Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 231 ]
�
� |
Initial evaluation of the 8 degree coordination arc between geostationary fixed-satellite service networks in 17.7-20.2 GHz and 27.5-30 GHz
�
� |
United Kingdom of Great Britain and Northern Ireland
,
France
,
Germany (Federal Republic of)
,
Norway
� |
� |
2013-04-25 |
|
[ 230 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R S.[GSO E/S IN 29.5-30.0//19.7-20.2 GHz] - Technical and operational requirements for earth stations on mobile platforms operating with geostationary FSS satellite networks in the bands 19.7 - 20.2 GHz and 29.5 - 30.0 GHz
�
� |
United Kingdom of Great Britain and Northern Ireland
,
France
,
Germany (Federal Republic of)
,
Luxembourg
,
Netherlands (Kingdom of the)
,
Norway
� |
� |
2013-04-25 |
|
[ 229 ]
�
� |
Proposed changes to draft revision of Recommendation ITU-R S.1503-1
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2013-04-25 |
|
[ 228 ]
�
� |
Working document towards draft CPM text on WRC-15 Agenda item 9.1.5
�
� |
International Civil Aviation Organization
� |
� |
2013-04-25 |
|
[ 227 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R S.[FSS-REF_FOR_UAS] - Technical and operational characteristics of typical satellite communication links for potential use by UA Control and non-payload communication (CNPC) Agenda Item 1.5 (WRC15)
�
� |
Germany (Federal Republic of)
� |
� |
2013-04-25 |
|
[ 226 ]
�
� |
Protection criterion for FSS in sharing studies related to Agenda item 1.5
�
� |
Germany (Federal Republic of)
� |
� |
2013-04-25 |
|
[ 225 ]
�
� |
Proposal for liaison statement to Working Party 5D and Joint Task Group 4-5-6-7 - Suitable frequency ranges for IMT above 6 GHz
�
� |
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
� |
� |
2013-04-25 |
|
[ 224 ]
�
� |
Proposal for liaison statement to ITU-R Working Party 5D - Compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments
�
� |
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
� |
� |
2013-04-25 |
|
[ 223 ]
�
� |
Proposed modification to working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz band for the GSO fixed-satellite service in Regions 2 and 3
�
� |
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
� |
� |
2013-04-25 |
|
[ 222 ]
�
� |
Working document on guidelines that could be used by Administrations wishing to license ESOMPs mounted on vessels and operating in NGSO FSS systems in the frequency range 27-29.1 GHz while ensuring protection of terrestrial services
�
� |
United States of America
� |
� |
2013-04-25 |
|
[ 221 ]
�
� |
Working document on the guidelines that could be used by Administrations wishing to license airborne ESOMPs operating in NGSO FSS systems in the frequency range 27-29.1 GHz while ensuring protection of terrestrial services
�
� |
United States of America
� |
� |
2013-04-25 |
|
[ 220 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R S.[GSO FSS E/S IN 29.5-30.0/19.7-20.2 GHz] - Technical and operational requirements for earth stations on mobile platforms operating with geostationary FSS satellite networks in the bands 19.7-20.2 GHz and 29.5 - 30.0 GHz
�
� |
United States of America
� |
� |
2013-04-25 |
|
[ 219 ]
�
� |
Working document - Technical and operational studies towards the preparation of a preliminary draft new Report regarding earth stations on mobile platforms in the 17.3-19.7 and 27.5-29.5 GHz bands of the geostationary satellite orbit fixed-satellite service
�
� |
United States of America
� |
� |
2013-04-25 |
|
[ 218 ]
�
� |
Feasibility of FSS/AMS/Mobile sharing in the frequency band 14.5-15.35 GHz
�
� |
United States of America
� |
� |
2013-04-25 |
|
[ 217 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S.[RES756] - Studies on possible reduction of the coordination arc and technical criteria used in application of RR No. 9.41 in respect of coordination under RR No. 9.7
�
� |
Canada
� |
� |
2013-04-24 |
|
[ 216 ]
�
� |
Proposed elements for the Director's Report related to the experience in the application of the Radio Regulatory procedures and other relates matters - Review of the provisions associated with the use of the band 15.4-15.7 GHz by the FSS (Earth-to-space and space-to-Earth)
�
� |
Canada
� |
� |
2013-04-24 |
|
[ 215 ]
�
� |
Proposed modifications to the working document towards draft CPM text on WRC-15 Agenda item 1.7
�
� |
Canada
� |
� |
2013-04-24 |
|
[ 214 ]
�
� |
Sharing study between FS and FSS (space-to-Earth) in the band 7 150-7 250 MHz
�
� |
France
� |
� |
2013-04-24 |
|
[ 213 ]
�
� |
Sharing study between FSS (space-to-Earth) and SRS (Earth-to-space) in the band 7-8 GHz range
�
� |
France
� |
� |
2013-04-24 |
|
[ 212 ]
�
� |
Sharing study between the potential EESS (Earth to-space) and FSS allocations in the band 7-8 GHz range
�
� |
France
� |
� |
2013-04-24 |
|
[ 211 ]
�
� |
Sharing study between the potential EESS (Earth to-space) and FSS allocations in the band 7-8 GHz range
�
� |
France
� |
� |
2013-04-24 |
|
[ 210 ]
�
� |
Protection of SRS near-Earth missions in highly elliptical orbits (HEO) from proposed FSS (space-to-Earth) emissions in the band 7 190-7 235 MHz
�
� |
France
� |
� |
2013-04-24 |
|
[ 209 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz range for the GSO fixed-satellite service in Regions 2 and 3
�
� |
United States of America
� |
� |
2013-04-24 |
|
[ 208 ]
�
� |
Working document towards text for the draft Report to the Conference Preparatory Meeting (CPM) on WRC-15 Agenda Item 1.7
�
� |
United States of America
� |
� |
2013-04-24 |
|
[ 207 ]
�
� |
Liaison statement to Working Party 5B - Preliminary draft new Report ITU-R M.[UAS-PERF-AND-REQ] - WRC Agenda item 1.5 WD PDNR [UAS-FSS] FSS assumptions and characteristics
�
� |
United States of America
� |
� |
2013-04-24 |
|
[ 206 ]
�
� |
Modifications to Recommendation ITU-R S.1503-1
�
� |
United States of America
� |
� |
2013-04-24 |
|
[ 205 ]
�
� |
Draft liaison statement to Working Party 5D - Compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments
�
� |
United States of America
� |
� |
2013-04-24 |
|
[ 204 ]
�
� |
Working document towards a preliminary draft new Recommendation on a possible methodology for frequency sharing between fixed-satellite service networks comprising ubiquitously deployed earth stations and terrestrial services in adjacent areas
�
� |
United States of America
� |
� |
2013-04-24 |
|
[ 203 ]
�
� |
Interference effect of transmissions from earth stations on board vessels operating in fixed-satellite service networks on co-frequency stations
�
� |
United States of America
� |
� |
2013-04-24 |
|
[ 202 ]
�
� |
Further discussions on the Working Document towards a Preliminary Draft New Recommendation ITU-R S.[ALT.RAD.PTTRN]
�
� |
United States of America
� |
� |
2013-04-24 |
|
[ 201 ]
�
� |
Working document - Draft CPM text related to Agenda item 9.1.2 -Size of the coordination arc for triggering coordination under RR No.9.7 between geostationary-satellite networks
�
� |
United States of America
� |
� |
2013-04-24 |
|
[ 200 ]
�
� |
Working Document addressing consequences for late notification under RR No.11.49
�
� |
United States of America
� |
� |
2013-04-24 |
|
[ 199 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz range for the GSO fixed-satellite service in Regions 2 and 3
�
� |
United States of America
� |
� |
2013-04-24 |
|
[ 198 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz range for the GSO fixed-satellite service in Region 1
�
� |
United States of America
� |
� |
2013-04-24 |
|
[ 197 ]
�
� |
Working document on a framework for a Preliminary Draft New Recommendation for control and non-payload communication (CNPC) links of unmanned aircraft systems (UAS) in non- segregated airspace
�
� |
United States of America
� |
� |
2013-04-24 |
|
[ 196 ]
�
� |
Liaison statement to Working Party 5B - Clarification of BR comment on FSS assignments - WRC-15 Agenda item 1.5
�
� |
United States of America
� |
� |
2013-04-24 |
|
[ 195 ]
�
� |
Proposed updates to working document towards a preliminary draft new Report ITU-R S.[FSS 7/8 GHz compatibility] - Compatibility studies between the fixed-satellite service and the terrestrial and other space services in the frequency bands 7 150-7 250 MHz (space-to-Earth) and 8 400-8 500 MHz (Earth-to-space)
�
� |
United States of America
� |
� |
2013-04-24 |
|
[ 194 ]
�
� |
Agenda Item 1.6 FSS deployment model
�
� |
United States of America
� |
� |
2013-04-24 |
|
[ 193 ]
�
� |
WRC-15 Agenda item 1.6.1 - Estimation of probability of harmful interference to FS terrestrial stations from geostationary FSS satellites, considering additional primary allocation to GSO FSS (space-to-Earth) in the frequency band 14.8-15.35 GHz in Region 1
�
� |
Russian Federation
� |
� |
2013-04-22 |
|
[ 192 ]
�
� |
WRC-15 Agenda item 1.6.1 - Estimation of interference to receiving FSS earth stations from emissions of a single transmitting FS terrestrial station, considering additional primary allocation to GSO FSS (space-to-Earth) in the frequency band 14.8-15.35 GHz in Region 1
�
� |
Russian Federation
� |
� |
2013-04-22 |
|
[ 191 ]
�
� |
Draft liaison statement to ITU-R Working Party of the Special Committee - WRC-15 Agenda item 7
�
� |
Russian Federation
� |
� |
2013-04-22 |
|
[ 190 ]
�
� |
Working document - Proposal to draft liaison statement to Working Party 5C - WRC-15 Agenda item 1.8 - To review the provisions relating to earth stations located on board vessels (ESVs), based on studies conducted in accordance with Resolution 909 (WRC-12)
�
� |
Russian Federation
� |
� |
2013-04-22 |
|
[ 189 ]
�
� |
Draft new Report "Assessment of the orbital-frequency resource occupied by a geostationary satellite communication system"
�
� |
Russian Federation
� |
� |
2013-04-22 |
|
[ 188 ]
�
� |
Working document on the revision of the ITU-R Recommendations establishing the value of the criterion of the permissible interference between GSO satellite systems
�
� |
Russian Federation
� |
� |
2013-04-22 |
|
[ 187 ]
�
� |
Working Document - Criterion for coordination necessity between FSS and BSS GSO networks sharing frequency bands 4/6, 11/12/13/14 and 20/30/40GHz
�
� |
Russian Federation
� |
� |
2013-04-22 |
|
[ 186 ]
�
� |
WRC-15 Agenda item 1.6.1 - Estimation of probability of causing harmful interference to FS terrestrial stations from geostationary FSS under additional primary allocation to FSS (space-to-Earth) in frequency band 10.0-10.68 GHz in Region 1
�
� |
Russian Federation
� |
� |
2013-04-22 |
|
[ 185 ]
�
� |
Working Document - Revision of the ITU-R Recommendation S.1432
�
� |
Russian Federation
� |
� |
2013-04-22 |
|
[ 184 ]
�
� |
Proposals for modification of working document towards preliminary draft new report ITU-R [FSS 7/8 GHz COMPATIBILITY]
�
� |
Russian Federation
� |
� |
2013-04-22 |
|
[ 183 ]
�
� |
Feasibility estimation for sharing between fixed satellite service (space-to-Earth) and fixed service in the frequency band 14.5-15.35 GHz
�
� |
Russian Federation
� |
� |
2013-04-22 |
|
[ 182 ]
�
� |
Assessment of sharing feasibility of the fixed satellite service (space-to-Earth) in the frequency band 10.0-10.6 GHz with the radio astronomy service in the frequency range 10.6-10.7 GHz
�
� |
Russian Federation
� |
� |
2013-04-22 |
Results:681 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):