Contributions�� |
�
|
Number�
|
Title
|
Source
|
Date
|
|
[ 60 ]
�
� |
Non-GSO BSS systems operating in the UHF band 620-790 MHz (Section 3.7.4 of draft CPM text for WRC-03 Agenda item 1.37)
�
� |
Iran (Islamic Republic of)
� |
2002-07-01 |
|
[ 59 ]
�
� |
Regulatory issues related to Agenda item 1.27
�
� |
Iran (Islamic Republic of)
� |
2002-07-01 |
|
[ 58 ]
�
� |
Comments on the preliminary Report of the Radiocommunication Bureau to WRC-03 in response to Agenda Item 7.1 with regard to the experiences in the application of the Radio Regulatory procedures and other related matters
�
� |
Canada
� |
2002-07-01 |
|
[ 57 ]
�
� |
Analysis of the regulatory aspects of the identified methods to satisfy WRC-03 Agenda item 1.11
�
� |
Russian Federation
� |
2002-07-01 |
|
[ 56 ]
�
� |
An example regulatory solution in relation to WRC-03 Agenda Item 1.25 (section 4.3 of the CPM Report)
�
� |
Canada
� |
2002-07-02 |
|
[ 55 ]
�
� |
Possible suppression of the application of No. 22.2 in the bands allocated to the broadcasting-satellite service below 1 GHz and to the broadcasting-satellite (sound) service between 1 and 3 GHz
�
� |
France
� |
2002-07-02 |
|
[ 54 ]
�
� |
Comments to the preliminary Report of the Radiocommunication Bureau to WRC-03 in response to Agenda item 7.1
�
� |
Japan
� |
2002-07-02 |
|
[ 53 ]
�
� |
A proposal on modifications to No. 22.5C wich is related to Agenda item 1.37
�
� |
Japan
� |
2002-07-02 |
|
[ 52 ]
�
� |
Review of Sections 4.1.18 to 4.1.20 of Appendices 30 and 30A
�
� |
France
� |
2002-07-02 |
|
[ 51 ]
�
� |
WRC-03 Agenda item 1.30
�
� |
Bulgaria (Republic of)
� |
2002-07-02 |
|
[ 50 ]
�
� |
Comments on Document SC02/10 - Dealing with the review of the provisions of Resolutions 77 (WRC-2000), 84 (WRC-2000) and 539 (WRC-2000)
�
� |
Japan
� |
2002-07-02 |
|
[ 49 ]
�
� |
Regulatory treatment for WRC-03 Agenda Item 1.11
�
� |
United States of America
� |
2002-07-02 |
|
[ 48 ]
�
� |
Regulatory Committee related to Agenda item 1.11
�
� |
Canada
� |
2002-07-02 |
|
[ 47 ]
�
� |
Review of the provisions of Resolution 77 (WRC-2000)
�
� |
Canada
� |
2002-07-02 |
|
[ 46 ]
�
� |
Example Resolution related to Section 1.2.2.4 of CPM text for Agenda item 1.15 - Resolution 606
�
� |
Canada
� |
2002-07-02 |
|
[ 45 ]
�
� |
Update of Annex 3 to Appendix 30 for the protection of BSS earth stations from terrestrial stations of from FSS earth stations operating in the opposite direction of transmission
�
� |
Canada
� |
2002-07-02 |
|
[ 44 ]
�
� |
Use of the 17.3-18.1 GHz band to transmit fixed satellite service signals in the Earth-to-space link
�
� |
Russian Federation
� |
2002-07-02 |
|
[ 43 ]
�
� |
Proposal for the modification of the CPM text regarding regulatory aspects of Agenda item 1.34
�
� |
Japan
� |
2002-07-02 |
|
[ 42 ]
�
� |
Simplification of the processing of satellite filings (WRC-03 Agenda Item 1.30)
�
� |
China (People's Republic of)
� |
2002-07-02 |
|
[ 41 ]
�
� |
Simplification of the processing of satellite filings (WRC-03 Agenda Items 1.11 and 1.26)
�
� |
China (People's Republic of)
� |
2002-07-02 |
|
[ 40 ]
�
� |
Simplification of the processing of satellite filings (WRC-03 Agenda Items 1.24 and 7.2)
�
� |
China (People's Republic of)
� |
2002-07-02 |
|
[ 39 ]
�
� |
Proposal for WRC-03 agenda item 1.13
�
� |
Japan
� |
2002-07-02 |
|
[ 38 ]
�
� |
Comments on Document SC02/13 - Dealing with the review of procedure of No. 9.21
�
� |
Japan
� |
2002-07-02 |
|
[ 37 ]
�
� |
Consideration on the impact of the typical FSS earth station under WRC-2003 Agenda item 1.30
�
� |
Japan
� |
2002-07-02 |
|
[ 36 ]
�
� |
Issues related to Resolution 46 and Resolution 132 discussed in the preliminary Report of the Radiocommunication Bureau to WRC-03 in response to Agenda item 7.1
�
� |
United States of America
� |
2002-07-02 |
|
[ 35 ]
�
� |
Example regulatory text addressing WRC-03 Agenda item 1.25 (HD-FSS)
�
� |
United States of America
� |
2002-07-02 |
|
[ 34 ]
�
� |
Resolution 77 (WRC-2000)
�
� |
United States of America
� |
2002-07-02 |
|
[ 33 ]
�
� |
Experience with No. 9.21 (formerly Article 14)
�
� |
United States of America
� |
2002-07-02 |
|
[ 32 ]
�
� |
Additional example regulatory text for Agenda item 1.26
�
� |
United States of America
� |
2002-07-02 |
|
[ 31 ]
�
� |
Regulatory considerations on WRC-03 Agenda Item 1.14 - Modification to Resolution 207 (Rev. WRC-2000)
�
� |
Australia
,
Indonesia (Republic of)
,
New Zealand
� |
2002-07-02 |
|
[ 30 ]
�
� |
Use of BSS feeder link assignments for GSO FSS (Earth-to-space) at 17 GHz
�
� |
France
� |
2002-07-02 |
|
[ 29 ]
�
� |
SC Chairman's Report to the Special Committee
�
� |
CH, Special Committee
� |
2002-07-02 |
|
[ 28 ]
�
� |
Agenda Item 1.8.2 - Protection of passive services from unwanted emissions
�
� |
France
� |
2002-07-02 |
|
[ 27 ]
�
� |
Proposed modifications of the Radio Regulations to resolve ambiguities in relation with Resolution 33
�
� |
Brunei Darussalam
� |
2002-07-02 |
|
[ 26 ]
�
� |
Complexity of the Radio Regulations
�
� |
Brunei Darussalam
� |
2002-07-02 |
|
[ 25 ]
�
� |
SC-3 Report to the Special Committee - Regulatory/Procedural aspects relating to space science services and sharing issues in the 5 GHz band (WRC-03 Agenda items 1.4, 1.5, 1.6 and 1.12)
�
� |
SC 3 Rapporteur
� |
2002-07-02 |
|
[ 24 ]
�
� |
SC-2 Report to the Special Committee - Regulatory/Procedural aspects relating to the fixed-satellite service, in the framework of WRC-03 Agenda items 1.19, 1.25, 1.26, 1.29, 1.30, 1.32 and 7.1
�
� |
SC 2 Rapporteur
� |
2002-07-02 |
|
[ 23 ]
�
(Rev.1)� |
SC-4 Report to the Special Committee - Regulatory/procedural aspects relating to high altitude platforms stations (WRC-03 Agenda items 1.13 and 1.33)
�
� |
SC 4 Rapporteur
� |
2002-07-02 |
|
[ 22 ]
�
� |
APT contributions to the Special Committee
�
� |
APT
� |
2002-07-02 |
|
[ 21 ]
�
� |
Proposed modifications to section 2.8.2.4 of the draft CPM Report
�
� |
Canada
� |
2002-07-02 |
|
[ 20 ]
�
� |
SC-1 Report to the Special Commitee - Regulatory/Procedural aspects relating to appendices 30, 30A and unplanned BSS in the framework orf WRC-03 agenda items 1.27 and 1.34
�
� |
SC 2 Rapporteur
� |
2002-07-02 |
|
[ 19 ]
�
� |
Extracts from the draft CPM Report to be considered by the Special Committee
�
� |
BR Secretariat
� |
2002-07-02 |
|
[ 18 ]
�
� |
Sharing conditions between GSO networks and non-GSO systems in the 2 630-2 655 MHz band
�
� |
France
� |
2002-07-02 |
|
[ 17 ]
�
� |
Comments on examples 1 and 3 of Section 1.2.1.4 of the draft CPM Report (Regulatory and procedural considerations for Agenda item 1.15, Resolution 605)
�
� |
France
� |
2002-07-02 |
|
[ 16 ]
�
� |
Regulatory considerations on WRC-03 Agenda Item 1.11
�
� |
United States of America
� |
2002-07-02 |
|
[ 15 ]
�
� |
Procedures to be applied in the event of non-compliance with single-entry operational and additional operational limits in Section II of Article 22
�
� |
France
� |
2002-07-02 |
|
[ 14 ]
�
� |
Relationship between secondary and primary services
�
� |
France
� |
2002-07-02 |
|
[ 13 ]
�
� |
Review of the procedure of No. 9.21 (formerly article 14)
�
� |
France
� |
2002-07-02 |
|
[ 12 ]
�
� |
Possible implementation into appendices 30/30A of the proposals developed insection 3.2 or the draft CPM report
�
� |
SC 1 Rapporteur
� |
2002-07-02 |
|
[ 11 ]
�
� |
Liaison statement from Task Group 6/8 - Regulatory issues related to sharing between the broadcasting service and the broadcasting-satellite service in the frequency band 620-790 MHz
�
� |
TG 6/8
� |
2002-07-02 |
Results:110 total items. Result page:�
Previous�-�
1 -
2 -
3
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):