International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : SG07 : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�SG07� C�

ITU-R�SG07

Science services

Results:97 total items.
Result page:� Previous�-� 1 - 2
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 47 ]
Draft revision of Recommendation ITU-R SA.1028-1 - Performance criteria for satellite passive remote sensing � WP 7C 2001-10-15
[ 46 ]
Draft new Recommendation ITU-R SA.[Doc. 7/46] - Sharing in the band 5 250-5 350 MHz between the Earth exploration-satellite service (active) and wireless access systems (including RLANs) in the mobile service � WP 7C 2001-10-15
[ 45 ]
Draft new Question ITU-R [DOC.7/45] - Examination under No.S11.32 of frequency assignments relating to space research and Earth exploration-satellite applications in a space-to-space network composed of a space station on a geostationary satellite � WP 7B 2001-10-15
[ 44 ]
Summary record of the meeting of Study Group 7 (15-16 October 2001) � Chairman, SG 7 2001-10-15
[ 43 ]
List of participants � BRDMU 2001-10-15
[ 42 ]
List of documents issued � BRSGD 2001-10-15
[ 41 ]
Examination under No. S11/32 of frequency assignments relating to an inter-satellite (space-to-space) network comprising a space station on a geostationary satellite and a space station on a non-geostationary satellite � Director, BR 2001-10-15
[ 40 ]
Liaison statement to Study Groupes, 1, 3, 7. 8, 9 and Special Committee - First session of the Regional Radiocommunication Conference for the revision of the European Broadcasting Agreement, Stockholm, 1991.. � SG 6 2001-10-15
[ 39 ]
Proposed modification to draft revision to Recommendation ITU-R RA.1272 - Protection of radio astronomy measurements above 60 GHz from ground bases in interference � Canada 2001-10-15
[ 38 ]
Summary of the meetings of Joint Task Group 4-7-8 (October 2000 and May - June 2001) � Vice-Chairman, JTG 4-7-8 2001-10-15
[ 37 ]
Chairman's Report to the Study Group 7 � Chairman, SG 7 2001-10-15
[ 36 ]
Executive Report on the meeting of Working Party 7B (May 2001) � Chairman, WP 7B 2001-10-15
[ 35 ]
Executive Report to Study Group 7 on WP 7C meeting ( 9-17 May 2001) � Chairman, WP 7C 2001-10-15
[ 34 ]
Executive Report on the May 2001 meeting of WP 7D � Chairman, WP 7D 2001-10-15
[ 33 ]
Draft revision of Recommendation ITU-R RA.1271 - Protection of radio astronomy measurements above 60 GHz from ground based interference � WP 7D 2001-10-15
[ 32 ]
Draft revision of Recommendation ITU-R RA.314-8 - Preferred frequency bands for radio astronomical measurements � WP 7D 2001-10-15
[ 31 ]
Progress Report of activities on ITU-R Study Group structure � Correspondence Group on ITU-R SG Structure 2001-10-15
[ 30 ]
Draft revision of Question ITU-R 232/7 - Frequency sharing between spaceborne passive sensors and other services in the bands 10.60-10.68 GHz, 31.5-31.8 GHz and 36-37 GHz � WP 7C 2001-10-15
[ 29 ]
Executive Report on the meeting of Working Party 7A (Geneva, 7-11 May 2001) � Chairman, WP 7A 2001-10-15
[ 28 ]
Draft revision of Recommendation ITU-R TF.686-1 - Glossary and definition of time and frequency terms � WP 7C 2001-10-15
[ 27 ]
Draft new Recommendation - Time scales for use by standard-frequency and time-signal services � WP 7A 2001-10-15
[ 26 ]
Draft modification of Recommendation ITU-R TF.768-4 - Standard frequencies and time signals � WP 7A 2001-10-15
[ 25 ]
Draft revised Recommendation ITU-R TF.460-5 - Standard-frequency and time-signal emissions � WP 7A 2001-10-15
[ 24 ]
Summary on Radiocommunication Study Group 7 (Science Services) Meeting � Chairman, SG 7 2001-10-15
[ 23 ]
Note by the Secretariat - Opinion ITU-R 95 � BR Secretariat 2001-10-15
[ 22 ]
Note to Study Group 9 - Draft new Recommendation ITU-R F.[PMP26 GHz] � SG 7 2001-10-15
[ 21 ]
List of participants � BRDMU 2001-10-15
[ 20 ]
Note to Study Group 7 - Draft new Recommendation ITU-R F. [PMP26GHz] - Technical and operational requirements that facilitate sharing between point-to-multipoint systems in the fixed service and the inter-satellite service in the band 25.25-27.5 GHz � SG 9 2001-10-15
[ 19 ]
Scope of Study Group 7 Working Parties � Chairman, SG 7 2001-10-15
[ 18 ]
Executive report on the Meeting of Working Party 7A (Geneva, 9-13 October 2000) � Chairman, WP 7A 2001-10-15
[ 17 ]
Draft new Question [Doc. 7/17] - Instrumentation time codes � WP 7A 2001-10-15
[ 16 ]
Draft new Question [Doc. 7/16] - Trusted time source for time stamp authority � WP 7A 2001-10-15
[ 15 ]
(Rev.1)
Draft revision of Recommendation ITU-R TF.768-3 - Standard frequencies and time signals � WP 7A 2001-10-15
[ 14 ]
Draft revision to Recommendation ITU-R TF.583-4 - Time codes � WP 7A 2001-10-15
[ 13 ]
Draft new Recommendation ITU-R F[PMP26GHz] - Technical and operational requirements that facilitate sharing between point-to-multipoint systems in the fixed service and the inter-satellite service in the bnad 25.25-27.5 GHz � JRG 7D/9D 2001-10-15
[ 12 ]
Executive report on the meeting of Working Party 7E - Vancouver, July 2000 � Chairman, WP 7E 2001-10-15
[ 11 ]
Executive Report on the Working Party 7C meeting (31 July - 4 August 2000) � Chairman, WP 7C 2001-10-15
[ 10 ]
Executive Report on the meeting of Working Party 7B (January 2000 and August 2000) � WP 7B 2001-10-15
[ 9 ]
Executive Report on the July/August 2000 meeting of Working Party 7D � Chairman, WP 7D 2001-10-15
[ 8 ]
Liaison statement to WPs 8A, 8B and 8D and the relevant groups of SGs 1, 3, 4, 7 and 9 � WP 8F 2001-10-15
[ 7 ]
Report to the Study Group in preparation for the study period 2000-2003 � Chairman, SG 7 2001-10-15
[ 6 ]
Draft new Question ITU-R [Doc. 7/6] - Unwanted emissions radiated from and received by stations of the space science, the mobile and mobile-satellite services in the bands 2 025-2 110 MHz and 2 200-2 290 MHz and the bands 1 885-2 025 MHz and .. � WP 7B 2001-10-15
[ 5 ]
Draft new Question ITU-R [Doc.7/5] - Technical and operational factors relating to interference mitigation practices at radio astronomy stations � WP 7D 2001-10-15
[ 4 ]
Draft new Question ITU-R[TF.QQQ] [Doc. 7/4] - The future of the UTC time scale � WP 7A 2001-10-15
[ 3 ]
Draft revision of Question ITU-R 207-1/7 - Time and frequency transfer using digital communication links � WP 7A 2001-10-15
[ 2 ]
Draft revision to Question ITU-R 201-1/7 - Two-way time and frequency transfer through communication satellites � WP 7A 2001-10-15
[ 1 ]
+Add.1-3
Questions assigned to Study Group 7 by the Radiocommunication Assembly � SG 7 2001-10-15
Results:97 total items.
Result page:� Previous�-� 1 - 2
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2003-06-16