Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 49 ]
�
(Rev.1)� |
LS to WP 3M - The percentage of time during which fixed-satellite service nominal clear-sky power flux-density levels may be exceeded to overcome fading conditions, while protecting the fixed service, and permitting operation of FSS earth stations
�
� |
WP 4-9S
� |
� |
2001-05-31 |
|
[ 48 ]
�
(Rev.1)� |
Liaison statement to Working Party 3M concerning propagation aspects of the determination of coordination distance
�
� |
WP 1A
� |
� |
2001-05-31 |
|
[ 47 ]
�
(Rev.1)� |
Liaison statement to Working Party 3J concerning The organization in Study Group 3 Recommendations of information on the effect of building materials and structures on radio propagation
�
� |
WP 3K
� |
� |
2001-05-31 |
|
[ 46 ]
�
(Rev.1)� |
Liaison statement from WP 9D - Resolution 79 (WRC-2000) on the coordination distance between radio astronomy and earth stations in bands above 30 GHz and P-MP high density applications in the fixed servce
�
� |
WP 9D
� |
� |
2001-05-31 |
|
[ 45 ]
�
(Rev.1)� |
Liaison statement to Working Parties 3M, 8A and 4-9S - Proposal for deletion of Recommendations ITU-R F.1092-1 and ITU-R F.1189-1
�
� |
WP 9A
� |
� |
2001-05-31 |
|
[ 44 ]
�
(Rev.1)� |
Liaison statement to Working Party 3M concerning rain attenuation calculations in Recommendation ITU-R P.530
�
� |
WP 9A
� |
� |
2001-05-31 |
|
[ 43 ]
�
(Rev.1)� |
Liaison statement to WP 3M concerning Rec. ITU-R P.530 and path planning and system design in a multi-path fading environment
�
� |
WP 9A
� |
� |
2001-05-31 |
|
[ 42 ]
�
(Rev.1)� |
Liaison statement to Working Parties 3K and 3M - Methods for point-to-area predictions to terrestrial services in the frequency range 30-3 000 MHz - DNR [BLM]
�
� |
WP 8A
� |
� |
2001-05-31 |
|
[ 41 ]
�
(Rev.1)� |
Liaison Statement to Working Parties 8B and 8F on frequency sharing in the band 2 700-2 900 MHz
�
� |
Ch WP 3M
� |
� |
2001-05-31 |
|
[ 40 ]
�
(Rev.1)� |
Liaison statement to ITU-R WP 8B and WP 3M - Analysis of co-frequency sharing of the band 2 700-2 900 MHz between the mobile service (IMT-2000) and meteorological and aeronautical radionavigation radars
�
� |
WP 8F
� |
� |
2001-05-31 |
|
[ 39 ]
�
(Rev.1)� |
Liaison statement to Working Parties 3K and 3M concerning the organisation in Study Group 3 Recommendations of information on the effect of building materials and structures on radio propagation
�
� |
WP 3J
� |
� |
2001-05-31 |
|
[ 38 ]
�
(Rev.1)� |
Chairman's Report to the next meeting of Working Party 3M
�
� |
Ch WP 3M
� |
� |
2001-05-31 |
|
[ 37 ]
�
(Rev.1)� |
List of documents
�
� |
BRSGD
� |
� |
2001-05-31 |
|
[ 36 ]
�
(Rev.1)� |
Proposed contribution for the Handbook on propagation on terrestrial links
�
� |
Canada
� |
� |
2001-05-31 |
|
[ 35 ]
�
(Rev.1)� |
Prosed modification of Recommendation ITU-R P. 530-9 - Propagation data and prediction methods required for the design of terrestrial line-of-sight systems
�
� |
Canada
� |
� |
2001-05-31 |
|
[ 34 ]
�
(Rev.1)� |
Further developments on mode (2) rain scatter interference calculations for Recommendation ITU-R P.620-4, and comparisons with Recommendation ITU-R P.452-9 and experimental measurements
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2001-05-31 |
|
[ 33 ]
�
(Rev.1)� |
Proposed revision to Recommendation ITU-R P.681
�
� |
Spain
� |
� |
2001-05-31 |
|
[ 32 ]
�
(Rev.1)� |
Single frequency fading and simultaneous fading in multihop links
�
� |
Brazil (Federative Rep. of)
� |
� |
2001-05-31 |
|
[ 31 ]
�
(Rev.1)� |
Rain attenuation at 15 and 18 GHz in converging links
�
� |
Brazil (Federative Rep. of)
� |
� |
2001-05-31 |
|
[ 30 ]
�
(Rev.1)� |
Working Document toward a preliminary draft new Recommendation on propagation data and prediction methods required for the design of space-to-Earth and Earth-to-space Oticalcommunication systems
�
� |
United States of America
� |
� |
2001-05-31 |
|
[ 29 ]
�
(Rev.1)� |
Discussion document - Provision of validation data for Study Group 3 prediction methods
�
� |
Australia
� |
� |
2001-05-31 |
|
[ 28 ]
�
(Rev.1)� |
Liaison statement to WPs 3J and 3M - Terrestrial scatter models in the 36-37 GHz band applicable to passive sensors
�
� |
WP 7C
� |
� |
2001-05-31 |
|
[ 27 ]
�
(Rev.1)� |
Proposed amendment to Recommendation ITU-R P.530-9 - Rain attenuation effective path length
�
� |
Australia
� |
� |
2001-05-31 |
|
[ 26 ]
�
(Rev.1)� |
Propagation models for evaluating the interference level between MSS feeder links and RLAN in a 5-GHz band
�
� |
Japan
� |
� |
2001-05-31 |
|
[ 25 ]
�
(Rev.1)� |
Testing of rain attenuation and total impairment prediction models at high frequency bands for Earth-space paths
�
� |
France, Italy, ESA
� |
� |
2001-05-31 |
|
[ 24 ]
�
(Rev.1)� |
Liaison statement to ITU-R Working Parties 3J and 3M - Duration of fades and mean time between fades on satellite paths
�
� |
WP 4B
� |
� |
2001-05-31 |
|
[ 23 ]
�
(Rev.1)� |
Liaison statement to WP 3M on Satellite downlink fading
�
� |
Ch WP 4A
� |
� |
2001-05-31 |
|
[ 22 ]
�
(Rev.1)� |
Liaison Statement to WP 3M - On frequency sharing between GSO FSS networks and non-GSO FSS systems in the frequency bands 47.2-50.2 GHz and 37.5-42.5 GHz
�
� |
WP 4A
� |
� |
2001-05-31 |
|
[ 21 ]
�
(Rev.1)� |
Longest Trial Radio HOP in Iran
�
� |
Iran (Islamic Rep. of)
� |
� |
2001-05-31 |
|
[ 20 ]
�
(Rev.1)� |
Proposed revision to Recommendation ITU-R P.838
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2001-05-31 |
|
[ 19 ]
�
(Rev.1)� |
Proposals for the draft revision of Recommendation ITU-R P.530-8
�
� |
Russian Federation
� |
� |
2001-05-31 |
|
[ 18 ]
�
(Rev.1)� |
LS to WP3M - The percentage pf time during which fixed-satellite service nominal clear-sky power flux-density levels may be exceeded to overcome fading conditions, while protecting the fixed service, and permitting operation of FSS earth stations
�
� |
WP 4-9S
� |
� |
2001-05-31 |
|
[ 17 ]
�
(Rev.1)� |
Liaison Statement to WP 3M concerning - path planning and system design for fixed service systems in a multipath fading environment
�
� |
WP 9A
� |
� |
2001-05-31 |
|
[ 16 ]
�
(Rev.1)� |
Proposed revision to Recommendation ITU-R P.681-4 - Propagation data required for the disign of earth-space land mobile telecommunication systems
�
� |
TELENOR AS
� |
� |
2001-05-31 |
|
[ 15 ]
�
(Rev.1)� |
Liaison statement to Working Party 4-9S and Working Party 4A concerning satellite downlink fading
�
� |
Ch WP 3M
� |
� |
2001-05-31 |
|
[ 14 ]
�
(Rev.1)� |
Liaison statement from Working Party 1A to Working Party 3M - Propagation aspects of the determination of coordination distance
�
� |
WP 1A
� |
� |
2001-05-31 |
|
[ 13 ]
�
(Rev.1)� |
Liaison statement to WP 3M concerning Satellite downlink fading
�
� |
WP 4-9S
� |
� |
2001-05-31 |
|
[ 12 ]
�
(Rev.1)� |
Liaison statement to WP 3M - Sharing between high-density links in the fixed service and other services in the frequency range from 30 GHz to about 50 GHz
�
� |
WP 9D
� |
� |
2001-05-31 |
|
[ 11 ]
�
(Rev.1)� |
Liaison statement to WP 3M - Multipath fading prediction for link hop lengths less than 7 km
�
� |
WP 9A
� |
� |
2001-05-31 |
|
[ 10 ]
�
(Rev.1)� |
Liaison statement to Working Party 3M - Information on number of fade events and bringing-into-service time
�
� |
WP 9A
� |
� |
2001-05-31 |
|
[ 9 ]
�
(Rev.1)� |
Liaison statement to WP 3M concerning the design of digital radio-relay systems
�
� |
WP 9A
� |
� |
2001-05-31 |
|
[ 8 ]
�
(Rev.1)� |
Liaison statement to WP 3M and JRG 8A-9B concerning Average building attenuation relating to the protection of non-GSO MSS feeder links operating in the band 5 150-5 250 MHz from RLAN interference
�
� |
WP 4A
� |
� |
2001-05-31 |
|
[ 7 ]
�
(Rev.1)� |
Chairman's Report to next meeting of WP 3M
�
� |
Ch WP 3M
� |
� |
2001-05-31 |
|
[ 6 ]
�
(Rev.1)� |
Liaison statement to Working Parties 3K and 3M concerning Propagation models for interference assessment for the terrestrial land mobile service in the bands 30 to 3 000 MHz
�
� |
WP 8A
� |
� |
2001-05-31 |
|
[ 5 ]
�
(Rev.1)� |
Liaison statement to Working Parties 3M and 4A concerning building attenuation at around 5 GHz
�
� |
JRG 8A-9B
� |
� |
2001-05-31 |
|
[ 4 ]
�
(Rev.1)� |
Liaison statement from Working Party 9A to ITU-R Working Party 3M
�
� |
WP 9A
� |
� |
2001-05-31 |
|
[ 3 ]
�
(Rev.1)� |
Liaison statement to Working Party 8F concerning propagation considerations in assessing the potential for interference between IMT-2000 and other services
�
� |
Ch WPs 3K & 3M
� |
� |
2001-05-31 |
|
[ 2 ]
�
(Rev.1)� |
Liaison statement to WPs 8A, 8B and 8D and the relevant groups of SGs 1, 3, 4, 7 and 9
�
� |
WP 8F
� |
� |
2001-05-31 |
|
[ 1 ]
�
(Rev.1)� |
Liaison statement to Working Parties 3M and 9D - Sharing between high-density links in the fixed service an other services in the frequency range from 30 to about 50 GHz
�
� |
WP 7E
� |
� |
2001-05-31 |
Results:99 total items. Result page:�
Previous�-�
1 -
2
� |
Multiple Document Download:�Formats and Languages to be included (when available):