Contributions�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 120 ]
�
� |
Considerations for Proposed input to SG5 Recommendations on 'Data Center Energy Efficiency'
�
� |
Korea (Republic of)
� |
Q19/5
� |
2010-03-30 |
|
[ 119 ]
�
� |
Presentation on the TEER Standards Supporting Transmittal of Documents from ATIS Committee STEP-TEE on "Energy Efficiency for Telecommunications Equipment: Methodology for Measurement and Reporting"
�
� |
ATIS
� |
Q20/5, Q19/5, Q18/5, Q17/5
� |
2010-03-30 |
|
[ 118 ]
�
� |
Electromagnetic disturbance waves enter Ethernet ports in customer telecommunication equipment
�
� |
NTT
� |
Q8/5
� |
2010-03-30 |
|
[ 117 ]
�
� |
Decision of nominal voltage based on compatibility requirements
�
� |
KT
� |
Q19/5
� |
2010-03-30 |
|
[ 116 ]
�
� |
Working document toward draft new Recommendation K.guide
�
� |
Telekomunikacja Polska
� |
Q3/5
� |
2010-03-30 |
|
[ 115 ]
�
� |
Additional supplement of smart antennas calculation for K.guide
�
� |
China Mobile Communications Corporation
� |
Q3/5
� |
2010-03-30 |
|
[ 114 ]
�
� |
Proposal of evaluation of environmental impact for office space
�
� |
Japan
� |
Q18/5
� |
2010-03-30 |
|
[ 113 ]
�
� |
Proposed Introduction and Scope for L.methodology_umbrella
�
� |
Japan
� |
Q18/5
� |
2010-03-30 |
|
[ 112 ]
�
� |
Progress Report on the EARTH Project
�
� |
Alcatel Lucent
� |
Q18/5, Q17/5
� |
2010-03-30 |
|
[ 111 ]
�
� |
Network equipment to be covered
�
� |
Alcatel Lucent
� |
Q18/5
� |
2010-03-30 |
|
[ 110 ]
�
� |
External coaxial cable port test proposal
�
� |
Bourns
� |
Q4/5
� |
2010-03-30 |
|
[ 109 ]
�
� |
Ethernet Field experiences
�
� |
IEEE
� |
Q4/5
� |
2010-03-30 |
|
[ 108 ]
�
� |
Recommendations K.20, K.21 and K.45 - Power Contact Test Proposals
�
� |
IEEE
� |
Q4/5
� |
2010-03-30 |
|
[ 107 ]
�
� |
Higher Voltage DC
�
� |
France Telecom Orange
� |
Q19/5
� |
2010-03-30 |
|
[ 106 ]
�
� |
ICT environmental impact model
�
� |
France Telecom Orange
� |
Q21/5
� |
2010-03-30 |
|
[ 105 ]
�
� |
Scope of Phase 2 of Universal power adapter and charger solution for mobile terminals and other ICT devices
�
� |
France Telecom Orange
� |
Q21/5
� |
2010-03-30 |
|
[ 104 ]
�
� |
The impact of voltage ramp on DC powered telecommunication equipment start-up
�
� |
ZTE Corporation
� |
Q12/5
� |
2010-03-26 |
|
[ 103 ]
�
(Rev.1)� |
Strengthening the refined research for the Energy Efficiency Rating of transport equipment
�
� |
ZTE Corporation
� |
Q18/5
� |
2010-03-26 |
|
[ 102 ]
�
� |
Transmittal of Documents from ATIS Committee STEP-TEE on "Energy Efficiency for Telecommunications Equipment: Methodology for Measurement and Reporting"
�
� |
ATIS
� |
Q20/5, Q19/5, Q18/5, Q17/5
� |
2010-03-26 |
|
[ 101 ]
�
� |
Using data of lightning positioning system for network protection, recovery services or diagnosis by hotline services
�
� |
France Telecom Orange
� |
Q5/5
� |
2010-03-16 |
|
[ 100 ]
�
� |
Proposed Endorsement of "Specification for the reuse of Waste Electrical and Electronic Equipment (WEEE) and used Electrical and Electronic Equipment (EEE)" in an ITU-T Recommendation
�
document withdrawn
� |
UK
� |
Q21/5, Q20/5, Q19/5, Q18/5, Q17/5
� |
2010-01-15 |
|
[ 99 ]
�
� |
Proposed input to SG5 Recommendations on 'Data Centre Energy Efficiency'
�
� |
Telecom Italia, BT and UK
� |
Q21/5, Q20/5, Q19/5, Q18/5, Q17/5
� |
2010-01-15 |
|
[ 98 ]
�
� |
Proposed New Recommendation on 'In-Use and Standby Power Saving Requirements for Broadband Equipment'
�
� |
Telecom Italia, UK
� |
Q21/5, Q20/5, Q19/5, Q18/5, Q17/5
� |
2010-01-15 |
|
[ 97 ]
�
� |
Proposed Endorsement of IEEE 1680 environmental performance criteria for electronic products as ITU-T Recommendations
�
� |
UK
� |
Q21/5, Q20/5, Q19/5, Q18/5, Q17/5
� |
2010-01-15 |
|
[ 96 ]
�
� |
Considerations for determination the value of the Nominal voltage in the draft recommendation L.specHVDC
�
� |
KT
� |
Q19/5
� |
2010-01-11 |
|
[ 95 ]
�
� |
Output current proposal for L.1000 (L.adapter)
�
� |
China
� |
Q21/5
� |
2010-01-11 |
|
[ 94 ]
�
� |
Simple evaluation models for USN applications and services
�
� |
ETRI
� |
Q18/5
� |
2010-01-11 |
|
[ 93 ]
�
� |
Modular method to assess positive and negative impacts
�
� |
France Telecom Orange
� |
Q18/5
� |
2010-01-11 |
|
[ 92 ]
�
� |
Proposed Specifications of Power Feeding Systems
�
� |
NTT
� |
Q19/5
� |
2010-01-11 |
|
[ 91 ]
�
� |
Proposed Outline of L.methodology_ICT Goods and Services Document
�
� |
Telefon AB - LM Ericsson
� |
Q18/5
� |
2010-01-11 |
|
[ 90 ]
�
� |
Presentation of the Earth Project
�
� |
Alcatel Lucent
� |
QALL/5
� |
2010-01-11 |
|
[ 89 ]
�
� |
Eco-management guidance of ICT equipment
�
� |
Federal Republic of Germany
� |
Q18/5
� |
2010-01-08 |
|
[ 88 ]
�
� |
Proposal for use of "ICT products" instead of "ICT goods and services" for L.methodology_ICT_goods and services
�
� |
ETRI
� |
Q18/5
� |
2010-01-08 |
|
[ 87 ]
�
� |
Proposed Methodology for Evaluating Environmental Load of Network Infrastructure
�
� |
Japan
� |
Q18/5
� |
2010-01-08 |
|
[ 86 ]
�
� |
Proposal of a new draft Recommendation on a method to provide recycling information of rare metals in ICT products
�
� |
Republic of Korea
� |
Q21/5
� |
2010-01-08 |
|
[ 85 ]
�
� |
Clarification for the work scope of L.methodology_ICT_in_organizations
�
� |
Republic of Korea
� |
Q18/5
� |
2010-01-08 |
|
[ 84 ]
�
� |
Proposal for the initial draft Recommendation of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"
�
� |
Republic of Korea
� |
Q18/5
� |
2010-01-08 |
|
[ 83 ]
�
� |
Compliance with existing standards for L.methodology_ICT_projects
�
� |
Republic of Korea
� |
Q18/5
� |
2010-01-08 |
|
[ 82 ]
�
� |
Proposal for the scope of L.methodology_ICT_projects
�
� |
Republic of Korea
� |
Q18/5
� |
2010-01-08 |
|
[ 81 ]
�
� |
Proposal for the coverage of L.methodology_ICT_projects for various environmental issues
�
� |
Republic of Korea
� |
Q18/5
� |
2010-01-08 |
|
[ 80 ]
�
� |
Status update for ISO/IEC JTC 1 Green ICT standardization activities
�
� |
ETRI
� |
Q17/5
� |
2010-01-08 |
|
[ 79 ]
�
� |
Information and proposal for clarification on the ICT sector
�
� |
ETRI
� |
Q18/5
� |
2010-01-08 |
|
[ 78 ]
�
� |
Proposal for clarification on the ICT sector
�
� |
ETRI
� |
Q18/5
� |
2010-01-08 |
|
[ 77 ]
�
� |
Environment and climate change
�
� |
Ministry PTT Dem. Rep. Congo
� |
Q17/5
� |
2010-01-05 |
|
[ 76 ]
�
� |
GDT Self-Oscillation
�
� |
IEEE
� |
Q4/5, Q13/5
� |
2009-10-02 |
|
[ 75 ]
�
� |
Reference Model for Recurring GHG Footprint of ICT equipment
�
� |
Juniper Networks
� |
Q21/5, Q20/5, Q19/5, Q18/5, Q17/5
� |
2009-10-02 |
|
[ 74 ]
�
� |
Method for Assessing Potential Carbon Dioxide Equivalent Emission Reduction of ICT Services
�
� |
Telefon AB - LM Ericsson
� |
Q18/5
� |
2009-10-02 |
|
[ 73 ]
�
� |
ICT Specific Life Cycle Assessment for Products and Systems
�
� |
Telefon AB - LM Ericsson
� |
Q18/5
� |
2009-10-02 |
|
[ 72 ]
�
� |
Proposal of Study Items Related to Specifications of Power Feeding Systems
�
� |
NTT
� |
Q19/5
� |
2009-10-02 |
|
[ 71 ]
�
� |
Experimentation performed by FT and SNCF on ADSL disturbances created by the passage of trains
�
� |
France Telecom Orange and SNCF
� |
Q9/5
� |
2009-10-02 |
Resultats:520 documents R�sultats :�
Pr�c�dent�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):