International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : TG5.1 : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�TG5.1� C�

ITU-R�TG5.1

Task Group 5/1 - WRC-19 agenda item 1.13

Results:478 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 28 ]
Reply liaison statement to Task Group 5/1 on parameters for WRC-19 agenda item 1.13 (copy for information to Working Parties 5C and 5D) � WP 7B AI1.13 2016-11-01
[ 27 ]
Liaison statement to Task Group 5/1 on parameters concerning the radio astronomy service for WRC-19 agenda item 1.13 � WP 7D AI1.13 2016-11-01
[ 26 ]
Liaison statement to Working Party 4A (copied for information to Working Parties 3J, 3K, 3M, 4C, 5A, 6A, 7B and Task Group 5/1) - Modelling and simulation of IMT networks for use in sharing and compatibility studies � WP 5D 2016-10-17
[ 25 ]
Liaison statement to Task Group 5/1 (copy to Working Party 4B for information) - FSS/BSS technical parameters for sharing studies under WRC-19 agenda item 1.13 � WP 4A AI1.13 2016-10-14
[ 24 ]
Liaison statement to Working Party 5D (copied for information and action (if any) to Working Parties 4C, 5A, 6A, 7B and Task Group 5/1 and copied for information only to Working Parties 3J, 3K and 3M) - Modelling and simulation of IMT networks for use in sharing and compatibility studies � WP 4A 2016-10-06
[ 23 ]
Reply liaison statement to Task Group 5/1 - MSS parameters for studies under WRC-19 agenda item 1.13 � WP 4C AI1.13 2016-09-29
[ 22 ]
Information on the preparation of texts for the draft CPM Report to WRC-19 � Chairman, CPM-19 2016-09-19
[ 21 ]
Information document on the updated tentative meeting schedule of Task Group 5/1 � Chairman, TG 5/1 2016-08-12
[ 20 ]
(Rev.1)
Reply liaison statement to Working Party 7D (copied for information to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and Task Group 5/1) - Propagation data and predictions for coexistence and compatibility studies above 50 GHz � WPs 3K and 3M 2016-07-04
[ 19 ]
Reply liaison statement to Working Party 5C (copied for information to Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and TG 5/1) - Propagation data and prediction methods required for coexistence and compatibility studies for High-Altitude Platform Stations (HAPS) � WP 3M 2016-07-04
[ 18 ]
Liaison statement to Working Parties 4A, 4C, 6A and 7B (copied to Working Parties 3J, 3K, 3M and Task Group 5/1 for information) - Modelling and simulation of IMT networks for use in sharing and compatibility studies � WP 5D 2016-06-28
[ 17 ]
(Rev.1)
Reply liaison statement to Study Group 3, Working Parties 3J, 3K, and 3M (copied for information to Task Group 5/1) - Propagation advice in support of WRC-19 agenda item 1.13: input requested from Working Party 5D � WP 5D AI1.13 2016-06-20
[ 16 ]
Liaison statement to Working Party 5D (copied for information to Task Group 5/1) - Propagation advice in support of agenda item 1.13: input requested from Working Party 5D � Chairmen, SG 3, WP 3J, WP 3K, WP 3M AI1.13 2016-06-01
[ 15 ]
+Ann.1-2
Report on the meeting of Task Group 5/1 (23-25 May 2016) � Chairman, TG 5/1 2016-05-24
[ 14 ]
Final list of participants - Task Group 5/1 (Geneva, 23-25 May 2016) � Director, BR 2016-05-24
[ 13 ]
List of documents issued (Documents 5-1/1 - 5-1/13) � BR Study Groups Department 2016-05-20
[ 12 ]
Liaison statement to ITU-R Working Parties 3M, 4A, 4C, 5A, 5D, 7B, 7C and 7D (for information to Task Group 5/1) - WRC-19 agenda item 1.14 � WP 5C 2016-05-20
[ 11 ]
Proposed liaison statement concerning WRC-19 agenda item 1.13 � Canada 2016-05-16
[ 10 ]
Considerations on the working methods within Task Group 5/1 � Canada 2016-05-16
[ 9 ]
Proposal for organisation of the work within ITU-R Task Group 5/1 for the preparation of the studies relevant to WRC-19 agenda item 1.13 � Brazil (Federative Republic of) 2016-05-16
[ 8 ]
Selection of the sharing and compatibility study scenarios on WRC-19 agenda item 1.13 � European Space Agency 2016-05-13
[ 7 ]
Down selection the sharing and compatibility study scenarios on WRC-19 agenda item 1.13 � China (People's Republic of) 2016-05-13
[ 6 ]
Proposed work method and work plan for Task Group 5/1 on agenda item 1.13 � China (People's Republic of) 2016-05-13
[ 5 ]
Terms of reference, allocation of work and draft CPM Report structure � Chairman, TG 5/1 2016-05-13
[ 4 ]
Note to Study Group 5 - Working Party 5D work on agenda item 1.13 � SG 5 2016-05-09
[ 3 ]
Liaison statement to Working Parties 3K and 3M (for action) and Study Group 5 and Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A and 7C (for information) � SG 5 2016-05-09
[ 2 ]
Organization of ITU-R Task Group 5/1 for the preparation of the studies relevant to agenda item 1.13 of WRC-19 � United Kingdom of Great Britain and Northern Ireland 2016-05-03
[ 1 ]
Considerations on working method of Task Group 5/1 � Japan 2016-04-28
Results:478 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2020-12-16