Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-T : SG 5 : Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-T�SG 5� C�

UIT-T�SG 5

Environment, climate change and circular economy

P�riode d'�tudes 2017

Resultats:902 documents
R�sultats :� Pr�c�dent�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 �-�Suivant Next
Contributions��Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 452 ]
EMF in the vicinity of the metallic fences. � Orange Polska S.A. (Poland) Q3/5 2019-04-26
[ 451 ]
Overestimation of the exposure level in vicinity of Radio Base Stations. � Orange Polska S.A. (Poland) Q3/5 2019-04-26
[ 450 ]
(Rev.1)
L.1000 rev, Proposal for revision of recommendation L.1000 � Huawei Technologies Co., Ltd. (China) Q7/5 2019-04-26
[ 449 ]
Proposed new work item on draft Recommendation ITU-T K.PLC.EMC "Electromagnetic compatibility requirements and measurement methods for outdoor equipment using power line communication technology" � Huawei Technologies Co., Ltd. (China) Q4/5 2019-04-26
[ 448 ]
(Rev.1)
Region efforts towards sustainable e-waste management in the East African Region � Agence de R�gulation et de Contr�le des T�l�communications (ARCT) (Burundi) , Communications Authority of Kenya (CA) , Kenya , Rwanda Utilities Regulatory Authority (RURA) , Tanzania Communications Regulatory Authority (TCRA) , Uganda Communications Commission (UCC) Q7/5 2019-04-26
[ 447 ]
(Rev.1)
K.Sup.access_trunk_networks to-ITU-T-K.45 on "Rationale for setting resistibility requirements of telecommunication equipment installed in the access and trunk networks against lightning": 1st draft of Supplement � Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q2/5 2019-04-26
[ 446 ]
(Rev.1)
K.Sup.telecom_centre to-ITU-T-K.20 on "Rationale for setting resistibility requirements of telecommunication equipment installed in a telecommunication centre against lightning": 1st draft of Supplement � Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q2/5 2019-04-26
[ 445 ]
(Rev.1)
K.Sup.customer to-ITU-T-K.21 on "Rationale for setting resistibility requirements of telecommunication equipment installed in customer premises against lightning": 1st draft of Supplement � Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q2/5 2019-04-26
[ 444 ]
K.spdsafe: fifth draft of "Guidance on safety relating to the use of surge protective devices and surge protective components in telecommunication terminal equipment" � Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q2/5 2019-04-26
[ 443 ]
Manhole-type base station (update of Appendix IX in K.91) � National Institute of Information and Communications Technology (NICT) (Japan) , NTT DOCOMO, INC. (Japan) Q3/5 2019-04-26
[ 442 ]
Notes for applying IEC 61000-4-5 Ed.3 � Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q4/5 2019-04-26
[ 441 ]
L.CE_Concepts on "Circular Economy; Definitions and concepts for material efficiency for ICT": Proposed new baseline text � Egypt , Huawei Technologies Co., Ltd. (China) Q7/5 2019-04-25
[ 440 ]
The 5th draft of K.vss "Lightning protection and Earthing of Video Surveillance System" � China Telecommunications Corporation Q1/5 2019-04-25
[ 439 ]

Withdrawn due to duplication
N/A 2019-04-25
[ 438 ]
Smart Monitoring and Communication Units of low-voltage surge protective devices(SPDs) used in telecommunication systems � China Telecommunications Corporation Q2/5 2019-04-25
[ 437 ]
New contents of intelligent heat pipe system proposed to add to draft recommendation L.SE_BS � China Unicom Q6/5 2019-04-25
[ 436 ]
New contents of intelligent heat exchange system proposed to add to draft recommendation L.SE_BS � China Unicom Q6/5 2019-04-25
[ 435 ]
(Rev.1)
New contents of intelligent fresh ventilation system proposed to add to draft recommendation L.SE_BS � China Unicom Q6/5 2019-04-25
[ 434 ]
(Rev.1)
Information of semiconductor devices required for design of telecommunication equipment applying soft error mitigation measures � Fujitsu Limited (Japan) , Hitachi, Ltd. (Japan) , NEC Corporation (Japan) , Nippon Telegraph and Telephone Corporation (NTT) , Oki Electric Industry Company Ltd. (OKI) (Japan) Q5/5 2019-04-25
[ 433 ]
New work item proposal on methodologies for evaluating the functionality and performance of power supply unit configured for servers � China Unicom Q6/5 2019-04-25
[ 432 ]
Proposed new work item on draft Recommendation ITU-T L.5G_sav-Energy saving technologies and best practices for 5G RAN equipment � China Telecommunications Corporation Q6/5 2019-04-25
[ 431 ]
5th draft of the new ITU-T Recommendation K.ipe "Electromagnetic compatibility requirements for Information Perception Equipment" � China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China) , ZTE Corporation (China) Q4/5 2019-04-25
[ 430 ]
(Rev.1)
Proposal for the 3rd revised draft of K.123 "Electromagnetic compatibility requirements for electrical equipment in telecommunication facilities" � Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q4/5 2019-04-24
[ 429 ]
(Rev.1)
Proposed a new method for assessing environmental and economic impacts of ICT at sector level by using a CGE model � Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q9/5 2019-04-23
[ 428 ]
(Rev.1)
Reducing the size of ITU-T Recommendation K.44 � Bourns Limited (United Kingdom) Q2/5 2019-04-22
[ 427 ]
(Rev.1)
Celebrating the life and works of Phillip Havens � Bourns Limited (United Kingdom) QALL/5 2019-04-22
[ 426 ]
Proposed an updated text of the proposed method for assessing environmental and economic impacts of ICT at sector level by using a CGE model � Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q9/5 2019-04-17
[ 425 ]
L.CE_Concepts definitions � Nokia Corporation (Finland) Q7/5 2019-04-16
[ 424 ]
Proposed Terms of Reference for new Focus Group on "Environmental Efficiency for Artificial Intelligence and other Emerging Technologies" (FG-AI4EE) � Argentina , Brazil , China Unicom , China , Cisco Systems, Inc. (United States) , Colombia , Consorzio Nazionale Interuniversitario per le Telecomunicazioni CNIT (Italy) , Dominican Rep. , Egypt , Greece , Huawei Technologies Co., Ltd. (China) , Italy , Kenya , Korea (Rep. of) , Nokia Corporation (Finland) , Orange (France) , Rwanda , Spain , Telecommunication and Postal Regulatory Authority (Sudan) , Telefon AB - LM Ericsson (Sweden) , Uganda Communications Commission (UCC) QALL/5 2019-04-15
[ 423 ]
Increasing Concerns with ever Increasing Deployment of EMF Emission Equipment � Public Utilities Regulatory Authority (PURA) (Gambia) Q3/5 2019-04-15
[ 422 ]
(Rev.1)
Nokia proposals to L.CE_Concepts for Q7/5 e-meeting held on 27 March 2019 � Nokia Corporation (Finland) Q7/5 2019-04-15
[ 421 ]
(Rev.1)
Nokia proposals to L.CE_Concepts for Q7/5 e-meeting held on 14 February 2019 � Nokia Corporation (Finland) Q7/5 2019-04-15
[ 420 ]
(Rev.1)
Nokia comments on L.CE_Concepts for Q7/5 e-meeting held on 5 December 2018 � Nokia Corporation (Finland) Q7/5 2019-04-15
[ 419 ]
Les Technologies de l'Information et de la Communication au service de la r�alisation des Objectifs de D�veloppement Durable � Minist�re des Postes, des T�l�communications et de l'Economie Num�rique (Guinea) Q9/5 2019-04-08
[ 418 ]
(Rev.1)
Waste Electrical and Electronic Equipment Management (WEEE or E-waste) in Benin � Benin QALL/5, Q7/5 2019-04-08
[ 417 ]
(Rev.1)
Completion of the missing information on the capacitor used in tests � Bourns Limited (United Kingdom) Q2/5 2019-04-05
[ 416 ]
ICT for Smart Agriculture � Telecommunication and Postal Regulatory Authority (Sudan) Q9/5 2019-03-25
[ 415 ]
E-Waste Management � Telecommunication and Postal Regulatory Authority (Sudan) Q7/5 2019-03-25
[ 414 ]
L'impact des TIC pour la lutte contre le changement climatique en Union des Comores � Autorit� Nationale de R�gulation des Technologies de l'Information et de la Communication (ANRTIC) (Comoros) Q6/5 2019-03-20
[ 413 ]
Findings and recommendations from the study on End of life Management (EoL) management of communications equipment (phase 1) � Uganda Communications Commission (UCC) Q7/5 2019-03-19
[ 412 ]
Baseline document: Adequate Assessment and Sensitisation on Counterfeit ICT Products and their Environmental Impact (L.Counterfeit) � Kenya , Uganda Communications Commission (UCC) Q7/5 2019-03-19
[ 411 ]
(Rev.1)
Madagascar case study for health electromagnetic radiation effects - Integration of ITU and ICNIRP recommendations into the regulatory framework to address legitimate public concerns. � Autorit� de R�gulation des Technologies de Communication (ARTEC) (Madagascar) Q3/5 2019-03-12
[ 410 ]
(Rev.1-2)
Climate change and assessment of information and communucation technology (ICT) in the framework of the Substainable Development Goals (SDGs) � Minist�re des Postes, T�l�communications et Nouvelles Technologies de l'Information et de la Communication (Dem. Rep. of the Congo) Q3/5 2019-03-05
[ 409 ]
New versions v 8.32 and 8.64 of the software "EMF-estimator" � National Institute of Telecommunications (Poland) , Orange Polska S.A. (Poland) Q3/5 2018-08-30
[ 408 ]
Baseline document L.EW 2020 Guideline on Implementing the E-waste Reduction Target of the Connect2020 Agenda � Argentina , Egypt , Huawei Technologies Co., Ltd. (China) Q7/5 2018-08-30
[ 407 ]
Proposed table of content for a proposed new work item on "A methodology for improving, assessing and scoring the sustainability performance of office buildings" � MJRD Assessment Inc. (Canada) Q6/5 2018-08-30
[ 406 ]
Proposed new work item on draft Recommendation ITU-T L.xxx on A Methodology for improving, assessing and scoring the sustainability performance of office buildings � MJRD Assessment Inc. (Canada) Q6/5 2018-08-30
[ 405 ]
Proposed baseline text for proposed new draft Recommendation ITU-T K.Workers_safety � Wavecontrol, S.L. (Spain) Q3/5 2018-08-30
[ 404 ]
Proposed input to draft recommendation L.CEM Criteria for evaluation of the environmental impact of mobile phones by Apple, Huawei and BRS during the interim period May- September 2018 � Egypt Q7/5 2018-08-30
[ 403 ]
BRS's additions to the draft L.EW Connect 2020 during the Interim period May- September 2018 � Egypt Q7/5 2018-08-30
Resultats:902 documents
R�sultats :� Pr�c�dent�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 �-�Suivant Next
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� TSB EDH
Mis � jour le :�2022-01-20