Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 16 ]
�
� |
Liaison statement to Working Party 1A (Copy to Working Parties 1B, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
�
� |
WP 7D
� |
Q210/1
� |
2016-04-13 |
|
[ 15 ]
�
� |
Working document on the work plan and milestones for the ITU-R studies on WRC-19 agenda item 1.15
�
� |
Chairman, WP 1A
� |
AI1.15
� |
2016-04-13 |
|
[ 14 ]
�
� |
Liaison statement to Working Parties 3K and 3M (for action) and Study Group 5 and Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A and 7C (for information)
�
� |
WP 7D
� |
� |
2016-04-11 |
|
[ 13 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C and 6A concerning WRC-19 agenda item 1.7 (copy for information to Working Party 1A, Working Party 3M and Working Party 4B) - WRC-19 agenda item 1.7
�
� |
WP 7B
� |
AI1.7
� |
2016-04-07 |
|
[ 12 ]
�
� |
Liaison statement to Radiocommunication Study Groups and Working Parties
�
� |
Chairman, CCV
� |
� |
2016-04-01 |
|
[ 11 ]
�
� |
Liaison statement to Working Party 1A on new Report ITU-R SM.2352-0 - Copy for information to Working Parties 5A, 5C, 7C and 7D - Technology trends of active services in the band above 275 GHz
�
� |
Institute of Electrical and Electronics Engineers, Inc.
� |
� |
2016-03-21 |
|
[ 10 ]
�
� |
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C AND 7D) - Working document towards a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED]
�
� |
WP 5D
� |
� |
2016-03-09 |
|
[ 9 ]
�
� |
Liaison statement on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) - Standards overview and workplans
�
� |
ITU-T SG 15
� |
� |
2016-03-08 |
|
[ 8 ]
�
� |
Liaison statement on the latest versions of the Home Network Transport (HNT) - Standards overview and workplan
�
� |
ITU-T SG 15
� |
� |
2016-03-08 |
|
[ 7 ]
�
� |
Liaison statement on the latest versions of the Access Network Transport (ANT) - Standards overview and workplan
�
� |
ITU-T SG 15
� |
� |
2016-03-08 |
|
[ 6 ]
�
� |
Liaison statement - Information on current status of Study on Question ITU-R 210-3/1 "Wireless power transmission" in APT Wireless Group
�
� |
Asia-Pacific Telecommunity
� |
� |
2016-02-19 |
|
[ 5 ]
�
� |
Liaison statement on request to consider the hearing aids issue on Wireless Power Transmission (WPT) work
�
� |
ITU-T JCA-AHF
� |
� |
2016-02-12 |
|
[ 4 ]
�
� |
Spectra of wireless power transfer base stations
�
� |
Germany (Federal Republic of)
� |
� |
2016-01-19 |
|
[ 3 ]
�
� |
Liaison statement evaluating the leakage and impact of radio frequency noise from telecommunication systems using metallic conductors
�
� |
ITU-T SG 5
� |
� |
2015-12-08 |
|
[ 2 ]
�
� |
Liaison statement on information about work that is being carried out within work under study in ITU-T Question 7/5
�
� |
ITU-T SG 5
� |
� |
2015-12-08 |
|
[ 1 ]
�
� |
Documents to be carried over from the 2012-2015 study period
�
� |
WP 1A
� |
� |
2015-12-08 |
Results:466 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
� |
Multiple Document Download:�Formats and Languages to be included (when available):