Contributions�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 152 ]
�
� |
Proposals on Document IMT-2030/2 - Process
�
� |
China
� |
� |
2024-06-07 |
|
[ 151 ]
�
� |
Considerations on the test environments of IMT-2030
�
� |
China
� |
� |
2024-06-07 |
|
[ 150 ]
�
� |
Proposals on the draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]
�
� |
China
� |
� |
2024-06-07 |
|
[ 149 ]
�
� |
Proposal for draft text of IMT-2030 Circular Letter
�
� |
China
� |
� |
2024-06-07 |
|
[ 148 ]
�
� |
Proposal for working document towards a preliminary draft a new Report ITU-R M.[IMT.A2G] - Non-safety communications between base stations on ground and airborne user equipment devices supported by the terrestrial component of IMT
�
� |
China
� |
� |
2024-06-07 |
|
[ 147 ]
�
� |
Proposal on the preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43-GHZ]
�
� |
China
� |
� |
2024-06-07 |
|
[ 146 ]
�
� |
Proposal on new study of possible coordination of space research service (deep space) stations operating in the band 7 145-7 190 MHz with IMT stations operating in the band 6 425-7 125 MHz
�
� |
China
� |
� |
2024-06-07 |
|
[ 145 ]
�
� |
Proposal on the IMT parameters towards WRC-27 agenda item 1.13
�
� |
China
� |
AI1.13
� |
2024-06-07 |
|
[ 144 ]
�
� |
Draft working document on sharing and compatibility studies of IMT systems in the frequency band 4 400-4 800 MHz
�
� |
China
� |
� |
2024-06-07 |
|
[ 143 ]
�
� |
Proposed revision of work plan for the working document on characteristics of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-27
�
� |
China
� |
� |
2024-06-07 |
|
[ 142 ]
�
� |
Proposal on the IMT parameters for the frequency band 14.8-15.35 GHz towards WRC-27 agenda item 1.7
�
� |
China
� |
AI1.7
� |
2024-06-07 |
|
[ 141 ]
�
� |
Proposals for modification of the working document towards a preliminary draft new Report ITU-R M.[IMT.A2G]
�
� |
Russian Federation
� |
� |
2024-06-07 |
|
[ 140 ]
�
� |
Analysis of the frequency plans of Recommendation ITU-R M.1036 for MSS applications and draft reply liaison statement to Working Party 4C
�
� |
Russian Federation
� |
� |
2024-06-07 |
|
[ 139 ]
�
� |
Proposed characteristics of IMT for sharing studies in the frequency band 4 400-4 800 MHz
�
� |
Russian Federation
� |
� |
2024-06-07 |
|
[ 138 ]
�
� |
Proposals on the structure of Report ITU-R M.[IMT-RLAN] and detailed work plan
�
� |
Russian Federation
� |
� |
2024-06-07 |
|
[ 137 ]
�
� |
Liaison statement on revised ITU work related to ITS presented at 3GPP Stage-1 Workshop on IMT-2030 use cases
�
� |
CITS EG-ComAD
� |
� |
2024-06-06 |
|
[ 136 ]
�
� |
Liaison statement on parameters for 4 400 to 4 800 MHz of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-27
�
� |
Director, BR
� |
� |
2024-06-04 |
|
[ 135 ]
�
� |
Update on activities in Region 2
�
� |
Region 2 Rapporteur
� |
� |
2024-06-03 |
|
[ 134 ]
�
� |
Considerations on capabilities towards preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]
�
� |
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
� |
� |
2024-06-03 |
|
[ 133 ]
�
� |
Proposal of test environment for IMT-2030
�
� |
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
� |
� |
2024-06-03 |
|
[ 132 ]
�
� |
Reply liaison statement to Coordination Committee for Terminology (copy to Working Parties 5B, 5C and 5D for information) - Definition of utility radiocommunications systems
�
� |
WP 5A
� |
� |
2024-05-30 |
|
[ 131 ]
�
� |
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 3J, 4A, 4C, 5A, 5B, 5D, 7A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.15
�
� |
WP 5C
� |
AI1.15
� |
2024-05-29 |
|
[ 130 ]
�
� |
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5D, 6A, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.13
�
� |
WP 5C
� |
A1.13
� |
2024-05-29 |
|
[ 129 ]
�
� |
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.7
�
� |
WP 5C
� |
AI1.7
� |
2024-05-29 |
|
[ 128 ]
�
� |
Reply liaison statement to Working Party 7C (copy to Working Parties 3M, 4A, 5A, 5B, 5D and 7B for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.19
�
� |
WP 5C
� |
AI1.19
� |
2024-05-29 |
|
[ 127 ]
�
� |
Reply liaison statement to Working Party 5D (copy for information to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5C, 7B, 7C, 7D and ICAO) - Relevant technical information for sharing studies under WRC-27 agenda item 1.7
�
� |
WP 5B
� |
AI1.7
� |
2024-05-28 |
|
[ 126 ]
�
� |
Reply liaison statement to Working Party 4C (copy to Working Party 5D for information) - Relevant technical information for sharing studies under WRC-27 agenda item 1.13
�
� |
WP 5B
� |
AI1.13
� |
2024-05-28 |
|
[ 125 ]
�
� |
Support for approval and proposed edits to the preliminary draft revision of Recommendation ITU-R M.1036
�
� |
Brazil
� |
� |
2024-05-24 |
|
[ 124 ]
�
(Rev.1)� |
Working document on sharing and compatibility studies under WRC-27 agenda item 1.7
�
� |
Brazil
� |
� |
2024-05-24 |
|
[ 123 ]
�
� |
Proposed reply liaison statement to Working Party 4C on work related to WRC-27 agenda item 1.13
�
� |
Brazil
� |
� |
2024-05-24 |
|
[ 122 ]
�
� |
Liaison statement from ITU-D Study Group 1 Question 3/1 to ITU-R Working Party 5D on IMT for broadband public protection and disaster relief
�
� |
ITU-D SG1
� |
� |
2024-05-27 |
|
[ 121 ]
�
� |
Liaison statement on initiation of draft new technical Report ITU-T TR.SP-UAV - Signalling requirements and protocols between unmanned aerial vehicles and unmanned aerial vehicle controllers using IMT-2020 networks and beyond
�
� |
ITU-T SG11
� |
� |
2024-05-20 |
|
[ 120 ]
�
� |
Draft framework for working document for sharing and compatibility studies of IMT systems in the frequency bands [XXX-YYY] MHZ
�
� |
United States
� |
� |
2024-05-17 |
|
[ 119 ]
�
� |
Liaison statement to Working Party 5D - Progress on the work on elements on a working document towards a new Recommendation/Report ITU-R S.[MITIGATION MEASURES]
�
� |
WP 4A
� |
� |
2024-05-16 |
|
[ 118 ]
�
� |
Initial reply liaison statement to Working Party 5D - Relevant technical information to support studies under WRC-27 agenda item 1.7
�
� |
WP 4A
� |
AI1.7
� |
2024-05-15 |
|
[ 117 ]
�
� |
Liaison statement to Working Parties 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D (copy to Working Party 7C for information) - Information to support studies under WRC-27 agenda item 1.1
�
� |
WP 4A
� |
AI1.1
� |
2024-05-13 |
|
[ 116 ]
�
� |
Liaison statement to Study Groups 5 and 7 (copy to Study Group 1 for information) - Activities in response of Resolution 219 (Bucharest, 2022) and Resolution ITU-R 74 (RA-23)
�
� |
SG 4
� |
� |
2024-05-10 |
|
[ 115 ]
�
� |
This document has been withdrawn
�
� |
N/A
� |
� |
2024-05-10 |
|
[ 114 ]
�
� |
Report on disaster relief
�
� |
Disaster Relief Liaison Rapporteur
� |
� |
2024-05-06 |
|
[ 113 ]
�
� |
Liaison statement on results of the sixth meeting of the FG-MV
�
� |
ITU-T FG-MV
� |
� |
2024-05-06 |
|
[ 112 ]
�
� |
Liaison statement to Working Parties 3L, 4B, 5A, 5C, 5D, 7B, and 7C (copy to Working Party 4A for information, and action if any) - Relevant technical information to support studies under WRC-27 agenda item 1.14
�
� |
WP 4C
� |
AI1.14
� |
2024-05-01 |
|
[ 111 ]
�
� |
Liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Technical information to support the studies for WRC-27 agenda item 1.13
�
� |
WP 4C
� |
AI1.13
� |
2024-05-01 |
|
[ 110 ]
�
� |
Liaison statement to Working Parties 3L, 3M, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 7D (copy to Working Party 4A for information, and action if any) - Relevant technical information to support studies under WRC-27 agenda item 1.12
�
� |
WP 4C
� |
AI1.12
� |
2024-05-01 |
|
[ 109 ]
�
� |
Liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 7D - WRC-27 agenda item 1.11
�
� |
WP 4C
� |
AI1.11
� |
2024-05-01 |
|
[ 108 ]
�
� |
Initial reply liaison statement to Working Party 5D - Relevant technical information to support studies under WRC-27 agenda item 1.7
�
� |
WP 4C
� |
AI1.7
� |
2024-05-01 |
|
[ 107 ]
�
� |
Reply liaison statement to Working Party 5D - Work related to WRC-27 agenda item 1.13
�
� |
WP 4C
� |
AI1.13
� |
2024-05-01 |
|
[ 106 ]
�
� |
Cognitive radio spectrum access and resource management for reconfigurable communication networks for future networks
�
� |
General Authority of Communication and Informatics (Libya)
� |
� |
2024-04-28 |
|
[ 105 ]
�
� |
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)
�
� |
Chair, CCV
� |
� |
2024-04-22 |
|
[ 104 ]
�
� |
Liaison statement on deliverables of FG-TBFXG
�
� |
FG-TBFxG
� |
� |
2024-04-18 |
|
[ 103 ]
�
� |
Contribution for ITU-R M.[IMT-2020.UNWANT.(MS/BS)] regarding DECT-2020 NR
�
� |
European Telecommunications Standards Institute (France)
� |
� |
2024-04-17 |
Resultats:552 documents R�sultats :�
Pr�c�dent�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):