Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 465 ]
�
� |
Working document towards a preliminary draft new Recommendation on statistical methodologies to estimate the interference into fixed service (FS) stations operating in the 27.5-29.5 GHz frequency band from land earth stations in motion (L-ESIMS) communicating with FSS geostationary space stations
�
� |
United States of America
� |
AI1.5
� |
2017-10-10 |
|
[ 464 ]
�
� |
Working document [towards a preliminary draft new Report] on sharing with incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands - WRC-19 agenda item 9.1, issue 9.1.9
�
� |
United States of America
� |
AI9.1
� |
2017-10-10 |
|
[ 463 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the MS in the frequency band 27.5-29.5 GHz
�
� |
United States of America
� |
AI1.5
� |
2017-10-10 |
|
[ 462 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz
�
� |
United States of America
� |
AI1.5
� |
2017-10-10 |
|
[ 461 ]
�
� |
Input on working document - Issue F: Concerns with the lack of implementation of certain provisions of the Radio Regulations that can lead to difficulties during the process of entering an assignment into the RR Appendix 30B list
�
� |
United States of America
� |
AI7
� |
2017-10-10 |
|
[ 460 ]
�
� |
Proposed revisions to the Work Plan
�
� |
United States of America
� |
AI1.6
� |
2017-10-10 |
|
[ 459 ]
�
� |
Revisions to working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the bringing into use of frequency assignments to non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO FSS satellite systems in certain bands
�
� |
United States of America
� |
AI7
� |
2017-10-10 |
|
[ 458 ]
�
� |
Preliminary draft new [Recommendation/Report] ITU-R S.[GUIDELINES_14.5-14.8 GHz] - Guidelines to conduct bilateral coordination for explicit agreements, in the frequency band 14.5-14.75 GHz, for Regions 1 and 2 countries, or in the frequency band 14.5-14.8 GHz, for Region 3 countries, in the fixed-satellite service (Earth-to-space) not for feeder links for the broadcasting- .....
�
� |
United States of America
� |
� |
2017-10-10 |
|
[ 457 ]
�
� |
Working document towards a PDN Report on sharing between ESIM and stations in the mobile service (WRC-19 agenda item 1.5)
�
� |
United States of America
� |
AI1.5
� |
2017-10-10 |
|
[ 456 ]
�
� |
Draft reply liaison statement to TG 5/1 questions
�
� |
United States of America
� |
� |
2017-10-10 |
|
[ 455 ]
�
� |
Modification to working document towards a preliminary draft new Report ITU-R S.[SPECTRUM_SHARING] - Sharing with incumbent services in the 51.4-52.4 GHz band and
adjacent and nearby bands WRC-19 agenda item 9.1, issue 9.1.9
�
� |
China (People's Republic of)
� |
AI9.1
� |
2017-10-10 |
|
[ 454 ]
�
� |
Proposal for the draft CPM Report on WRC-19 agenda item 9.1, issue 9.1.9
�
� |
China (People's Republic of)
� |
AI9.1
� |
2017-10-10 |
|
[ 453 ]
�
� |
Preliminary draft CPM text for WRC-19 agenda item 7 - Issue C: Issues for which consensus was readily achieved in ITU-R
�
� |
China (People's Republic of)
� |
AI7
� |
2017-10-10 |
|
[ 452 ]
�
� |
Proposal for the draft CPM Report on WRC-19 agenda item 9.1, issue 9.1.3
�
� |
China (People's Republic of)
� |
AI9.1
� |
2017-10-10 |
|
[ 451 ]
�
� |
Views and proposals on the studies of the agenda item 9.1 issue 9.1.2
�
� |
China (People's Republic of)
� |
� |
2017-10-10 |
|
[ 450 ]
�
� |
WRC-19 agenda item 1.5 - Case study on FS and ESIM coexistence
�
� |
Senegal (Republic of)
� |
AI1.5
� |
2017-10-09 |
|
[ 449 ]
�
� |
Assessment of the interference in EESS (passive) in the band 52.6-54.25 GHz produced by feeder links of GSO FSS networks that may operate in the band 51.4-52.4 GHz
�
� |
European Space Agency
,
European Organisation for the Exploitation of Meteorological Satellites
� |
AI9
� |
2017-10-09 |
|
[ 448 ]
�
� |
Assessment of the interference in EESS (passive) in the band 50.2-50.4 GHz produced by feeder links of FSS NGSO constellations in adjacent band
�
� |
European Space Agency
,
European Organisation for the Exploitation of Meteorological Satellites
� |
AI9
� |
2017-10-09 |
|
[ 447 ]
�
� |
Proposed liaison statement to ITU-R Task Group 5/1 and Working Parties 5A and 5C on the FSS/BSS protection criteria for sharing studies under WRC-19 agenda items 1.13, 1.14 and 1.16
�
� |
EMEA Satellite Operators Association (ESOA)
� |
AI1.16, AI1.14, AI1.13
� |
2017-10-09 |
|
[ 446 ]
�
� |
FSS protection criteria for sharing studies under WRC-19 agenda item 1.13
�
� |
Russian Federation
� |
AI1.13
� |
2017-10-09 |
|
[ 445 ]
�
� |
Working document towards proposals to the methodology for determining whether interference to a satellite network operating in the 50/40 GHz FSS frequency bands meets the requirements of maximum permissible levels of interference
�
� |
Russian Federation
� |
� |
2017-10-09 |
|
[ 444 ]
�
� |
Proposals for a draft new Resolution [AI 1.5/ESIM] (WRC-19)
�
� |
Russian Federation
� |
AI1.5
� |
2017-10-09 |
|
[ 443 ]
�
� |
Proposals on WRC-19 agenda item 1.4 in relation to WD towards PDNRep ITU-R BO.[AP30.ANNEX7]
�
� |
Russian Federation
� |
AI1.4
� |
2017-10-09 |
|
[ 442 ]
�
� |
Estimation of the protection level of the earth station with antenna smaller than 60 cm provided by the presence of forbidden arc portions
�
� |
Russian Federation
� |
AI1.4
� |
2017-10-09 |
|
[ 441 ]
�
� |
Proposals on WRC-19 agenda item 1.4 in relation to preliminary draft CPM text
�
� |
Russian Federation
� |
AI1.4
� |
2017-10-09 |
|
[ 440 ]
�
� |
Validation of the minimum emission parameters contained within submissions of FSS satellite networks not subject to a plan
�
� |
Canada
,
United Kingdom of Great Britain and Northern Ireland
� |
� |
2017-10-09 |
|
[ 439 ]
�
� |
Annex 37 to Working Party 4A Chairman's Report - Preliminary draft CPM text for WRC-19 agenda item 7 - Issue D: Identification of those specific satellite networks and systems with which coordination needs to be effected under RR Nos. 9.12, 9.12A and 9.13
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
AI7
� |
2017-10-09 |
|
[ 438 ]
�
� |
Regulatory provisions for the modification of notices relative to non-geostationary systems operating in the FSS, MSS and BSS above 10 GHz subject to Section II of Article 9 of the Radio Regulations
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
AI7
� |
2017-10-09 |
|
[ 437 ]
�
� |
Proposed revisions to working document on WRC-19 agenda item 1.5 - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
AI1.5
� |
2017-10-09 |
|
[ 436 ]
�
� |
Principles and a proposed methodology for issue a of WRC-19 - Agenda item 7
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
AI7
� |
2017-10-09 |
|
[ 435 ]
�
� |
Proposed draft Resolution to address WRC-19 agenda item 1.5
�
� |
Austria
,
France
,
Germany (Federal Republic of)
,
Luxembourg
,
Netherlands (Kingdom of the)
,
Norway
,
Switzerland (Confederation of)
,
United Kingdom of Great Britain and Northern Ireland
� |
AI1.5
� |
2017-10-09 |
|
[ 434 ]
�
� |
Draft revision to Recommendation ITU-R S.1503: Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite system networks with limits contained in Article 22 of the Radio Regulations
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2017-10-09 |
|
[ 433 ]
�
� |
Fixed and broadcasting satellite service sharing criteria for WRC-19 agenda item 1.13
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
AI1.13
� |
2017-10-09 |
|
[ 432 ]
�
� |
Working document towards a draft new Report on small BSS antenna patterns
�
� |
Bulgaria (Republic of)
� |
� |
2017-10-09 |
|
[ 431 ]
�
� |
Proposal for revision of the working document towards preliminary draft CPM text for WRC-19 agenda item 7, issue G
�
� |
Bulgaria (Republic of)
� |
AI7
� |
2017-10-09 |
|
[ 430 ]
�
� |
Working document towards draft CPM text on WRC-19 agenda item 7, new issue Y
�
� |
Iran (Islamic Republic of)
� |
AI7
� |
2017-10-09 |
|
[ 429 ]
�
� |
Working document towards draft CPM text on WRC-19 agenda item 7, new issue X
�
� |
Iran (Islamic Republic of)
� |
AI7
� |
2017-10-09 |
|
[ 428 ]
�
� |
Preliminary draft CPM text for WRC-19 agenda item 7 - Issue E
�
� |
Iran (Islamic Republic of)
� |
AI7
� |
2017-10-09 |
|
[ 427 ]
�
� |
Working document towards draft CPM text on agenda item 7, issue C3
�
� |
Iran (Islamic Republic of)
� |
AI7
� |
2017-10-09 |
|
[ 426 ]
�
� |
Working document towards draft CPM text on WRC-19 agenda item 7, issue C2
�
� |
Iran (Islamic Republic of)
� |
AI7
� |
2017-10-09 |
|
[ 425 ]
�
� |
Working document towards draft CPM text on WRC-19 agenda item 7, issue C1
�
� |
Iran (Islamic Republic of)
� |
AI7
� |
2017-10-09 |
|
[ 424 ]
�
� |
Proposed amendments to working document towards preliminary draft CPM text for WRC-19 agenda item 9.1, issue 9.1.3
�
� |
Indonesia (Republic of)
� |
AI9.1
� |
2017-10-09 |
|
[ 423 ]
�
� |
Proposed amendments to working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIO] - Studies relating to the bringing into use of frequency assignments
to non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO FSS satellite systems in certain bands
�
� |
Indonesia (Republic of)
� |
� |
2017-10-09 |
|
[ 422 ]
�
� |
Guidance and updates to the FSS/BSS technical parameters for sharing studies under WRC-19 agenda items 1.13, 1.14 and 1.16
�
� |
United Arab Emirates
� |
AI1.16, AI1.14, AI1.13
� |
2017-10-09 |
|
[ 421 ]
�
� |
Proposed new issue X under WRC-19 agenda item 7 - Difficulties for Part B examinations under & 6.21 C) of RR Appendix 30B
�
� |
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
� |
AI7
� |
2017-10-09 |
|
[ 420 ]
�
� |
Proposed modification to preliminary draft CPM text for WRC-19 agenda item 7 issue C6
�
� |
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
� |
AI7
� |
2017-10-09 |
|
[ 419 ]
�
� |
Preliminary draft revision of Recommendation ITU-R S.1503-2 - Functional description to be used in developing software tools for determining conformity of non-geostationary -satellite orbit fixed-satellite system networks with limits contained in Article 22 of the Radio Regulations (Draft)
�
� |
Canada
� |
� |
2017-10-06 |
|
[ 418 ]
�
� |
Observations on procedural issues related to the application of a possible revision to Recommendation ITU-R S.1503-2
�
� |
Canada
� |
AI7
� |
2017-10-06 |
|
[ 417 ]
�
� |
Proposed modifications to the working document towards a preliminary draft new Report ITU-R S. [NGSO_FSS_BIU]
�
� |
Canada
� |
AI7
� |
2017-10-06 |
|
[ 416 ]
�
� |
Comments and proposals relating to Issue C3 under agenda item 7
�
� |
Canada
� |
AI7
� |
2017-10-06 |
Resultados :915 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):