International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : CACE : Circulars� Recently posted�-� Search Meeting Documents
ITU-R�CACE� CIR�

ITU-R�CACE

Radiocommunication Assembly and Study Group work

Results:1060 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 �-�Next Next
Circulars

Number
Title Source AI/Question
Date
[ 1079 ]
Adoption of 2 new and 1 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) - Suppression of 1 ITU-R Recommendation � SG 4 2023-09-21
[ 1078 ]
Approval of 1 revised ITU-R Question and suppression of 1 ITU-R Question � SG 4 2023-09-20
[ 1077 ]
Proposed approval of 7 draft revised ITU-R Questions and suppression of 2 ITU-R Questions � SG 6 2023-09-14
[ 1076 ]
Proposed adoption of 1 draft new and 8 draft revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) - Proposed suppression of 39 ITU-R Recommendations � SG 6 2023-09-15
[ 1075 ]
Proposed approval of 1 draft revised ITU-R Recommendation � SG 4 2023-09-12
[ 1074 ]
Proposed approval of 1 draft revised ITU-R Recommendation � SG 3 2023-08-24
[ 1073 ]
Adoption of 14 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 3 2023-08-24
[ 1072 ]
Approval of 1 new and 3 revised ITU-R Questions � SG 3 2023-08-21
[ 1071 ]
Adoption of 1 revised ITU-R Recommendation and its simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 1 2023-08-16
[ 1070 ]
Proposed approval of 1 draft revised ITU-R Question - Proposed suppression of 1 ITU-R Question � SG 4 2023-07-11
[ 1069 ]
Proposed adoption of 2 draft new and 1 draft revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 4 2023-07-11
[ 1068 ]
Proposed adoption by correspondence of 1 draft revised ITU-R Recommendation � SG 4 2023-07-05
[ 1067 ]
+Add.1
Meeting of Radiocommunication Study Group 5 (Terrestrial Services), Geneva, 25 and 26 September 2023 � Director, BR 2023-06-27
[ 1066 ]
Proposed adoption by correspondence of 1 draft revised ITU-R Recommendation � SG 3 2023-06-12
[ 1065 ]
Proposed adoption of 15 draft revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 3 2023-06-12
[ 1064 ]
Proposed approval of 1 draft new and 3 draft revised ITU-R Questions � SG 3 2023-06-09
[ 1063 ]
Proposed adoption of 1 draft revised ITU-R Recommendation and its simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 1 2023-06-06
[ 1062 ]
Approval of 2 revised ITU-R Questions � SG 6 2023-05-30
[ 1061 ]
Adoption of 11 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 6 2023-05-29
[ 1060 ]
Meeting of Radiocommunication Study Group 6 (Broadcasting Service) - Geneva, 8 September 2023 � Director, BR 2023-05-12
[ 1059 ]
Meeting of Radiocommunication Study Group 7 (Science Services) - Geneva, 12 October 2023 � Director, BR 2023-04-24
[ 1058 ]
Appointment of Chairmen and Vice-Chairmen of ITU-R Study Groups, the Coordination Committee for Vocabulary, the Conference Preparatory Meeting and the Radiocommunication Advisory Group � Director, BR 2023-04-05
[ 1057 ]
Proposed approval of 2 draft revised ITU-R Questions � SG 6 2023-03-20
[ 1056 ]
Proposed adoption of 11 draft revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 6 2023-03-20
[ 1055 ]
Meeting of Radiocommunication Study Group 4 (Satellite Services) - Geneva, 7 July 2023 � Director, BR 2023-02-22
[ 1054 ]
Approval of 1 revised ITU-R Recommendation � SG 5 2023-02-22
[ 1053 ]
Meeting of Radiocommunication Study Group 3 (Radiowave Propagation) - Geneva, 2 June 2023 � Director, BR 2023-02-17
[ 1052 ]
Adoption of 6 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) - Suppression of 1 ITU-R Recommendation � SG 5 2023-02-15
[ 1051 ]
Meeting of Radiocommunication Study Group 1 (Spectrum Management) - Geneva, 5 and 6 June 2023 � Director, BR 2023-01-31
[ 1050 ]
Radiocommunication Assembly 2023 (RA-23) � Director, BR 2023-02-10
[ 1049 ]
Adoption of 2 new ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 7 2022-12-21
[ 1048 ]
Proposed approval of 1 draft revised ITU-R Recommendation � SG 5 2022-12-19
[ 1047 ]
Adoption of 2 new and 6 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 6 2022-12-19
[ 1046 ]
Approval of 1 new ITU-R Question � SG 7 2022-12-20
[ 1045 ]
(Rev.1)
Proposed adoption of 6 draft revised ITU-R Recommendations simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) - Proposed suppression of 1 ITU-R Recommendation � SG 5 2022-12-05
[ 1044 ]
Meeting of Radiocommunication Study Group 6 (Broadcasting Service) - Geneva, 17 March 2023 � Director, BR 2022-11-01
[ 1043 ]
Proposed approval of 1 draft new ITU-R Question � SG 7 2022-10-11
[ 1042 ]
Proposed adoption of 2 draft new ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 7 2022-10-11
[ 1041 ]
Proposed adoption of 2 draft new and 6 draft revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 6 2022-10-03
[ 1040 ]
Adoption of 2 new ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 1 2022-09-21
[ 1039 ]
Approval of 1 new and 1 revised ITU-R Recommendations � SG 1 2022-09-21
[ 1038 ]
Approval of 1 new and 1 revised ITU-R Questions � SG 1 2022-09-21
[ 1037 ]
Approval of 1 revised ITU-R Question � SG 3 2022-08-25
[ 1036 ]
Adoption of 4 new and 10 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 3 2022-08-25
[ 1035 ]
Meeting of Radiocommunication Study Group 5 (Terrestrial Services) - Geneva, 28 November 2022 � Director, BR 2022-08-04
[ 1034 ]
Proposed adoption of 2 draft new ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 1 2022-07-13
[ 1033 ]
Proposed approval of 1 draft new and 1 draft revised ITU-R Question � SG 1 2022-07-13
[ 1032 ]
Proposed approval of 1 draft new and 1 draft revised ITU-R Recommendations � SG 1 2022-07-13
[ 1031 ]
Proposed adoption of 4 draft new and 10 draft revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 3 2022-06-16
[ 1030 ]
Proposed approval of 1 draft revised ITU-R Question � SG 3 2022-06-15
Results:1060 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2024-12-19