International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP5A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP5A� C�

ITU-R�WP5A

Land mobile service above 30 MHz (excluding IMT); wireless access in the fixed service; amateur and amateur-satellite service

Results:795 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 345 ]
Liaison statement to Working Party 1A (copy for information to Working Party 5A) on WRC-12 Agenda item 1.22 � WP 5D 2009-11-06
[ 344 ]
Liaison statement to Working Party 5A - Work on a PDN Report on isolation for antennas of base stations in the land mobile service including IMT � WP 5D 2009-11-06
[ 343 ]
Invitation for contributions in the development of an ITU-R Report on cognitive radio systems in the mobile service � Telefon AB-LM Ericsson 2009-11-02
[ 342 ]
Input of information from XGP forum to Working Party 5A for revision of ITU-R Report M.2116 "Characteristics of broadband wireless access systems operating in the land mobile service for use in sharing studies" � Director, BR 2009-11-02
[ 341 ]
Liaison statement - Response to comments from WP 5A about ANT Standards overview and Workplan � ITU-T SG 15 2009-10-29
[ 340 ]
First draft of new Recommendation of K.deg � ITU-T SG 5 2009-10-27
[ 339 ]
Proposed draft liaison statement to Working Party 5B on studies related to WRC-12 Agenda item 1.23 � Canada 2009-10-19
[ 338 ]
Progression of the working document towards a preliminary draft new Recommendation "Performance and availability requirements and objectives for wireless access systems" � Canada 2009-10-19
[ 337 ]
Preliminary draft new Recommendation ITU-R M.[LMS.PPDR.UHF] � Asia-Pacific Telecommunity (APT) 2009-10-16
[ 336 ]
Reply to liaison statement from Working Party 5A - On the study of mobile access systems providing radiocommunications to a large number of ubiquitous sensors and/or actuators scattered over wide areas � WP 1B 2009-10-12
[ 335 ]
Liaison statement to Working Party 5A - Information received from concerned Working Parties on WRC-12 Agenda item 1.19 � WP 1B 2009-10-12
[ 334 ]
Liaison statement to ITU-R Study Group 3 and Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D on the progress of WRC-12 Agenda item 1.19 � WP 1B 2009-10-12
[ 333 ]
Liaison statement to Working Party 5A - Compatibility of broadband wireless access systems and fixed-satellite service networks in the 3 400-4 200 MHz band � WP 4A 2009-10-09
[ 332 ]
Liaison statement to Working Parties 1B, 3K, 4A, 5A, 5D, 6A and 7C - WRC-12 Agenda item 1.22 � WP 1A 2009-10-09
[ 331 ]
Response liaison on the invitation for contributions in the development of an ITU-R Report on cognitive radio systems in the mobile service � Alcatel-Lucent France , Alcatel-Lucent Shanghai Bell , Alcatel-Lucent USA Inc. , AT&T Inc. , Nippon Telegraph and Telephone Corporation (NTT) , Nokia Corporation , Nokia Siemens Networks GmbH & Co KG , NTT DoCoMo Inc. , OKI Electric Industry Company Ltd. (OKI) 2009-10-05
[ 330 ]
Liaison statement to Working Party 5A - Information for studies related to WRC-12 Agenda item 1.25 � WP 4C 2009-10-05
[ 329 ]
Reply liaison statement to Working Party 5A - WRC-12 Agenda item 1.18 � WP 4C 2009-10-05
[ 328 ]
BWA characteristics in Report ITU-R M.2116 � Director, BR 2009-10-02
[ 327 ]
Interim Report on the Study Group 5 activity � Chairman, SG 5 2009-10-01
[ 326 ]
Liaison statement to ITU-R Working Parties 4A, 5A, and 5C on WRC-12 Agenda item 1.12 � WP 7B 2009-09-29
[ 325 ]
Liaison statement to Working Party 5A - Sharing between the space research service (Earth-to-space) and the inter-satellite, fixed and mobile services in the band 22.55-23.15 GHz � WP 7B 2009-09-29
[ 324 ]
Liaison statement to Working Party 5C (copy to Working Parties 5A and 5B for information) - Draft CPM text on WRC-12 Agenda item 1.24 � WP 7B 2009-09-28
[ 323 ]
Proposed revisions to the Work plan for studies related to WRC-12 Agenda item 1.23 � International Amateur Radio Union (IARU) 2009-09-11
[ 322 ]
Draft list of terminology on emergency telecommunications � WP 4B 2009-09-11
[ 321 ]
ABU views on WRC-12 Agenda items 1.4, 1.5, 1.10, 1.13, 1.14, 1.15, 1.19, 1.22, 1.25 � Asia-Pacific Broadcasting Union (ABU) 2009-09-07
[ 320 ]
Comments on version 9 of BWA Chapter of Land Mobile Handbook � Alliance for Telecommunications Industry Solutions 2009-07-24
[ 319 ]
Response to liaison statement from Working Party 5A on update of Report ITU-R M.2116 � IEEE 2009-07-28
[ 318 ]
Comments on preliminary draft revision of Recommendation ITU-R M.2116 � Alliance for Telecommunications Industry Solutions 2009-07-24
[ 317 ]
Liaison statement - Report of the 1st meeting of the Focus Group on Future Networks (FG-FN) � Chairman, ITU-T Focus Group on FN 2009-07-28
[ 316 ]
Liaison statement to ITU-T Study Group 5 (copied for information to ITU-R Working Party 5A) - Proposal for a new K-series Recommendation on isolation requirements of base station antennas when co-located with other telecommunications systems � WP 5D 2009-07-16
[ 315 ]
Liaison statement to ITU-R Working Parties 1B and 5A (copy to Working Parties 5B and 5C for information) - On the study of software-defined radio (SDR) and cognitive radio systems (CRS) � WP 5D 2009-07-06
[ 314 ]
Liaison statement to ITU-T Study Group 15 on ANTS (copy for information to ITU-R Working Party 5A) � WP 5D 2009-07-03
[ 313 ]
Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C, 7D and Joint Task Group 5-6 - Development of a Handbook on propagation information for the prediction of interference and coordination distance � WP 3M 2009-06-18
[ 312 ]
Liaison statement - Proposal for a new K-Series Recommendation - Isolation requirements of base station antennas when co-located with other telecommunication systems � ITU-T SG 5 2009-06-04
[ 311 ]
Reply liaison statement to ITU-T Study Group 16 (copy to ITU-R Working Parties 5A and 5D for information) � ITU-R SG 5 2009-06-03
[ 310 ]
Liaison statement to Working Party 5B (copy to WP 5A for information) - Compatibility studies between radiolocation and fixed service in the band 30-300 MHz (WRC-11 Agenda item 1.14) � WP 5C 2009-05-29
[ 309 ]
Liaison statement to Working Party 4A for action on WRC-11 Agenda item 1.13 (copy to WP 5A for information) � WP 5C 2009-05-29
[ 308 ]
Liaison statement to Working Parties 6A, 6B and 6C (copy to Working Parties 4A, 4C, 5A, 7B and 7D for information) - Harmonization of spectrum for use by terrestrial electronic news gathering systems � WP 5C 2009-05-29
[ 307 ]
Liaison statement to Working Party 5D copy to Working Parties 5A and 5B for information - Applicability of Recommendation ITU-R F.1336-2 for sectoral antenna patterns approximation � WP 5C 2009-05-28
[ 306 ]
Construction of the web page for the analytical list of the Study Group 5 Recommendations � Chairman, SG 5 2009-05-27
[ 305 ]
+Ann.1-16
Report on the third meeting of Working Party 5A (Geneva, 18-27 May 2009) � Chairman, WP 5A 2009-05-27
[ 304 ]
Final List of Participants - Working Party 5A (Geneva, 18-27 May 2009) � Director, BR 2009-05-27
[ 303 ]
Liaison statement to ITU-R WP 5A - On the study of Software-Defined Radio (SDR) and Cognitive Radio Systems (CRS) � WP 5C 241-1/5 2009-05-22
[ 302 ]
Liaison statement to WP 5A - Possible use of 5 GHz on board aircraft � WP 5B 2009-05-22
[ 301 ]
Reply to liaison statement to WP 5A - On the study of software-defined radio and cognitive radio systems and their potential impact to the services under purview of WP 5B � WP 5B 2009-05-22
[ 300 ]
Liaison statement on new versions of the Access Network Transport (ANT) Standardization Plan and Work Plan � ITU-T SG 15 2009-05-20
[ 299 ]
Liaison statement on draft baseline text of G.hntreq "Requirements of transport functions in IP home network" � ITU-T SG 15 2009-05-20
[ 298 ]
(Rev.1)
List of documents issued � BR Study Group Department 2009-05-15
[ 297 ]
Fully networked car Workshop, Geneva, 3-4 March 2010 � Director, TSB 2009-05-14
[ 296 ]
Liaison statement to Working Party 5C (copy to WPs 4A, 4C, 5A, 6A, 6C, 7B and 7D for information) - Preliminary draft new Recommendation ITU-R BT.[ENGUSER] - User requirements for electronic news gathering � WP 6B 2009-05-14
Results:795 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2020-12-17