International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP4B : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP4B� C�

ITU-R�WP4B

Systems, performance, availability and maintenance

Results:135 total items.
Result page:� Previous�-� 1 - 2 - 3 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 85 ]
(Rev.1)
Performance and availability objectives for an FSS network operating in the 20/30 GHz band � USA 2001-10-01
[ 84 ]
(Rev.1)
Fade duration statistics � Ch. WP 4B 2001-10-01
[ 83 ]
(Rev.1)
Draft modification of Recommendation ITU-R S.1522 - Impact of loss of synchronization and timing recovery on availability in hypothetical reference digital paths � India 2001-10-01
[ 82 ]
(Rev.1)
Activities within Q.13/SG 13 - Hypothetical reference model of satellite IP network interconnected to terrestrial IP network � Japan 2001-10-01
[ 81 ]
(Rev.1)
Report of the ITU-T SG 13 meeting in Geneva, 22 January to 1 February 2002 � EUTELSAT 2001-10-01
[ 80 ]
(Rev.1)
Time and date signals � EUTELSAT 2001-10-01
[ 79 ]
(Rev.1)
Liaison statement - Draft new Question Q.[ets/16] on Emergency Telecommunications Service (ETS) � ITU-T SG 16 2001-10-01
[ 78 ]
(Rev.1)
Timestamps in satellite transport systems � EUTELSAT 2001-10-01
[ 77 ]
(Rev.1)
Liaison statement from ITU-T SG 13 on draft Recommendation Y.1541 � ITU-T SG 13 2001-10-01
[ 76 ]
(Rev.1)
Liaison statement - Liaison statement on Interim Q. 13/13 Rapporteur Meeting - "Interoperability of Satellite and Terrestrial Networks � ITU-T SG 13 2001-10-01
[ 75 ]
(Rev.1)
Preparation for the development of a new Recommendation to complement G.optperf � EUTELSAT 2001-10-01
[ 74 ]
(Rev.1)
Liaison statement from WP 8D - Basic reference models and performance parameters of IP packet network transmission in the mobile-satellite service � WP 8D 2001-10-01
[ 73 ]
(Rev.1)
Liaison statement to WPs 3J, 4A, 4B, 6E, 6S, 7B, 7D, 8A, 8B and 9D - Compatibility between Ultra Wideband (UWB) emissions and Radiocommunication Services � WP 1A & 1B 2001-10-01
[ 72 ]
(Rev.1)
Liaison statement to SG 8, WP 4B, JRG 8A-9B and WP 9B � ITU-T SG 15 WP 5/15 2001-10-01
[ 71 ]
(Rev.1)
Liaison statement to ITU-R WP 4B - Reply to LS on G.IPCME � ITU-T SG 15 2001-10-01
[ 70 ]
(Rev.1)
Part 1 - Report of the fourteenth meeting of Working Party 4B (Geneva, 1-8 October 2001) � Ch. WP 4B 2001-10-01
[ 69 ]
(Rev.1)
Liaison statement to ITU-R WP 9A, 4B, JRG 8A-9B, ITU-T SG 17 and SG 12 - Revisions for draft new Recommendation Y.1541 - Network performance objectives for IP-based services � ITU-T SG 13 2001-10-01
[ 68 ]
(Rev.1)
List of documents issued � BRSGD 2001-10-01
[ 67 ]
(Rev.1)
Working document towards a draft new Recommendation - Influence of BER over QoS for TCP and UDP traffic over satellite networks with differentiated services � USA 2001-10-01
[ 66 ]
(Rev.1)
Quality of Service - Support in the Internet - Elaboration of the concept and the influence of the operation of TCP on the end-to-end performance � EUTELSAT 2001-10-01
[ 65 ]
(Rev.1)
Report of the 1st meeting of the ICG on satellite matters (Ankara, Turkey, 26-28 June 2001) � Ch. ICG-SAT 2001-10-01
[ 64 ]
(Rev.1)
A performance comparison of Ku band versus frequencies above 17 GHz in the fixed satellite service for the use of telemetry, tracking and command (TT&C) above 17 GHz � Canada 2001-10-01
[ 63 ]
(Rev.1)
Report on ITU-T SG 15 activities � EUTELSAT 2001-10-01
[ 62 ]
(Rev.1)
Discussion on Satellite IP network system and relation between physical layer and IP parameters (Question ITU-R 263/4) � Japan 2001-10-01
[ 61 ]
(Rev.1)
Working Document towards a draft new Recommendation on TCP/IP performance over satellite links - A possible method to enhance TCP/IP performance over satellite links � Japan 2001-10-01
[ 60 ]
(Rev.1)
Report on the activities of ITU-T Study Group 13 � EUTELSAT 2001-10-01
[ 59 ]
(Rev.1)
Responses to Circular letter CA/99 � BR Secretariat 2001-10-01
[ 58 ]
(Rev.1)
Background briefing on secure timestamps � EUTELSAT 2001-10-01
[ 57 ]
(Rev.1)
Progress on the revision of Recommendation ITU-R S.579 on availability � EUTELSAT 2001-10-01
[ 56 ]
(Rev.1)
Comments in responses to Circular Letter CAR/109 � BR Secretariat 2001-10-01
[ 55 ]
(Rev.1)
Updating of certain maintained S-series and SNG-series Recommendations � BR Secretariat 2001-10-01
[ 54 ]
(Rev.1)
Liaison statement - Reply to concerns relating to the E-model � ITU-T SG 12 (Rapporteur Q.8/12) 2001-10-01
[ 53 ]
(Rev.1)
Response to ITU-R WP 9A on their liaison supporting development of new ITU-T Recommendation G.821.1 � ITU-T SG 13 2001-10-01
[ 52 ]
(Rev.1)
IP packet transfer delay in ITU-T Recommendation Y.1541 � ITU-T SG 13 2001-10-01
[ 51 ]
(Rev.1)
Draft revised Recomendation I.358 - Call processing performance for switched virtual channel connections (VCCs) in a B-ISDN � ITU-T SG 13 2001-10-01
[ 50 ]
(Rev.1)
Response to ITU-R WP 9A on their liaison on the relation between physical layer, IP and ATM parameters � ITU-T SG 13 2001-10-01
[ 49 ]
(Rev.1)
Chairman's Report of the meeting of Working Party 4SNG � Ch. WP 4SNG 2001-10-01
[ 48 ]
(Rev.1)
Liaison statement to ITU-R Working Parties 4A and 4B - Duration of fades and mean time between fades on satellite paths � Wp 3J & 3M 2001-10-01
[ 47 ]
(Rev.1)
Liaison statement to Workin Party 4B - Activities within Q.13/SG 13 � ITU-T SG 13 2001-10-01
[ 46 ]
(Rev.1)
Liaison statement to ITU-R Working Party 4B - Interoperability of satellite and terrestrial networks � WP 8D 2001-10-01
[ 45 ]
(Rev.1)
Report of the thirteenth meeting of Working Party 4B (Seattle, Washington, USA, 18-24 April 2001) � Ch. WP 4B 2001-10-01
[ 44 ]
(Rev.1)
Liaison statement to ITU-T Study Group 13 - Discussion on relation between physical layer, IP, ATM parameters � WP 9A 2001-10-01
[ 43 ]
(Rev.1)
List of documents issued � BRSGD 2001-10-01
[ 42 ]
(Rev.1)
Working document towards a draft new Recommendation onTCP performance over ATM based satellite network � Korea 2001-10-01
[ 41 ]
(Rev.1)
Working document towards a draft new Recommendation on TT&C performance characteristics � USA 2001-10-01
[ 40 ]
(Rev.1)
An analysis of the impact of implementing dynamic channel assignment (DCA) in FSS systems in response to a liaison statement from Working Party 4-9S � USA 2001-10-01
[ 39 ]
(Rev.1)
Report on ITU-T SG 15 activities � EUTELSAT 2001-10-01
[ 38 ]
(Rev.1)
Working document towards a preliminary draft new recommendation - Impact of FSS performance objectives and delay on the transmission of TCP/IP over satellites � INTELSAT 2001-10-01
[ 37 ]
(Rev.1)
Working document towards a preliminary draft new Recommendation - Spectrum requirements below 17 GHz for telemetry, tracking and command of FSS satellites operating with service links above 17GHz � INTELSAT 2001-10-01
[ 36 ]
(Rev.1)
Report of last ITU-T SG 13 meeting in November 2000 � EUTELSAT 2001-10-01
Results:135 total items.
Result page:� Previous�-� 1 - 2 - 3 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2020-12-18