Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 98 ]
�
� |
Liaison statement to ITU-R WP 4A - Consideration of sharing between radio local area networks (RLANs) and feeder links of non-GSO mobile-satellite service systems in the band 5 150-5 250 MHz
�
� |
JTG 4-7-8-9
� |
� |
2001-10-03 |
|
[ 97 ]
�
� |
Liaison statement to WP 4A - Modifications to Recommendation ITU-R S.1257
�
� |
WP 4-9S
� |
� |
2001-10-03 |
|
[ 96 ]
�
� |
Liaison statement to Working Party 8F (and to Working Party 4A for information) - Satellite component of IMT-2000 and beyond
�
� |
WP 8D
� |
� |
2001-10-03 |
|
[ 95 ]
�
� |
Liaison statement to WP 4A on Proposals for simplification of APS4 request for coordination
�
� |
WP 8D
� |
� |
2001-10-03 |
|
[ 94 ]
�
� |
Liaison statement to Working Party 4A concerning agenda item 1.11 of WRC-03
�
� |
WP 8D
� |
� |
2001-10-03 |
|
[ 93 ]
�
� |
Chairman's Report from the meeting of WP 4A - Geneva, 25 September - 4 October 2000
�
� |
Chairman, WP 4A
� |
� |
2001-10-03 |
|
[ 92 ]
�
� |
Liaison statement to Working Parties 4A, 6E, 6S, 7B, 7C, 7D, 8A, 8B, 8D, 8F and 9B - Proposals for reviewing the definitions of the spectral properties of transmitter emissions
�
� |
SG 1
� |
� |
2001-10-03 |
|
[ 91 ]
�
� |
Liaison statement to Working Parties 4A, 6S, 7C, 8D and 9D - Concerning the band-by-band study between the earth exploration-satellite service (EESS) and other services
�
� |
SG 1
� |
� |
2001-10-03 |
|
[ 90 ]
�
� |
Liaison statement to Working Parties 4A, 6E, 6S, 7C, 7D, 8A, 8B, 8D, 8F, 9B, 9C and 9D - Rapporteur's Group on WRC-03 Agenda item 1.8.1
�
� |
SG 1
� |
� |
2001-10-03 |
|
[ 89 ]
�
� |
Liaison statement to Working Parties 4A, 6S, 7C, 7D, 8B, 8D and 9D - Task Group on WRC-03 Agenda item 1.8.2 concerning the protection of passive services bands from unwanted emissions
�
� |
SG 1
� |
� |
2001-10-03 |
|
[ 88 ]
�
� |
Liaison statement to Working Parties 4A, 4B, 6E, 6S, 7C, 7D, 8A, 8B, 8D, 8F, 9B, 9C, and 9D
�
� |
SG 1
� |
� |
2001-10-03 |
|
[ 87 ]
�
� |
Liaison statement to Working Parties 4A, 6S, 7C, 7D, and 8D - Concerning a Working Document towards a methodology for the interference analysis between transmitters and the passive service operating in different bands
�
� |
SG 1
� |
� |
2001-10-03 |
|
[ 86 ]
�
� |
Liaison statement to ITU-R Working Party 4A - Methodology for interference evaluation, technical parameters and operational techniques for frequency sharing between the FS using high altitude platform stations (RR FN S5.537/S5.SSS) and the FSS in.
�
� |
WP 4-9S
� |
� |
2001-10-03 |
|
[ 85 ]
�
� |
Liaison statement to WP 4A concerning Studies performed by WP 4-9S regarding Mitigation techniques proposed for fixed-satellite service (FSS) to facilitate sharing with fixed service (FS) in the band 17.7-19.7 GHz
�
� |
WP 4-9S
� |
� |
2001-10-03 |
|
[ 84 ]
�
� |
Liaison statement to Working Party 4A - Characteristics of Earth stations on-board vessels operating in the FSS frequency bands 3 700-4 200 MHz and 5 926-6 425 MHz
�
� |
WP 4-9S
� |
� |
2001-10-03 |
|
[ 83 ]
�
� |
Liaison statement to Working Parties 9A, 9B and 4A - A new methodology to be used for the evaluation of the impact of space-to-Earth interference from the fixed-satellite service on the fixed service in frequency bands where ...
�
� |
WP 4-9S
� |
� |
2001-10-03 |
|
[ 82 ]
�
� |
Liaison statement to Working Parties 4A and 8F - Satellite component of IMT-2000 and beyond
�
� |
WP 8D
� |
� |
2001-10-03 |
|
[ 81 ]
�
� |
Liaison statement to Working Parties 4A and 7D and Task Group 1/5 - Correspondence group on the epfd concept for radio astronomy
�
� |
WP 8D
� |
� |
2001-10-03 |
|
[ 80 ]
�
� |
Liaison statement to ITU-R Study Group 1 and Working Parties 6M, 6E, 7E, 8A, 8F, 9B and JRG 8A-9B - Terrestrial wireless interactive multimedia systems
�
� |
JTG 1-6-8-9
� |
� |
2001-10-03 |
|
[ 79 ]
�
� |
Liaison statement to Working Parties 4A, 8A and 8B - Use of earth stations on board vessels operating in the 11/14 GHz bands
�
� |
WP 4-9S
� |
� |
2001-10-03 |
|
[ 78 ]
�
� |
Liaison statement to Working Party 4A - Impact of loss of synchronization and timing recovery on availability in hypothetical reference digital paths
�
� |
WP 4B
� |
� |
2001-10-03 |
|
[ 77 ]
�
� |
Liaison statement to Working Parties 3M and 4A concerning building attenuation at around 5 GHz
�
� |
JRG 8A-9B
� |
� |
2001-10-03 |
|
[ 76 ]
�
� |
Liaison statement to Working Party 4A - Proposed modification to Recommendation ITU-R S.1323
�
� |
WP 4B
� |
� |
2001-10-03 |
|
[ 75 ]
�
� |
Liaison statement to Working Party 4A - Preliminary draft new Recommendation impact of sun interference into a GSO FSS link
�
� |
WP 4B
� |
� |
2001-10-03 |
|
[ 74 ]
�
(Rev.1)� |
Liaison statement from Working Party 6S to Working Party 4A - Proposed draft agenda for joint 4A/6S meeting on 26 September 2000
�
� |
WP 6S
� |
� |
2001-10-03 |
|
[ 73 ]
�
� |
Reply to liaison statement from Working Party 4A - Study of characteristics of radars and mitigation techniques for the protection of FSS systems in the 17.3-17.7 GHz band
�
� |
WP 6S
� |
� |
2001-10-03 |
|
[ 72 ]
�
� |
List of documents issued
�
� |
BRSGD
� |
� |
2001-10-03 |
|
[ 71 ]
�
� |
Discussion of measures to ensure the protection of feeder links (Earth-to-space) for the mobile satellite service in the band 5 150-5 250 MHz
�
� |
ICO Global Communications (UK)
� |
� |
2001-10-03 |
|
[ 70 ]
�
� |
Aggregate interference levels between closely spaced dual circularly and dual linearly polarized geostationary-satellite networks in the fixed-satellite service operating in the 4/6 GHz frequency bands
�
� |
New skies satellites
� |
� |
2001-10-03 |
|
[ 69 ]
�
� |
Working Document - Simulation times required for NGSO/NGSO sharing studies
�
� |
France
� |
� |
2001-10-03 |
|
[ 68 ]
�
� |
Considerations on the applicability of aggregate power flux-density limits at a NGSO MSS feeder link (Earth-to-space) satellite receiver for RLAN transmitters operating in the 5 150-5 250 MHz band
�
� |
France
� |
� |
2001-10-03 |
|
[ 67 ]
�
� |
Working Document - Proectionof GSO FSS and GSO BSS networks from the maximum aggregate EPFD produced by multiple non-GSO FSS systems in the 10-14 GHz band
�
� |
France
� |
� |
2001-10-03 |
|
[ 66 ]
�
� |
Working document towards a preliminary draft new Recommendation - Methodology to assess the off axis EIRP levels generated by a NGSO FSS satellite system in frequency bands subject to EPFDup limits
�
� |
France
� |
� |
2001-10-03 |
|
[ 65 ]
�
� |
Working document - Discussion on the methodology for assessing the interference between NGSO satellite systems
�
� |
France
� |
� |
2001-10-03 |
|
[ 64 ]
�
� |
Draft revision to Recommendation ITU-R S.1325 to more accurately assess the EPFD statistics generated by a non-GSO FSS system
�
� |
France
� |
� |
2001-10-03 |
|
[ 63 ]
�
� |
PDNR on Methodology to derive continuous curves of EPFD versus GSO FSS antenna diameter
�
� |
France
� |
� |
2001-10-03 |
|
[ 62 ]
�
+Add.1� |
Compatibility analyisis between the new Regions 1 & 3 BSS Plans and the FSS in Regions 2 and 3
�
� |
France
� |
� |
2001-10-03 |
|
[ 61 ]
�
� |
Preliminary draft new Recommendation - Methodologies to calculate the aggregate epfd down produced by multiple NGSO FSS systems into a GSO FSS networks
�
� |
Intelsat
� |
� |
2001-10-03 |
|
[ 60 ]
�
� |
Unwanted emissions
�
� |
Intelsat
� |
� |
2001-10-03 |
|
[ 59 ]
�
� |
Working document toward a draft new Recommendation - Practical levels of out-of-band emissions for geostationary FSS satellites operating in the band 11.7-12.2 GHz
�
� |
United States of America
� |
� |
2001-10-03 |
|
[ 58 ]
�
� |
Frequency sharing between inter-satellite links using ISS allocations
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2001-10-03 |
|
[ 57 ]
�
� |
United Kingdom
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2001-10-03 |
|
[ 56 ]
�
� |
An analytical method study of the impact of avoidance angle mitigation techniques on the percentage of the time allowance used by the interference produced by non-GSO systems in a interference environment involving three non-GSO systems
�
� |
Brazil (Federative Republic of)
� |
� |
2001-10-03 |
|
[ 55 ]
�
� |
Chairman, Radiocommunication Study Group 4
�
� |
Chairman, SG 4
� |
� |
2001-10-03 |
|
[ 54 ]
�
� |
Review and refinements to Appendix S4 (WRC-2000) with respect to its use in application of Appendices S30, S30A and S30B
�
� |
Korea (Republic of)
� |
� |
2001-10-03 |
|
[ 53 ]
�
� |
Protection requirements for 14 GHz FSS up-links against potential interference from aircraft transmissions
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2001-10-03 |
|
[ 52 ]
�
� |
Maintenance of Recommendation ITU-R S.1503
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2001-10-03 |
|
[ 51 ]
�
� |
Proposed preliminary draft revision to Recommendation ITU-R S.1323 - Loss of synchronization
�
� |
Canada
� |
� |
2001-10-03 |
|
[ 50 ]
�
� |
Issus related to WRC-03 Agenda item 1.25 - Identification of bands for high-density deployment in the FSS
�
� |
Canada
� |
� |
2001-10-03 |
|
[ 49 ]
�
� |
Analytical method for assessing the statistics of interference between non-GSO satellite systems and GSO satellite systems, Fixed Service Systems or other non-GSO satellite systems
�
� |
Brazil (Federative Republic of)
� |
� |
2001-10-03 |
Resultados :548 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):