Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-R : WP1A : Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-R�WP1A� C�

UIT-R�WP1A

Techniques d�Ing�nierie du Spectre

Resultats:466 documents
R�sultats :� Pr�c�dent�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10
Contributions��Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 16 ]
Liaison statement to Working Party 1A (Copy to Working Parties 1B, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam � WP 7D Q210/1 2016-04-13
[ 15 ]
Working document on the work plan and milestones for the ITU-R studies on WRC-19 agenda item 1.15 � Chairman, WP 1A AI1.15 2016-04-13
[ 14 ]
Liaison statement to Working Parties 3K and 3M (for action) and Study Group 5 and Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A and 7C (for information) � WP 7D 2016-04-11
[ 13 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C and 6A concerning WRC-19 agenda item 1.7 (copy for information to Working Party 1A, Working Party 3M and Working Party 4B) - WRC-19 agenda item 1.7 � WP 7B AI1.7 2016-04-07
[ 12 ]
Liaison statement to Radiocommunication Study Groups and Working Parties � Chairman, CCV 2016-04-01
[ 11 ]
Liaison statement to Working Party 1A on new Report ITU-R SM.2352-0 - Copy for information to Working Parties 5A, 5C, 7C and 7D - Technology trends of active services in the band above 275 GHz � Institute of Electrical and Electronics Engineers, Inc. 2016-03-21
[ 10 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C AND 7D) - Working document towards a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED] � WP 5D 2016-03-09
[ 9 ]
Liaison statement on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) - Standards overview and workplans � ITU-T SG 15 2016-03-08
[ 8 ]
Liaison statement on the latest versions of the Home Network Transport (HNT) - Standards overview and workplan � ITU-T SG 15 2016-03-08
[ 7 ]
Liaison statement on the latest versions of the Access Network Transport (ANT) - Standards overview and workplan � ITU-T SG 15 2016-03-08
[ 6 ]
Liaison statement - Information on current status of Study on Question ITU-R 210-3/1 "Wireless power transmission" in APT Wireless Group � Asia-Pacific Telecommunity 2016-02-19
[ 5 ]
Liaison statement on request to consider the hearing aids issue on Wireless Power Transmission (WPT) work � ITU-T JCA-AHF 2016-02-12
[ 4 ]
Spectra of wireless power transfer base stations � Germany (Federal Republic of) 2016-01-19
[ 3 ]
Liaison statement evaluating the leakage and impact of radio frequency noise from telecommunication systems using metallic conductors � ITU-T SG 5 2015-12-08
[ 2 ]
Liaison statement on information about work that is being carried out within work under study in ITU-T Question 7/5 � ITU-T SG 5 2015-12-08
[ 1 ]
Documents to be carried over from the 2012-2015 study period � WP 1A 2015-12-08
Resultats:466 documents
R�sultats :� Pr�c�dent�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� Coordinateur du Web UIT-R
Mis � jour le :�2020-12-15