
� |
EUTELSAT
� |
� |
2001-10-01 |
Results:135 total items. Result page:�
Previous�-�
1 -
2 -
3
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):